You are on page 1of 5

ZTE GERAN&UTRAN OSS ROADMAP

ZTE GERAN&UTRAN OSS ROADMAP 1/3

2G/3G RAN Unified 3rd Party Network Flex GB/A Parameter optimization to 3rd
Management Optimize Tools A/Abis Over IP Party System (2G/3G Optimi
Remote Diagnosis Interface of 2G(Optimi Site Migration Tools XParamter)
Test X-AFP, Actix Cell Opt) Femto of 2G EMS & NE Healthy Check
Integration to Massive MR Collection Management Massive MR Collection for 3G
Aircom Optima of 2G Dual-mode SDR Tools for Massive Radio
CTS (Centralized Call Management Parameter Update
Trace System Interface) Inventory Management ODD (Office dependency Data)
Call Failure Record Interface

2007.Q3 2008.Q1 2008.Q3 2009.Q2


V07R2 V08R1 V08R2 V09R1
M31 V3.10.400 M31 V3.10.410 M31 V3.10.410 M31 V3.10.421

 High Avaiilbility  Disaster Recovery  SUN T&M Server


Solution Solution Series
 Remote access (Citrix )
Released Planned Planning

2
ZTE GERAN&UTRAN OSS ROADMAP 2/3

CDT Collection & Analysis Multi-mode NodeB RAN Sharing


 LTE Unified Management management SON Phase2 (Self
 KPI Correlate Alarm Fault Correlation Analysis Configuration of LTE)
NE Stability Report EMS Self Monitoring BS Power Supply
SON Phase1 (NE Self- EMS Stability Report Management (ZTE’s Power
Discovery for LTE ) SOAP NBI Supply)
Performance WEB Report Microwave Management
Remote OMC Upgrade (ZTE’s Microwave)
Automatic

2009.Q4 2010.Q2 2010.Q4


V09R2 V10R1 V10R2
M31 V3.10.431 M31 V12.10.20 M31 V12.11.20

 HP Integrity/X86 Series Cluster Support


 4A Centralized Security

Released Planned Planning

3
ZTE GERAN&UTRAN OSS ROADMAP 3/3

SON Phase3 (Self SON Phase4 (Self Healing Service Quality


Optimization of LTE) of LTE) Analysis (End to End)
Inter-NE Network Service Quality Monitor(End
Performance Analysis to End)
RAN/CN Interface
Parameter Consistency
Check

2011 2012 2013


V11R2 V12R2 V13R2
M31 V12.21.20 M31 V12.31.20 M31 V12.41.20

Released Planned Planning

You might also like