You are on page 1of 6

ISO percent sy ey Source Note

AUS 3.63 1990 2015 NIR 2017 Volume 3, p132


AUT 2.3 1990 2015 NIR 2017 p200
BEL 7.07 1990 2015 NIR 2017 p295 Annex 2
BGR 2.1 1990 2015 NIR 2017 p453 Table 276 Annex 2
CAN 12 1990 2015 NIR 2017 Part 2 p24 Table A2-1
CHE 3.6 1990 2015 NIR 2017 p525 Annex 2 Table A-2
CYP 5 1990 2015 NIR 2017 pp229-253 Annex 1 5% for each year 1990-2015
CZE 2.83 1990 2015 NIR 2017 p435 Table A2-2
DEU 3.20 1990 2015 NIR 2017 p296
DNK 2.24 1990 2015 NIR 2017 p63 Table 1.3
ESP 8 1990 2015 NIR 2017 pA6.7 (p1328)
EST 0.5 1990 2015 NIR 2017 p538 Table A.2.1 Annex 2
FIN 5 1990 2015 NIR 2017 p491 Annex 2 Table 1
FRA 9.1 1990 2015 NIR 2017 p573 Table 156 Uncertainty is provided only for 1990, and
GBR 3.2 1990 2015 NIR 2017 p641 Annex 2
GRC 2.8 1990 2015 NIR 2017 p487 Annex IV Table IV.2 Combined uncertainty is reported as 0.
HRV 2.8 1990 2015 NIR 2017 Annex 2 p58 Table 3.3
HUN 3.54 1990 2015 NIR 2017 Annex 2 pA29 Table A2-1
IRL 2.12 1990 2015 NIR 2017 Annex 2 p472 Table 2.A.i
ISL 8.2 1990 2015 NIR 2017 Annex II p263 Only for 2A, not 2A1
ITA 10.4 1990 2015 NIR 2017 Annex 1 p389 Table A1.5
JPN 4 1990 2015 NIR 2017 Annex 2 pAnnex2-3 Table A2-3
LIE NO 1751 2015
LTU 5 1990 2015 NIR 2017 Annex II p63 Table 1a
LUX 2.69 1990 2015 NIR 2017 p84
LVA 9.4 1990 2015 NIR 2017 Annex 2 p734
MLT NO 1751 2015
NLD 11 1990 2015 NIR 2017 Annex 2 p329 Table A2.3
NOR 0.72 1990 2015 NIR 2017 Annex II p5 p9
NZL 7.3 1990 2015 NIR 2017 Annex 2 Table A2.1.2 p442 Only for 2A, not 2A1
POL 5.7 1990 2015 NIR 2017 p125 Only for 2A, not 2A1
PRT 9.08 1990 2015 NIR 2017 p4-6 Table 4.1 They've calculated the combined uncerta
ROU 2.83 1990 2015 NIR 2017 p361
SVK 2.875 1990 2015 NIR 2017 p140
SVN 14.142 1990 2015 NIR 2017 Annex 2 Table 3.3
SWE 5.4 1990 2015 NIR 2017 Annex 7 p173 Table A7.1
TUR 5.39 1990 2015 NIR 2017 Annex 2 Table A6 p486
UKR 5.734 1990 2015 NIR 2017 p120
USA 6 1990 2015 NIR 2017 Annex 7 Table A-280 pA-453

JAM 5.39 1995 2015 BUR1 p98 Table 0.41


BRA 4 1990 2010 NC3 Volume 3 p197 Table 4.1
CHL 26.5 1990 2013 NIR2 2016 p196
MRT NO 1751 2015 NIR 2015 p55 All of Mauritania's clinker is imported.
UZB 6.1 1990 2012 NIR 2016 p61
MDA 3.6056 1990 2010 NIR 2013 p374
ARM 10 1990 2012 Estimated Only two plants. Uncertainty should be hi
MEX 15 1990 2012 Estimated
IDN 15 2000 2012 Estimated
IND 20.6 1990 2015 NC2 Table 2.24 p78 Applies only to official estimate for 2000,
CHN 15 1990 2016 Estimated
NAM 10 2011 2012 Estimated Only one plant, so expect reasonable activ
AZE 15 1990 2012 Estimated
KOR 5 1991 2015 Estimated Expect activity data to be of high quality,
ZAF 10 2000 2010 Estimated

USA 10 1925 1989 Estimated Based on clinker data


ch year 1990-2015

ty is provided only for 1990, and only for 2A, not 2A1. Confirmed same uncertainty for 2015 from data downloaded from https://www

d uncertainty is reported as 0.

alculated the combined uncertainty incorrectly. Uncertainty on CKD is 30%x0.02 not 30%. I've calculated myself, and taken the maximu

uritania's clinker is imported.

plants. Uncertainty should be higher before 2000, because Tier-II was used for that period.
nly to official estimate for 2000, but I have applied it to all years I've estimated with same EF and similar sources for activity data.

plant, so expect reasonable activity data. IPCC default EF.

tivity data to be of high quality, EF is IPCC default.

clinker data
nloaded from https://www.citepa.org/fr/activites/inventaires-des-emissions/secten

self, and taken the maximum of the range for the activity uncertainty.
rces for activity data.

You might also like