AC POWER DISTRIBUTION TEST RESULT

SITE CODE SITE NAME SITE ADDRESS SITE TYPE

GREENFIELD ROOFTOP

I. CABLE INSULATION TEST RESULT


INSTRUMENT: BRAND: MODEL No. SERIAL No. CALIBRATION DATE:

REQUIRED
CABLE SIZE L1-L2 L2-L3 L3-L1 L1-G L2-G L3-G
POINT TO POINT BRAND TYPE megaohms megaohms megaohms megaohms megaohms megaohms
VALUES REMARKS
(mm2) megaohms

50 megaohms

50 megaohms

50 megaohms

50 megaohms

50 megaohms

50 megaohms

50 megaohms

50 megaohms

II. VOLTAGE TEST RESULT


INSTRUMENT: BRAND: MODEL No. SERIAL No. CALIBRATION DATE:

L1-L2 L2-L3 L3-L1 L1-G L2-G L3-G


CKT No. LOAD DESCRIPTION REMARKS
(VOLTS) (VOLTS) (VOLTS) (VOLTS) (VOLTS) (VOLTS)

-
MCB/MTS ( LINE SIDE)

-
MCB/MTS (LOADSIDE)

-
ACPDB (LINESIDE)

CONTRACTOR REPRESENTATIVE FTAP REPRESENTATIVE

NAME: NAME:

DESIGNATION: DESIGNATION:

SIGNATURE: SIGNATURE:

DATE: DATE:

FTAP-AC Power Distribution Test Result Page 1 of 1