Tender Inviting Authority: SUPRINTENDING ENGINEER, II CIRCLE IRRIGATION WORK'S KANPUR


Name of Work: जनपद कानपुर नगर में कानपुर शाखा के किमी0 188.366 के दांयी ओर निकलने वाली नई
अल्पिका के किमी0 5.200 से किमी0 7.320 तक निर्माण कार्य।
LOT No: 01
Name of the
Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed
to enter the Bidder Name and Values only )
NUMBER # TEXT # NUMBER # TEXT # NUMBER # NUMBER # TEXT #
Sl. Item Description Quantity Units BASIC TOTAL TOTAL AMOUNT
No. RATE In AMOUNT In Words
Figures To be Without Taxes in
entered by Rs. P
the Bidder
Rs. P

1 2 3 4 5 6 7
Earth work in foundation in wet ordinary soil (Loam, clay or sand) including lift
upto 1.50 m. and lead upto 30 m. and including filling, watering and ramming of
excavated earth into the trenches or into the space between the structure
1 302.00 Cum #VALUE! #VALUE!
and the sides of foundation trenches or into the plinth with removal and
disposal of surplus earth as directed by the Engineer- in- charge upto a
distance of 30 m. from the foundation trenches.

Providing & laying Cement Concrete (M10) 1:3:6 (1 cement :3 coarse sand : 6
Aggregate) in foundation with cement coarse sand and stone grit 20-40mm
2 gauge including proper curing and compaction including cost of all material, 17.00 Cum #VALUE! #VALUE!
Labour T&P etc required for proper completion of Work as per ID specification
& as per direction of Engineer-in-Charge.
Providing & laying Reinforced Cement Concrete (M20) 1:1.5:3 (1 cement :1.5
coarse sand : 3 Aggregate) with cement coarse sand and stone grit 20mm gauge
3 including proper curing and compaction including cost of all material, Labour 86.00 Cum #VALUE! #VALUE!
T&P etc required for proper completion of Work as per ID specification & as
per direction of Engineer-in -charge.
Centering & shuttering for Reinforced Cement Concrete work including cost of
4 shuttering, material, Labour, T&P etc required for proper completion of work 253.00 Sqm #VALUE! #VALUE!
as per ID specification & direction as per Engineer-in -charge.
Providing & laying Cement Concrete for Wearing coat 1:1:2 (1 cement :1 coarse sand : 2
Aggregate) with cement coarse sand and stone grit 10 mm gauge including proper curing
5 and compaction including cost of all material, Labour T&P etc required for proper 3.00 Cum #VALUE! #VALUE!
completion of Work as per ID specification & as per direction of Engineer-in-charge.

Providing and Laying Steel reinforcement including cutting, bending, binding & placing
in position including cost of all material, Labour T&P etc required for proper completion of
6 Work as per ID specification & as per direction of Engineer-in-charge. 11.00 MT #VALUE! #VALUE!

Providing & fixing 100 mm dia PVC pipe in drainage spout i/c cost of all material, labour
7 and T&P etc. For proper completion of work as per direction of Engineer-in-charge. 4.00 Rm #VALUE! #VALUE!

Brick on edge soling i/c cost of all material, labour and T&P etc. For proper completion of
8
work.
300.00 Sqm #VALUE! #VALUE!
NUMBER # TEXT # NUMBER # TEXT # NUMBER # NUMBER # TEXT #
Sl. Item Description Quantity Units BASIC TOTAL TOTAL AMOUNT
No. RATE In AMOUNT In Words
Figures To be Without Taxes in
entered by Rs. P
the Bidder
Rs. P

1 2 3 4 5 6 7
Providing mixing and laying of Cement concrete (M15) 1:2:4 (1 cement: 2 sand:4
aggregate) inclusive of all lead lift material, labour T&P etc required for proper completion
9 of work as per ID specification & direction as per direction of Engineer in Charge. 511.00 Cum #VALUE! #VALUE!

roviding and Laying of LDPE FILM 200 micron including cost of all material labour and
10 T&P required for proper completion of work as per direction of engineer in charge 8417.00 Sqm #VALUE! #VALUE!

60 mm thick cement concrete (M15) in lining 1:2:4 (1 cement: 2 sand:4 aggregate of size
9-20 mm) incl. all lead lift material labour T&P etc required for proper completion of
11 work as per ID specification & direction as per direction of Engineer in Charge. 8417.00 Sqm #VALUE! #VALUE!

Preparation of subgrade excluding cost of earth work but including cutting and dressing of
earth surface to required shape and size including cost of labour T&P etc required for
12 proper completion of work as per ID specification & direction as per direction of Engineer 8417.00 Sqm #VALUE! #VALUE!
in Charge.
Making Contraction /Expansion joint 60mm thick filled with approved sealing compound
13 including all material labour T&P etc required for proper completion of work as per ID 3656.00 Rmt. #VALUE! #VALUE!
specification & direction as per direction of Engineer in Charge.
Centering and shuttering of CC work including cost of shuttering, material, labour T&P etc
14 required for proper completion of work as per ID specification & direction as per direction 1063.00 Sqm #VALUE! #VALUE!
of Engineer in Charge.
Providing and applying a coat of residual petrolium bitumen of grade VG 10 of approved
15 quality using 1.7 Kg per square meter on sleeper after cleaning the surface with brushes 1026.00 Sqm #VALUE! #VALUE!
and finally with piece of cloth lightly soaked in Kerosene oil.
Earth work in embankment in ordianry soil,excavation to be in the form of irregular pits &
earth work in embankment to be in 20 CM layers, incl. mechanical compaction & dressing
16 the surface to the required level & slopes & also incl 1.50 M lift & carriage of earth by 11678.00 Cum #VALUE! #VALUE!
tractor trolly upto 1.00 Km incl the cost of earth as directed by Engineer-in- charge.

Total in Figures #VALUE! #VALUE!

Quoted Rate in Words #VALUE!


Please Enable Macros to View BoQ information