K A F D 1 2 3 4 P r o j e c t W e b s i t e > D e si g n Q u e r i e s K n ow le d g e b a s e > P r o t e ct i o n o f M V c a b l e s i n B a s e m e n t
RefNo PAW-DQ-1179
Consultant Perkins_Will
Discipline EL
Date 17/03/2010
Query Item Kindly advise if any specific protection from physical damage (ex. L-shaped
concrete attic) is required at basement levels for the protection of the MV cable
trays routed inside the basement, specifically above car parks and circulation
areas.
Response 1) Routing from the manhole, outside the parcel, to the SEC room: A closed
concrete trench in basement 1 ceiling is to be provided along with side
openings for access every 5-10 m .
2) Routing from SEC room to RMUs: Cable tray (horizontal routing) , and
cable ladder (vertical routing).