You are on page 1of 1

When is Green Hydrogen considered fully renewable?

Operating model I:
Operating model II: production installation with grid connection
direct connection
Production without grid Imbalance
>90% rule French rule General grid electricity
electricity settlement

► Direct connection of ► Bidding zone ► Electricity is ► Low carbon bidding zone ► No operating/ investment aid for
H2/NH3 generation and >90% RE share obtained from RE (under 18g CO2/MJ) electricity generating installation
electricity generation installation during
installation / production ► Specifically ► RE-PPA needed ► RE-PPA needed
redispatch
within the same installation identified share
determines the ► RFNBO
► No grid connection / proof number of annual production reduced Temporal correlation Temporal correlation
of no use of grid electricity operating hours the need for
for production redispatch Geographical
Geographical correlation
correlation

Additionality Additionality

Adapted from Stiftung Umweltenergierecht, Der delegierte Rechtsakt für grünen Wasserstoff, 7 March 2023

You might also like