Production Schedule

Please include location, time of film, what you are filming and team members including
actors

Date Plan of action Evaluation /


Week beginning behind the
scenes
22/01/24 Get all the smaller speaking roles recorded Record with
a recording
device at a
gathering
22/01/24 Record Foley sounds Record
activities
that could
make
interesting sounds
29/01/24 Download Foley sounds that I could not record SoundCloud
myself
29/01/24 Find background music SoundCloud
29/01/24 Record the main character’s lines in the radio Record with Isla in the
booth booth
29/01/24 Edit the production. Adobe Audition
22/01/24 Audition the role of Savanna Find 3 people to
audition for the main
role of Savanna
29/01/24 More recording in the booth Recording side
characters’ lines with
Logan and Brandon
22/01/24 Write script Get a full draft of the
script for the production
22/01/24 Casting Create full cast list