ESTIMATION COST OPERATION VESSEL TC BUANA ENERGY & PERMATA SUCCESS 5001

SPOB BUANA ENERGI OB PERMATA ENERGI


Astiku to IWIP Astiku to IWIP
Item Cost Item Cost
Nautical Mile (return) 1969.18 Nautical Mile (return) 1969.18
Quantity 4,000,000 Quantity 4,000,000
Speed Average 6.5 Speed Average 3.5
Days (return) 13 Days (return) 23
Loading & Discharging Time 4 Loading & Discharging Time 4
Bunker Consumption 51,502 IDR 746,773,646 Bunker 95,646
Agency IDR 70,000,000 Agency IDR 1,559,000,000
Fresh Water 50,000 IDR 10,000,000 Fresh Water
Total IDR 826,773,646 Total IDR 1,559,000,000
Cost Idr/Liter IDR 207 Cost Idr/Liter IDR 390
Note Note
Price exclude Fix Cost Charter Price for operation pertrip only Price exclude Fix Cost Charter Price for operation pertrip only

SPOB BUANA ENERGI OB PERMATA ENERGI


Astiku to Lamongan Astiku to Lamongan
Item Cost Item Cost
Nautical Mile (return) 1041.12 Nautical Mile (return) 1041.12
Quantity 4,000,000 Quantity 4,000,000
Speed Average 6.5 Speed Average 3.5
Days (return) 7 Days (return) 12
Loading & Discharging Time 4 Loading & Discharging Time 4
Bunker Consumption 27,229 IDR 394,824,738 Bunker 50,569 IDR 986,089,371
Agency IDR 70,000,000 Agency IDR 70,000,000
Fresh Water 30,000 IDR 7,000,000 Fresh Water 30,000 IDR 7,000,000
Total IDR 471,824,738 Total IDR 986,089,371
Cost Idr/Liter IDR 118 Cost Idr/Liter IDR 247
Note Note
Price exclude Fix Cost Charter Price for operation pertrip only Price exclude Fix Cost Charter Price for operation pertrip only