You are on page 1of 1

CONFIDENTIAL, DO NOT SHARE WITH ANY THIRD PARTIES

SITE ACQUISITION AND PERMITTING SCOPE OF WORK DATE: 19-JAN-2024

Item Code Line Item Description Final Unit Price REMARKS


Site Hunting to Signed COL

SAQ001 Site Acquisition Survey Report Site hunting and securing of possible rollout optiom

SAQ002 Signed MOC/NTP Lease negotiation, secure signed MOC/NTP

TCT, TD, TC, SPA (if needed), LIS,bank statement,lessor


SAQ003 Property/Ownership Documents
ID; NTP from Lessor with signed draft COL

SAQ004 Notarized COL Notarized and signed COL by both MIDC and Lessor

SAQ005 Segregation Plan or SI Signed segregation plan for GF; Signed SI for RT

Pre-Construction Permit

Neighbor’s Consent & Homeowner’s Association


PER001 Neighbor's Consent and/or Homeowner's Consent/ Certificate (if applicable) and to Provide
Mapping sketch for Neighbors (If applicable)

PER002 Barangay Resolution / Barangay Clearance Secure Barangay Resolution / Barangay Clearance

Secure CAAP Clearance / Height Clearance Certificate;


PER003 (CAAP) - Includes Traverse Computation
Including traverse computation

PER004 Zoning Certification & Location Clearance Secure Zoning Certification & Location Clearance

Sign and sealing of pre-construction requirements .i.e.,


FOR ITEM CODE CREATION Sign and Sealing Pre-Construction Requirements
Detailed Design and Drawing, Forms , and Certificates

Secure Building Permit, including all ancillary permits


PER005 Building Permit i.e., Electrical, Mechanical, Fencing, and Electronics
Permit
Services incurred to secure pre-construction permits i.e.,
FOR ITEM CODE CREATION Cost to Acquire Pre-Construction Permit
manpower, legwork and other fees
Post-Construction Permit

PER010 Fire Clearance Permit (for Occupancy) Secure Fire Safety Inspection Certificate (FSIC)

FOR ITEM CODE CREATION Megger Test (If applicable) Megger Testing and Result

PER011 Certificate of Final Electrical Inspection (CFEI) Secure Certificate of Final Electrical Inspection (CFEI)

Sign and Sealing of post-construction requirements i.e.,


FOR ITEM CODE CREATION Sign and Sealing Post-Construction Requirements
As-Built Plans, Forms, Certificate, Log Book)

PER012 Occupancy Permit (Completion) Secure occupancy certificate

Services incurred to secure post-construction permits i.e.,


FOR ITEM CODE CREATION Cost to Acquire Post-Construction Permit
manpower, legwork and other fees

Subtotal -

Vat (12%) -

Grand Total -

Page 1 of 1

You might also like