You are on page 1of 1

IMPORTANT NOTES: PROJECT: SHEET CONTENT: REV.

DESCRIPTION DATE PREPARED BY: SCALE AS SHOWN


DWG. NO.:
THESE DRAWINGS AS AN INSTRUMENTS OF SERVICES,
---
RECEIVING LINE AND SERVICE LINE FOR TANK 24
DESIGN CHECKED BY: ----

ARE THE PROPERTY AND DOCUMENTS OF UPPI. IT NEW TANK ADO & MOGAS APPROVED BY: ----
SHALL BE UNLAWFUL FOR ANY PERSON, WITHOUT
THE WRITTEN CONSENT OF UPPI OR AUTHORS OF THE
--- TEAM
SAID DOCUMENTS, TO DUPLICATE OR COPY SAID PRC No. --- Validity --- UPPI ENGINEERING DRAWN BY: ----
INTERNATIONAL CORP DOCUMENT ( R.A. 545 SECTION 25 (4) ). PTR --- Date ---
LOCATION Lucanin, Mariveles, Bataan
DEPARTMENT
DATE SUBMITTED: ----
Place --- TIN --- SHEET NO.:

You might also like