ren
Bar Cutting - Gntinuovs Beams
= + ¥ 4 call
NScP Require ments
409.7.3
—> Flexural Reinforcement in
Non Prestressed Beams
NO See
_> Reinforcement shall be extend beyond
ane point Bewiieh tris N° longer
required de cesist Sle xu he a
distance cqual 4dothe greater of A
and Pap , except ot supports of
- supporteel spans ond at
Site
of cantileversce ment
> A simple supports vat least one _third
the maximum posttic moment
remforcenent shail extend along
the bearn bottom imo the support
eas (ooo. 3! except for precast
beams where such ceinfoecement
shall extend at least +o the center
of she bear ng leng}h.
409.7, 3.8.1
= At other supports, of least
one - South tne maximum posit? ve
moment geinfrcement shall extend
along 4he beam bottom int He
support at least [5Dmmn.as Bre = Hed of the neg ative
ent reinSorcement at a suppor
mom
leng+b
shall nave on embedment
beyond the point of in Plection
at least +he greatest of
Ad, itd, and Inu
ye a
max momest
# Bar extension Xe — A
gceater & eaeie
Ly La
Teeminating bars
larger AS fo
[eee fe
———— | Prec |
“4
find
mi 2 bars for
Conti nuow> bars (
Top and Bot
)
—_—rE |
De velopment - leng
Z Fro
T= bond force
wat
by = wdpa
Ag- Hide
4a
¥ Sources of bond strength
—y Adnesion ectween concrete ond che!
ab Friction
9 of bar gibson enctete
+ BearinLoss jin Bond Strength
and one-half clear spacing
a) Side cover
thor cover
vcAween bars =e Ge
loXe)
KX
b) Cover on sides and botton equal and
Ze one- half clear spacin9d between
bars
2) Bottom cover < Side @ver< one -hal?
clear Spacing between barsDeemed wite in tension
425. 4.2. |
|
nee 2 425. 4.2.5
425. 4.2. 3in which the conknement term Cot Ker) /dte
shall not exceed 2.5, 00
ee Yo Ate
——_
sn
eis
Fabien 42>. 4.2.2
eas Development Length re Defarmee)
Bars and Defrmed Wires 19 Tension
case 1
—> clear spacing of bars oc wites Peng
developed of laP spliced Rorioss 1100
dp, clear cover at kast db,and shemps
octhes shough out db not lecothon
4ne code mininum, or
c\ege spacing of bars or wire $ being
dleveloped of lap spliced aot kast
adb and clear Gaver at least Jbfy Ve Ye
IT TR!aes i mwa
Case 2
Ofher cases
20 mm and cmaller
bars and pee
deformed wices
ae
LIA Je!
SS
95 o and
mod and | ine 4 i
Larger hoeProte 495 42.4
Modi Beaton Factors tor Developm eat oft
Dehrmed Bars Gnd Deformed wires in
Tension
Epoxy 1 Ye
Epoxy coated
cein force ment with
clear cover lees than ——y |.5
3d, or clear Spaany
Jess than Gdb
Epoxy ooted fir ail
other conditions es
Un coated emg 1. OLQ
ain
Size j Ys
Zo mm and larger ag 3
wand sal emaller bars —> 0.8
casting Position - Ve
jhan 300 mm of Fresh
13
More
on2zontal
concrete placed below
reinforcement
other eatBerk oF Stondord Hooks in
425-4. 3.1
(fit
Jay = greatecct i” Arh SR
Sn
)50 me
Table 425.4.3.2
Mo dik cation Factors Rr Development
of Yeoked bars in Tension
Ep oxy oes
Coated —> 1.2.
Unaated —+ |.0C—O OE
Covers gs
36 0" ¢ bac ond emallec heoks
width side cover = oem) and asi
Re ao -deg hook with cover ON
par extension beyond nook = mm
peer? |
conning Reebremat Y,
For qo-deg Rooks ot
mm & and cmalles 0,8
3G
acs
ae ay OS