You are on page 1of 2

1/22/24, 2:57 PM about:blank

CHHATTISGARH SWAMI VIVEKANAND


TECHNICAL UNIVERSITY
Bhilai, Durg, Chhattisgarh
ADMIT CARD
STUDENT DETAILS
Registration No. CB5569 Roll No. 300803922304
College Name 008 - GOVERNMENT ENGINEERING COLLEGE - JAGDALPUR
Student's Name niteen kumar singh
Gender Male Date of Birth 25-05-2000
Father's Name devendra kumar singh Current Semester 5 Semester
Program B Tech Mining Engineering Course B.Tech
ABC User ID

EXAMINATION CENTER DETAILS

008 - GOVERNMENT ENGINEERING COLLEGE - JAGDALPUR

SUBJECT DETAILS

Subject Exam Exam Date & Time of


Sl Semester Subject Code Subject Name
Type Session Type Exam

5 Nov-Dec
1 Sessional C000506(020) Environmental Studies Regular
SEMESTER 2023

5 Nov-Dec
2 Theory C039511(022) Numerical Analysis & Computer Programming Regular
SEMESTER 2023

5 Nov-Dec
3 Theory C039512(039) Mine Survey - II Regular
SEMESTER 2023

5 Nov-Dec
4 Theory C039513(039) Mine Legislation - I Regular
SEMESTER 2023

5 Nov-Dec
5 Theory C039514(022) Programming With C Regular
SEMESTER 2023

5 Numerical Analysis & Computer Programming Nov-Dec


6 Practical C039521(022) Regular
SEMESTER Laboratory 2023

5 Nov-Dec
7 Practical C039522(039) Mine Survey - II Laboratory Regular
SEMESTER 2023

5 Nov-Dec
8 Practical C039523(022) Programming With C Lab Regular
SEMESTER 2023

5 Project - I, Based on Summer Internship/Industrial Nov-Dec


9 Practical C039524(039) Regular
SEMESTER Training 2023

5 Nov-Dec
10 Theory C039531(039) Under ground Metal Mining Regular
SEMESTER 2023

Signature should match with uploaded signature of candidate

Signature of the Candidate (while receiving) Signature of the Principal Signature of COE

INSTRUCTION FOR WRITTEN EXAMINATION


.General requirements of mine plans: *every plan and section prepared accordance to the following provision are as follows:a) show the name of mine and owner and the purpose for which plan prepared.b) show
1.
the true north and magnetic marridain.c) show the scale of the plan atleast 25cm long and suitably sub devided.d)The chief inspector may be order other suitable scale when need ed.e) properly inked and kept good
condition of tracking paper.2) the all symbols used in mine plans which are described in shedule second.3) the plan and section required by the registration shall be accurate maintained up to date not earlier than
three months.4) the maintend plan or section of mine shall be kept in mine office for inspection with the approval in writing by chief inspector keep their copy in office.
Types of mine plans: the owner, agent or manager of every mine shall keep the following plans:-1) surface plans: in surface plan showing Every, surface features within the telephone, telegraph, watermain,rail road,
2. type of opening either incline or shaft, river, tank bore hole and building on the surface.2) underground plan showing:a) the position or working of mine below the ground.b) every bore hole,shaft, incline opening
stopping,goaf area,fire stopping, water damp, pumping station etc.c) every surface feature with the 200 meter ,like temple, intake ,return water dam, charging ro ad,road,river, railways,etc.d) the general direction and
rate of dip.e) show the section of plan with variable thickness.f) the position of dyk wash out sills and fault with amount and direction of its throw.g) when the plan brouth into up to date the worked area shown by
dotted line with the date of survey.3) aware the coal sim has average inclination more than 30 degree the vertical projection of working show..!
ventilation plan: in ventilation plan show the following points.a) the general direction of air current.b) every points where the air current measured.c) every air crossing ,ventilation ,and regulator etc.d) every five
3. stopping and it's serial number.e) every room used for storing infalambele material.f) every water dam with dimension.g) geological plan of area of leasehold.2).. separate plan and section kept for working of every
sim of maintained in clause ab and e the sub regulation.a) surface contour lines also show in clause a and b of reg(1).b) spot levels also showing in pla n maintend in cause.c) benchmark established on the
surface.4.a) settled ground also show in clause a and b of sub regulation.b) the owner agent or manager of mine self provide all facility to the surveyor.5.a) the regional inspector may be an order in writing permit to
show edition detail as required.b) inspector give the time for submission of plan.c) the reasonal inspector honor ag ent or manager of the mind can draw at any time advanced work area.
@Planimeter-reply metre is a instrument which is used to measure the area of the plan of any shape planimeter is generally used to wear the plan are of ir regular shape it give very higher degree of accuracy #types
of planimeter:-there are two types of plane metre (1) polar planimeter (2)Roller planimeter. The polar planning metre is generally used to nowadays #constructions-polar planimeter consist bye following parts 1.Pole
4.
black -Paul black is a heavy blog it is fixed in position by retaining pin called anchor pin on the plan whose area is required 2.Anchor arm - the anchor arm is a bar which one end is pivoted to the Paul block and other
end is fixed to integrating unit. 3.Tracing point - the tracing point is a needle point which is moved over the outline the plan.
5. .4. Tracing arm- tracing arm is bar whose one end is attached to the integrating unit and other end is attached to the tracing point.5. lntegrating unit - integrating unit consists of an integrating disc mod by hard steel
and roller .The rural is direct connected to the disc speidle. The ruler has a 100 equal division and its periphery. The roller is so designed as when it competes one revol ution then disc advance one division. Disc
spindle having and 10 division. Therefore the disc complete one revolution after every 10 revolution of roller. #DIAGRAM
#working of planimeter - the planimetre is support at tree point. 1. Anchor point 2.Tracing point 3.Roller. the planimetre is placed over the plan force are is required the position of the anchor point fixed on the
6. suitable location of plan 1. The tracking point set at the selected starting point this point should be marked on the plan 2. Initial reading of integrating point teken 3. The tracing point is then slowly move in
clockwise direction over the outline of plan 4. Due to ration of tracing point roller partially moved and partiol slide.5. the normal component of the motion causes rotation of roller and axial component ab ortion
causes slip 6. Tha the final reading of the integrating unit noted when tracing point come into initial point required area is calculated by following form ula A=M(F.R - I.R+- 10N +C)
F.R = final reading of integrating unit . I.R =initial reading of integrating unit .N = total number of revelation of the disc . C = instrument constant is given in tr acing arm. #ADS.(i) it give more accuracy reading. (ii) it is
7.
used in irregular shape of plan. (iii). Calculation of areas easy.#D IS.(i) requirement of skill person. (ii) the surface of the paper should be smooth.(iii) requirement of area determination se veral time.
@Preparation of plan and section by the surveyors: -1. Every plan and section and tracing there of prepaved under the supervision of surveyors 2. Every plan or section or any part there of prepaved by the
8.
surveyors aur under the provision of surveyors shall carry their own certificate by him to the effected that the plan and sec tion there of is correct and shall by signed and dated by the surveyors also countersigned
and dated by the manager on every occasion when the plan and section brought into up to date 3. Every tracking of plan and section or any part there of shall be there reference to the original plan and section from
which it was copied and shall be certified bye surveyors the certificate shall be Signed and dated by surveyors
4. If the surveyors fail to show plan of working on paper he shall guity of a brench regulation.however ,exemp the owner, agent or manager of their responsibility to ensure that every plan or section, submitted under
the regulation and maintared up to date as required their under.#Pontagraph- photograph is instrument which is used in office to entarge and reduse the plan alre ady draw. #
9.
Principle of pontograph:- the principle of instrument is based and on the similar triangle when the parallelgran cut by the RAB, point A move at A' and point B at B' || Diagram || procedure reducing the plan by
10. pontograph 1. Set the sliding frame representing the required reducing clan the sliding frame. 2. Set the dressing point B on the origin al plan and pencil A on drawing paper on which reduce plan to be drawn .3.move
the tracing point B angle the every line of original plan. raise of pencil A when the tracing point pastes over the space between the line of original plan.4. the figure trusted by the pencil A is the reduce plan.
Tangent Length (T): Tangent Length =R tan (A/2) C. Length of Long Cord (L):Length of Long Chord= 2 R sin (A/2) D. Mid-ordinate (M:=The Mid Ordinate =R [1-cos (4/2)] E. Apex Distance/External Distance:The
11.
external distance = R [Sec (A/2) - 1]
●Elements of a Compound Curve:TitT2is the compound curve consisting of two ares of radiiRy and R2 and tit2 is the common tangent making deflection angle 41 and 42 at tr and t2.,So,A=A1+42,Deflection angle
12.
2It1 t2=41,Deflection angle 2 I t2 t1 = 42,Radius of arc Tit =R1,Radius of arc T2t= R2,Tangent lengths=TiI and T2I, From A I t1 t2,
t1/sinA2=it2/sinA1=t1t2/sin[180-(A1+A2)],
13.
From, above equation we can calculate the term I t1, I t2 , IT1 and IT2,t1 t2=RI tan (A1/2)+ R2 tan (42/2)
about:blank 1/1

You might also like