Question Results

Score 1 of 1
Question:

How do you achieve frequent checkpoints with the End User in an?
There are 2 correct answers to this question.

Response:

Solution Demo for Sprints

Solution Review for Waves

Demo the SAP Model Company

User Acceptance Test

Score 1 of 1
Question:

Which of the following statements about Scrum is correct?


Please choose the correct answer.

Response:

In Scrum, as best practices, we have three main roles, and three


artifacts or three ceremonies.

Scrum Master defines and prioritizes features and gathers


requirements.

The three ceremonies are sprint planning, daily scrum, sprint review
(retrospective).

In Scrum, the team is Self-organized, define all task necessary for all
project life cycle.

Score 1 of 1
Question:

How can the project manager help to keep momentum in the project and help
to keep the customer involved?
There are 2 correct answers to this question.
Response:

Increase the number of Q-Gates

Leverage agile cycles to build and test the solution

Add customer resources to the project to reduce the need for formal trainin

Walk through the solution processes with the stakeholders

Score 1 of 1
Question:

Which of the following is a Key Deliverable of the Prepare phase?


Please choose the correct answer.

Response:

Release and Sprint Plan

Baseline Build

Solution Scope and Value Determination

Change Impact Analysis and Communication Plan

Score 1 of 1
Question:

What is the key difference between Notes and Requirements in the Change and
Deploy capability of SAP Cloud ALM?
Please choose the correct answer.

Response:

Users can create a follow-up task that is actionable for Requirements.

Users can create a follow-up task that is actionable for Notes.

Requirements are created from tasks.

Notes are created from tasks.


Score 1 of 1
Question:

How many deliverables are a part of the Key Deliverable 'Project Initiation'?
Please choose the correct answer.

Response:

Three

Two

Four

One

Score 1 of 1
Question:

What are the responsibilities of the Product Owner in release and sprint
planning?
There are 2 correct answers to this question.

Response:

Prioritize backlog user stories by business priority.

Define objectives for each release.

Analyze the functional and technical dependencies between the user stories

Estimate the backlog user stories.

Score 1 of 1
Question:

Which of the following activities are part of the Deploy Phase of a Landscape
Transformation journey to SAP S/4HANA On-Premise Edition?
There are 2 correct answers to this question.

Response:
Access organizational and production readiness

Training delivery

Solution Activation

Optimize software Change Control Management

Score 1 of 1
Question:

What do you do during an iterative approach to build a solution?


Please choose the correct answer.

Response:

Include frequent inspection check-points

Provide a working solution only at the end of the release

Build the solution module by module

Deliver a prototype of the solution

Score 0 of 1
(skipped)
Question:

Which key activities does the Guided Configuration support you with?
There are 3 correct answers to this question.

Response:

Manage roles of configuration users

Train new users

Create test data

Test configured processes


View solution scope

Score 0 of 1
Question:

In which phase of the SAP Activate methodology does the team complete the
Transformation Planning?
Please choose the correct answer.

Response:

Explore

Deploy

Realize

Prepare

Score 1 of 1
Question:

What do you do during Sprint Execution?


Please choose the correct answer.

Response:

Present status of selected user stories in the sprint scope on a


scrumboard

End a sprint when the sprint backlog items are all complete

Hold a retrospective at the end of each week

Measure the sprint progress with a percentage complete report

Score 1 of 1
Question:

What are some of the values of SAP Cloud ALM for operations?
There are 3 correct answers to this question.

Response:
It provides reduced cost of operations.

It provides license management capabilities.

It provides end-to-end transparency.

It provides a solution readiness check.

It provides improved efficiency and automation.

Score 1 of 1
Question:

What is the order of artifacts within the Technical Architecture and


Infrastructure workstream in the Prepare phase?
Please choose the correct answer.

Response:

Hardware specification from Hardware Vendor -> Technical Strategy -


> Parameters Hardware Sizing calculation -> Hardware Sizing results

Technical strategy -> Hardware specification from Hardware Vendor ->


Parameters Hardware Sizing calculation -> Hardware Sizing results

Hardware specification from Hardware Vendor -> Parameters


Hardware Sizing calculation -> Hardware Sizing results -> Technical
Strategy

Technical Strategy -> Parameters Hardware Sizing calculation ->


Hardware Sizing results -> Hardware Specification from Hardware
Vendor

Score 1 of 1
Question:

How would you describe the Explore phase in the "New Implementation of SAP
S/4HANA Cloud" transition path?
Please choose the correct answer.

Response:

Solution Validation and Delta Design


Simplification and Custom Code Impact Analysis

Fit-to-standard

Setup and Enablement

Score 1 of 1
Question:

Which accelerator can help you document the detailed design of solution
extensions?
Please choose the correct answer.

Response:

Product Backlog Template

RICEF Specification Template

Sprint Backlog Template

Change Request Template

Score 1 of 1
Question:

In Which phase does the Transition to Operations work stream start?


Please choose the correct answer.

Response:

Explore

Prepare

Realize

Deploy

Score 1 of 1
Question:
What is the best target environment for a System Conversion journey is as
described in the SAP Activate methodology?
Please choose the correct answer.

Response:

SAP Hybris

SAP S/4HANA Cloud Edition

SAP S/4HANA On-Premise Edition

Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise


Edition

Score 1 of 1
Question:

Which of the following are benefits of using Ready-to-use Content?


There are 2 correct answers to this question.

Response:

Run SAP Like a Factory

Minimized Total Cost of Ownership

Predictable results

Fast Time-to-Value

Score 0 of 1
Question:

What capabilities does SAP API Business Hub pro ide to help you select
integration options for your project?
There are 3 correct answers to this question.

Response:

Integration with Ide and code generation

Advice on selecting scope items in SAP Best Practices Explorer


Pre-packaged integrations

Sandbox for testing APls

Recommendations on using integration bus (SAP Process


Orchestration or SAP Integration Suite)

Score 0 of 1
Question:

What is the term used for workshops, which are intended to set value targets,
validate SAP Standard functionality against customer requirements.

And collect delta requirements in the "New Implementation of SAP S/4HANA"


transition path?
Please choose the correct answer.

Response:

Fit-to-Standard

Delta Design

Design Thinking

Solution Validation

Score 1 of 1
Question:

Arrange the following in the correct sequence of steps followed for a 'Fit to
Standard' workshop.
Please choose the correct answer.

Response:

Discuss how the process fit with customer requirements, Review


Best Practice Process Flow, Demonstrate Business Scenarios and
Concepts, Identify required configuration, Enable customer on
execution of scenarios, Identify gaps

Demonstrate Business Scenarios and Concepts, Review Best


Practice Process Flow, Identify required configuration, Discuss how
the process fit with customer requirements, Enable customer on
execution of scenarios, Identify gaps

Review Best Practice Process Flow, Demonstrate Business


Scenarios and Concepts, Identify required configuration, Discuss
how the process fit with customer requirements, Enable customer
on execution of scenarios, Identify gaps

Review Best Practice Process Flow, Demonstrate Business


Scenarios and Concepts, Discuss how the process fit with customer
requirements, Identify gaps, Identify required configuration,
Enable customer on execution of scenarios

Score 1 of 1
Question:

Which of the following activities are performed in the Explore phase of SAP
Activate in SAP S/4HANA Implementation?
There are 3 correct answers to this question.

Response:

Implementing best practices

Changing master data

Organizational structure

Creating transactional data

Adjusting custom code objects

Score 1 of 1
Question:

What is SCRUM of SCRUMS?


Please choose the correct answer.

Response:

Integration meeting between the various project teams

Frequent inspection of code and configuration prior to quality gates


Mechanism for gathering and validating requirements

Alternative to regular SCRUM process for smaller teams

Score 1 of 1
Question:

Which of the following tasks are part of the Production support after the Go
Live key deliverable?
There are 2 correct answers to this question.

Response:

Resolve issues identified during the Hyper Care period

Set up the Operations Control Center

Perform a Technical systems test

Provide further training to customer end users

Score 1 of 1
Question:

How can SRCUM teams be organized?


Please choose the correct answer.

Response:

By work stream

By project phase

By project governance level

By job title

Score 1 of 1
Question:

What is a Strategy Level 0 (LO) artifact?


Please choose the correct answer.

Response:
Optional information that is NOT important for project activities

Preliminary strategy developed by the customer to approach the


project in a specific work stream

Approach document that is developed by a united Project Team


(partner + customer)

Project result that is developed solely by the partner

Score 1 of 1
Question:

What does a cutover involve?


Please choose the correct answer.

Response:

Switching productive business operations from one system to another

Transport ng new product increment in the development system

Presenting completed User Story to key users

Closing quality gate

Score 1 of 1
Question:

What is the focus of a SCRUM of SCRUMS in an Agile context?


Please choose the correct answer.

Response:

Integration topics

Backlog management

Communication to the Project Management Office

Best Practice adoption


Score 1 of 1
Question:

Which key deliverable includes the development of RICEFW objects?


Please choose the correct answer.

Response:

Enhancement Delivery

Custom Extensions Management

Sprint Execution

Development Build

Score 1 of 1
Question:

In which phase of the SAP Activate methodology does the team complete the
Cut-over Rehearsal?
Please choose the correct answer.

Response:

Prepare

Realize

Deploy

Explore

Score 1 of 1
Question:

What is the objective of a sprint retrospective meeting?


Please choose the correct answer.

Response:

Provide formal feedback to the project manager

Review and prioritize the backlog


Improve the SCRUM process

Define the stakeholder management approach

Score 1 of 1
Question:

What solution operations framework can customers use to create a joint


business and IT organization?
Please choose the correct answer.

Response:

SAP Roadmap Explorer

SAP Activate

Customer Center of Expertise

Business Transformation Management Methodology

Score 1 of 1
Question:

SAP now offers the ability to deploy and manage solutions in which of the
following environments?
Please choose the correct answer.

Response:

Cloud and On-premise

Cloud, On-premise and Hybrid

Cloud

On-premise

Score 1 of 1
Question:

What tool would you use for managing project tasks and Solution
Documentation when implementing SAP S/4HANA Cloud?
Please choose the correct answer.
Response:

SAP Roadmap Viewer

SAP Transformation Navigator

Implementation portal for SAP S/4HANA Cloud

SAP Support Marketplace

Score 1 of 1
Question:

In which phase do you create an ordered list of everything that is known to be


needed in the product"?
Please choose the correct answer.

Response:

Prepare

Explore

Deploy

Realize

Score 1 of 1
Question:

Which activities are critical for delivering Agile projects?


There are 2 correct answers to this question.

Response:

Retrospective agenda creation

Blueprint scheduling

Sprint planning

Release planning
Score 1 of 1
Question:

In SAP Activate, what replaces the detailed Blueprint from ASAP?


Please choose the correct answer.

Response:

Fit/Gap Workshops

Business Process Mapping

Custom Extension management

Value Determination

Score 0 of 1
Question:

What are the benefits of the SAP best practices?


There are 3 correct answers to this question.

Response:

Reduced functional scope

Predictable results

Fixed organizational structure

Simple on-boarding to cloud

Fast time to value

Score 1 of 1
Question:

In which SAP Activate methodology phase does the team identify and design
functional quick wins in scope of the conversion project?
Please choose the correct answer.

Response:
Prepare

Explore

Deploy

Realize

Score 1 of 1
Question:

Which of the following activities support the Realize Phase of a System


Conversion journey to SAP S/4HANA On-Premise Edition?
There are 2 correct answers to this question.

Response:

Non-production systems migration

Data aging configuration

Value determination

Custom code Adjustment planning

Score 1 of 1
Question:

What is a key characteristic of SAP Activate for new implementations of


S/4HANA cloud edition?
Please choose the correct answer.

Response:

Limited involvement of business stakeholders

Waterfall approach

Design-based

Start with executable content


Score 1 of 1
Question:

What does the Content element of SAP Activate provide?


There are 3 correct answers to this question.

Response:

Integration Content

Business Processes Content

Functional Specifications for WRICEF development

End-User guides

Migration Content

Score 1 of 1
Question:

What term is used for a Ready-to-run SAP S/4HANA system with pre-built
Solution Documentation, which supports End-to-End Processes for a specific
industry so that the Project Team can focus on differentiation and innovation?
Please choose the correct answer.

Response:

Best Practice System

SAP Cloud Appliance Library

SAP Model Company

Fully Activated Appliance

Score 0 of 1
Question:

In which phase should you first run the SAP Readiness Check for SAP S/4HANA
in a "Selective Data Transition" transition path, in a System Consolidation
scenario that includes conversion from SAP ERP?
Please choose the correct answer.

Response:
Realize

Prepare

Explore

Discover

Score 1 of 1
Question:

How do you set up Scrum teams?


There are 2 correct answers to this question.

Response:

Based on group size, but a minimum of 12 people

As a cross-functional team covering multiple functions, like


configuration, data loads, and testing

Based on End-to-End Processes like Order-to-Cash

By type of work, like configuration Scrum, documentation Scrum,


and testing Scrum.

Score 1 of 1
Question:

When does the Scrum Team receive formal confirmation that the User Stories
are completed to the satisfaction of the Product Owner?
Please choose the correct answer.

Response:

During the Sprint Retrospective

During the Sprint Review

During the daily Scrum meeting

During the User Acceptance Test


Score 1 of 1
Question:

Who determines the priority of user stories in the backlog of an Agile project?
Please choose the correct answer.

Response:

Product Owner

SCRUM Master

Project Manager

Project Team

Score 1 of 1
Question:

What can users do in the Roadmap Viewer tool?


Please choose the correct answer.

Response:

Create a customer-specific version of SAP Activate Methodology

Upload SAP Activate WBS into SAP Solution Manager7.1

Download full SAP Activate methodology content for use off-line

Display and navigate detailed SAP Activate methodology WBS

Score 1 of 1
Question:

Which of the following are available in the initial SAP Methodologies JAM Page?
There are 2 correct answers to this question.

Response:

Task description
Roadmaps

Summary

Accelerators

Score 1 of 1
Question:

Why is there NO Sandbox system in the "New Implementation of SAP S/4HANA


Cloud, Single Tenant Edition" transition path?
Please choose the correct answer.

Response:

Because the project team uses the DEV system to confirm solution fit and d
requirements

Because the Fit-to-Standard workshop is conducted using the Q-system

Because the customer may use the SAP Model Company

Because SAP S/4HANA Cloud, Single Tenant Edition, contains predefined bu


processes which should NOT be changed

Score 1 of 1
Question:

When does the project team receive formal confirmation that the user stories
are completed to the satisfaction of the product owner?
Please choose the correct answer.

Response:

During user acceptance testing

During the sprint review

During the daily SCRUM meeting

During the sprint retrospective

Score 1 of 1
Question:

In which phase do you verify that the SAP Best Practice solution scenarios meet
the business needs of the customer?
Please choose the correct answer.

Response:

Explore

Deploy

Prepare

Realize

Score 1 of 1
Question:

Which pre-loaded content is available in SAP Cloud ALM for implementation?


There are 2 correct answers to this question.

Response:

Activate methodology tasks

Business process best practice content

Software configurations

Roles and authorizations

Score 1 of 1
Question:

Which of the following is part of the Explore phase in the "New Implementation
of SAP S/4HANA Cloud' transition path?
Please choose the correct answer.

Response:

Solution Validation and Delta Design

Fit-to-standard
Setup and Enablement

Simplification and Custom Code Impact Analysis

Score 1 of 1
Question:

How do you gain access to the SAP Activate Methodology Jam site?
Please choose the correct answer.

Response:

Submit e-mail address via on-line form

Join SAP S/4HANA group on SAP Community Network

Send e-mail to SAP contact address

Register on SAP Service Marketplace

Score 1 of 1
Question:

In which phase should you create a Data Migration Strategy (LO) during a
Selective Data Transition?
Please choose the correct answer.

Response:

Realize

Discover

Explore

Deploy

Score 1 of 1
Question:

Which of the following is a key characteristic of the Agile project approach?


Please choose the correct answer.

Response:
Iterative build with frequent inspections

Frequent and detailed project scheduling

Frequent quality gates

Formal and detailed documentation

Score 1 of 1
Question:

What tool provides guidance on replacing custom code developed for SAP ERP
with SAP S/4HANA functionality for the "System Conversion" transition path?
Please choose the correct answer.

Response:

Software Provisioning Manager

Simplification Item Check (SI-Check)

Software Update Manager with Database Migration Option

SAP Code Inspector

Score 1 of 1
Question:

Which of the following are part of the 10 SAP Quality Principles?


There are 2 correct answers to this question.

Response:

Achieve production readiness.

Start scoping early.

Use standard functionality optionally.

Plan one phase at a time.

Score 1 of 1
Question:

What activities do you perform during the fit-to-standard workshops milestone


in the SAP Activate methodology within SAP Cloud ALM?
There are 3 correct answers to this question.

Response:

Create notes and/or requirements in SAP Cloud ALM.

View details of high-level process flows in SAP Cloud ALM.

Create wireframes for user interfaces in SAP Cloud ALM.

View details of business process diagrams and descriptions in SAP


Cloud ALM.

Create SAP Fiori screen mock-ups in SAP Cloud ALM.

Score 1 of 1
Question:

Which of the following tasks are required in the Prepare Phase?


There are 3 correct answers to this question.

Response:

Train the project team

Set up the infrastructure to support the project

Approve the test strategy

Define the communication plan

Identify relevant SAP Best Practices

Score 1 of 1
Question:

When do you perform User Acceptance Testing during the Agile Build?
Please choose the correct answer.

Response:
After each Sprint

Before Integration Testing

During each Firm-up Sprint

After Integration Testing

Score 1 of 1
Question:

Your project is performing some high-level planning for a System Conversion


journey from SAP Business Suite to SAP S/4HANA on-premise edition.

What is the correct sequence of selected key deliverables across the project
phases?
Please choose the correct answer.

Response:

a. Detailed system Assessment


b. Code Adjustment
c. Validation of Migration
d. Production Readiness Check

a. Code adjustment
b. Detailed System Assessment
c. Production Readiness Check
d. Validation of Migration

a. Production Readiness Check


b. Detailed system Assessment
c. Code Adjustment
d. Validation of Migration

a. Detailed system Assessment


b. Production Readiness Check
c. Code Adjustment
d. Validation of Migration

Score 1 of 1
Question:

Which of the following tools are used for rapid database migration?
There are 2 correct answers to this question.
Response:

Database Migration Option (DMO)

Software Update Manager (SUM)

SWPM (software provisioning manager)

SAP Solution Manager

Score 1 of 1
Question:

Which tool can you use to collaborate with other SAP Activate methodology
practitioners?
Please choose the correct answer.

Response:

SAP Implementation Assistant

SAP Jam

SAP Solution Manager

Roadmap Viewer

Score 1 of 1
Question:

Which accelerators support the Fit-to-standard workshop in the Explore phase?


There are 2 correct answers to this question.

Response:

Quality Gate Checklist

Business-Driven Configuration Questionnaire

Test Strategy

Backlog template
Score 1 of 1
Question:

Which of the following is not a characteristic that the quality principles are
based on?
Please choose the correct answer.

Response:

International standard

SAP Quality Award example winners

Best Practices

Experience of Typical Pitfalls

Score 1 of 1
Question:

What are some of the key characteristics of the implementation approach in


SAP Activate Methodology?
There are 3 correct answers to this question.

Response:

Fixed scope

Based on Ready-to-use Content

Cloud Ready

On premise only

Delta-based

Score 1 of 1
Question:

What is the purpose of a firm-up sprint?


Please choose the correct answer.
Response:

To perform String test

To demonstrate functionality from previous sprint

To run end-to-end integration test

To revise a release plan and sprint plan

Score 1 of 1
Question:

Which of the following Key Deliverables do you complete in the Solution Design
work stream in the Explore phase?
There are 3 correct answers to this question.

Response:

Validation Workshops

Baseline Build

Solution Scope and Value Determination

Data Migration Approach

Design for the Gaps and Deltas

Score 1 of 1
Question:

Which of the following activities are part of the Realize Phase of a System
Conversion journey to SAP S/4HANA On-Premise Edition?
There are 3 correct answers to this question.

Response:

Custom code adjustment

Sandbox system migration


Development system migration

Delta configuration

Operations impact analysis

Score 1 of 1
Question:

Which component of SAP Activate offers customers a reference solution in the


cloud for a quick start?
Please choose the correct answer.

Response:

SAP Best Practices

SAP Activate Methodology

Guided Configuration

SAP Implementation Assistant

Score 1 of 1
Question:

What is the hierarchy level under Phase in the SAP Jam space for SAP Activate
on-premise?
Please choose the correct answer.

Response:

Scenario

Key Deliverable

Work Stream

Task

Score 0 of 1
(skipped)
Question:
What are the core capabilities in SAP Cloud ALM for operations?
There are 3 correct answers to this question.

Response:

Upgrade analysis

Operation automation

Monitoring

Event and alert management

License management

Score 0 of 1
(skipped)
Question:

Which estimation technique can be used in an Agile delivery approach to size


the User Stories during sprint planning?
Please choose the correct answer.

Response:

Detailed bottom-up effort estimate the breaks each user story up


into hours or shorter tasks

Relative estimate in ideal person days that reflects the best estimate
provided by the project team

Detailed bottom-up effort estimates by the Scrum Master in story


points based on the User Story complexity

Product Owner’s relative estimate of the effort that will be needed to


implement the user story

Score 1 of 1
Question:

In which phase do you run the user acceptance test?


Please choose the correct answer.

Response:
Deploy

Final Preparation

Build and Test

Realize

Score 0 of 1
Question:

Which of the following are examples of Ready-to-run SAP S/4HANA systems?


There are 2 correct answers to this question.

Response:

Fully Activated Appliance

SAP Model Company

SAP Mission ControlCenter

SAP Best Practices Explorer

Score 0 of 1
(skipped)
Question:

What does SAP Activate recommend to keep team members informed and
aligned?
Please choose the correct answer.

Response:

Daily status meeting with project manager

Daily team stand-up meeting

Daily e-mail status updates to project manager

Daily progress review meeting with sponsor