PT. PEMBANGKITAN JAWA BALI SERVICES Form number : FM-KP-4.1.4.05


SIAP INTEGRATED MANAGEMENT SYSTEM Revised status :1
Date of issue : 01-02-2018
THERMOGRAPHY REPORT
Page : 1/2

Power plant : PLTU Tembilahan


Record Number : 1645722000 STATUS
Equipment : Close Cooling Water Pump C
Asset Register : 170605TM00PGB13AP003
CRITICAL
VESO : Essential
Test date : 25-02-2022

DATA EQUIPMENT STANDARD EPRI


Manufacturer :
Capacity :
Power :
Rotation :
Voltage :
Current :

OVERALL THERMOGRAPHY OPERATING CONDITIONS


Point Value (°C) Parameter Unit Value
Fasa R Outgoing 42.6
Fasa S Outgoing 93.4
Fasa T Outgoing 45.5
PHOTO 1 PHOTO 2

Caption 1 Caption 2

TRENDING
100
Bearing M1
Bearing M2
90
Bearing P1
Bearing P2
80 Winding
Fasa R Outgoing
70 Fasa S Outgoing
Fasa T Outgoing
Value

60

50

40

30

20

ANALYSIS RECOMMENDATION
PT. PEMBANGKITAN JAWA BALI SERVICES Form number : FM-KP-4.1.4.05
SIAP INTEGRATED MANAGEMENT SYSTEM Revised status :1
Date of issue : 01-02-2018
THERMOGRAPHY REPORT
Page : 1/2

Lakukan pengecekan kondisi skun di terminal. Jika longgar, lakukan pengencangan baut.
Over temperature di fase S panel CCWP Lakukan penggantian jika ukuran skun tidak cocok/ longgar di baut.
C Lakukan pengecekan kondisi kabel di sepatu skun. Jika skun kurang tekan atau kabel
Indikasi ada abnormal di skun kabel. kurang masuk dengan sempurna saat crimping, lakukan penormalan.
Lakukan perbaikan isolasi skun.

CBA
Kerugian unit derating akibat CCWP C rusak.

Asumsi derating 4MW selama 12 jam dan harga jual listrik Rp 1.655:

= Rp 79.440.000

Biaya pelaksanaan FDT.

Estimasi biaya penggantian contactor dan biaya pemeliharaan lainnya:

Rp 60.000.000

Saving:

Rp 19.440.000

Inspected by Known by

Sandro Sitohang Hilman Aziz Tamimi