3" CC casting (1:2:4)

3" Brick Soling

Brick Steps
10' upvc 3"dia(D class) Pipe connect

1'-6"
with existing drainage
5"
G.L.

10"
G.L. Sand Filling

6" 15"X15"X12" 6"


CC casting 10"
10"

1'-10"

SECTIONAL ELEVATION

1'-5"
3'-6"

2'-1" 5'-0"

6'-0"
11'-5"
1'-8"

TOP PLAN

Drawn by: Project :Tube-well platform


Upgradation & rehabilitation tube-wells platform affected by
fire incident Checked by: Drawing : #1

Approved by: Rev.


UKHIYA & TEKNAF UPAZILA, COX'S BAZAR
Scale: NTS Date: 01-07-2023