7 Pemacangan Scaffolding D1 Area POC 35.V-101
a
ey aanccaee Semen Ti
aaa ia a =
paRouSeT a "
ee = :
eas an
an i=
eee =
a ae :
eee a 5
za 7
a, =
ee :
[Tings m 3
ce 2 :
: ;
fei
am
Xo
aes ma iam
lk w =)
~ Ujang Oting_ ‘SuwarjoNNR
[Pekeriaan Pemasangan Scaffolding Di Area POC 39-V-108
te panes Jumlah Kebutuhan Mate 2
No. sub Order Material ‘Site aby
Pipa R0.48,3%3.2 im 2
Pipa R.0 48,3 «3,2 2m 36
Pip R048 3 «3.2, 3m 5
Pipa R.048,3 3.2, 4m
Pina R.0 48,3x3.2 Sm
ipa RO 48,3x3,2 ém 3
Roda
FixClamp o
Swivel Camp 8
[Asa am
Asiba 3m.
Asiba 2m 70
sib am 2
[Tangea 4m
stip Couper
[Base Plate a
Putlog
[rings 7 6
Lebar m 2
[Panjang m 2
Frotal volume m3. 26
Note:
2m
Workshop MAS Kontraktor
Le = Ujang Oting SuwarioPemasangan Scaffolding Di Area POC SAMPING 05 18
ekerjaan
= aoe as
INo.sub Order: Material Sie ay
~ [Pipa R.0 48,3x3,2 am
Pipa 8.048332 2m a
Pipa R.040,313.2 3m
Pips 8.048.332 am
Pipe 048,332 Sm
Pipa R0 48,3432 én
Roda
Fixclamp %
swivel iam: 4
asia am
fsioa am
[asiba 2m cry
Asiba Im
ranges am
sip Coupler
Base Plate
Putiog
[Tings = =
Lebar ™ 2
Panjang — m 2
[oval volume m3 2
race ——
ete
Workshop
1A vanectngrr ———————————————————_—_—_—_______________
[Pokedaan > Pematangan Seaffling Di Area POC 354101
du + Untuk FasitasPerbaltan Islas ‘erie abuts bstral 4
Io. sub Order Materia Sie ay
Pipa R0.48.3x32 im 4
Poa R048 3x32 2m 2
ipa RO 4833.2 3m 2
Fa RO48343.2 am
Pipa R048 33.2 Sm
Pina R48 33.2 em
Rod
rncamp az
swivel Gam z
Asbo mm
sia am
fase 2m i
[sibs am
[rang an
sip Coupler
base Pate
Putog
Tings 7 z
br m 2
Pani m 2
Total volume m3 =
rng
Nate
Workshop MAS Wontvakor
yo)
Suwario
dpa ysreotinePekerjaan Pemasangan Scaffolding Di Area NPU 32-101, Sanaa :
ludut ‘Untuk Fsiitas Perbaikan Lampu
No. Sub Order ‘Material Sie ty
Pipa RO 48.3 x32 im a
Pipa R.0-48,3 x3,2 2m a
[Pipa R.0.48,3x3,2 3m 4
Pipa R.0 48,3 x3,2 am 2
Pipa R.0 48,3 x3,2 5m
Pipa R.0 48,3 3,2 ém
Roda
[Fi camp ee
[Swivel Clamp 3s
[Asia am
lasiba 3m
[asiba 2m 10
[asiba am 1
[ranges 4m
Slip Coupler
[Base Plate 5
Putlog.
[Tinggi m a
Lebar m 2
Panjang m 2
[Total Volume m3) 36
Note:
‘Workshop WAS Kontraktor
4. Uongotvs<4 Vang oti
Pekerjaan Pemasangan Scaffolding DI Area NPU 31-103 /FINFAN Aen t
udu + Untuk Fasiltas Perbalkan Bocoran Pipa
Ino. Sub Order ‘Material Size ty
Pipa R.0 48,332 im ra
Pipa R.0 48,3 «3,2 2m 2B
Pipa 8.0 48,3 x32 3m 3
ipa RO 48,3x3.2 4m
Pipa R.0 48,3.x3,2 Sm
Pipa R.0 48,3 x3,2 Em
Roca
[Fx clamp. Eg
[Swivel amp 3
[asta am
[asiba 3m
[sia 2m Fy
[asiba 4m i
[Tangga 4m
slip Coupler
Base Pate a
Putlog
ings m 3
Tongge Lebar m 2
Panjang m 2
{Total Volume m3. a2
Note:
‘Workshop MAS Kontraktor
e ~
Suwario[Pekeriaan
7 Pemasangan Scaffolding Di Area NPU PIPERACK 32
Jumlah Kebutuhan Material
udu + Untuk Fasitas Perbalkan Bocoran Line Caustle
INo. Sub Order ‘Material Size ‘Qty
[Pipa 0 48.3%3.2 Im 4
[Pipa f.0.48,3%3,2, 2m. 2
[Pipa R.0.48,3%3,2 3m 4
[Pipa 0 48,3x3,2 am
Pipa R.0.48,3%3,2 Sm
Pipa 8.0 48.3%3,2 6m
[Roda
[Fx Clamp 50,
[Swivel Camp 4
sba am
fAsiba 3m
[Asba 2m 30
[Asiba am 2
Tanga ‘am,
Slip Coupler
[Base Plate
Putlog
Tings 7 2
Lebar im 2
Panjana m 2
[Total Volume i 8
Tangoe
Note
‘Workshop. MAS Kontraktor
“f-_Uiang OtingPPekerjaan Pemasangan Scaffolding OI Area NPU FIN FAN ST sSuelnsi anil
pudut + Untuk Fsiitas Lepas Kabel come meee!
INo. Sub Order _: Material Sie ay
Pipa RO48,3 x32 im 6
Pipa R.0-48,3 x3,2 2m 60
Pipa R.0-48,3 3,2 3m
Pipa 8.0 48,3 x3,2 ‘4m 16
Pipa 8.0 48,3x3.2 Sm
Pipa R.0-48,3 13,2 em
Roda
Fix clamp an
[Swivel Clamp
[asiba am ra
[asiba 3m
[Asiba 2m
[asia am.
rong 4m
sti Coupler v6
[pase Pate
T Putiog 50
[Tings m 2
t Lebar m 1
Manerai - Panjang. m 30
[Total Volume m3 380
Z Note:
7
com —7
Workshop MAS Kontraktor
Suwarjo
— Ujang OtingPekeraan Pemasangan Scafoling DI Area NPUS2-V-106 A TITIKZ
Jumlah Kebutuhan Material 4
Judut Untuk FasitasPasang Sorokan al
No. Sub Order Material Se ay
ipa RO 483x327 Tm rT
Pips n.0483%3.2 2m 2
Pipa 0483 x32 3m 2
Pipe n.0483%32 ‘am 4
Pipa .0483x3.2 Sm
Pipa .0 48,332 6m
Roda
Fixcamp =
Swivel Clamp 3
[asa am
[asa 3m
Asiba 2m 7
fasiva am H
Handrail / A] Frangge am
[Sip coupler
Base Pate 5
oe ie [Puteg
f ! FFngs! m 3
Listes =a sree Lebar m z
Lantai Vy I Panjang m 2
i ae etal volume: m3 é
| CI Note:
am— 4 J
2 | K
f / 1m
*
am —/
Workshop MAZ Kontakior
A_Viang oting
SumarioFekerjaan 7 Peratangan Scaffolding D Area NPU 32.
[udu Untuk Fasilitas Pasang Talang / Prosotan Jurrlah Kebotuhan eter
No. Sub Order Matera Sie ay
pak 483092 im
Pips 8.048.332 2m a
Poa Roa 3x32 3m
Pips 2.048.332 4m
Pipa R048 3x32 Sm
Pips R048 3x32 im 3
oda
FixCam 32
Swivel Clamp 20
Dsiba am
sia a
sia am
asia am
Taras an
Sip Coupler
Base Plate é
Putiog
[Tings m s
on Lebar m 2
Paniang ra 6
otal volume m3 7
Note
f
N\
2m
Workshop MAS Kontraktor
oa Yiang Oting suwarjo[Pekeriaan
Pemasangan Scaffolding Di Area NPU 31-E412 TIKI
ludul Untuk Fasiitas Check Pipa Jumlah Kebutuhan Material
No. Sub Order Material Se ‘ay
Pipa 0 48,332 am
Pipa R.0 48,3 3,2 2m 2
Pipa R.0 48,332 am 2
Pipa R.0 4833.2 am
[Pipa .0.48,3x3,2 Sm
[Pipa R.0.48,3x3.2 em
[Roda
[rocclamp 2
[Swivel Clamp
[asa am
[asia 3m 2
asia 2m 2
asia im
Har am,
Slip Coupler
[base Piate
[Putiog
ings! m 2
Lebar m 2
Panjang m 3
otal Volume: 3 2
Note:
3m
‘Workshop MAS Kontrakior
suwario
—- Ujang OtingSa ATTA
i ei
=: wet Ee
2
fs 2
~~ = —
S 2
. ice
yg = +
= za
Eee
a
[a
a fPekeriaan 7 Pemasangan Scaffolding Di Area CDU PIPERACK 11 TITIKS
Jucut Untuk Fasitas Perbaikan Bocoran ae el eee %
No. Sub Order Material Sie ay
Pipa RO 48,3x32 Im 30
Pipa R.0 48,3x3,2 2m 35
Pipa R.0 48,3x3,2 3am 35
Pipa R.0 48,3%3,2 ‘am
Pips R.0-48,3 «3.2 Sm
Pipa R.0 48,3 x3.2 6m
Roda
Fix clamp a
[Swivel Clamp 12
~ Hanarai fasba C3
[Asiba 3m
[asa 2m 70
[Asia am 1
a 4m
Slip Coupler
[base Plate
Putiog
ings = 3
Lebar m 2
— Brace Panjang m 2
Frtal Volume: oo a2
[Notes
Tangoa
2m
‘Workshop MAL Kentraktor
Ww ae
urarjo
|e wie[Pekerjaan + Pemasangan Saffoding Di Area CDU PIPERAGK 11 THK feoii tdiedaimane ;
ludul + Untuk Fata Perbalkan Bocoran
no. Sub Order Matera She ay
pak 483%32 im 10
Pipa R.048,3%3.2 2m 10
Pipa R.048.3x3.2 3m 20
Pips .0483x3.2 4m
Pipa R.0 483 x32 Sm
Pipa R.0 483.32 m
Roda
eclamp a
Swivel Camp 2
[asiba am
sibs 3m a
[aba 2m 3
asiba im
ranges am
Sip coupter
base Pate
Ppurog
[Tings m 3
[Lebar m 2
Panjang m 3
otal volume m3 18
Note:
Tengoa
Workshop MAL Kontraktor
[Po ea
suwarjo
eA HeerPekerjaan 7 Pemasangan Scaffolding Di Area COU PIPERACK Ti TITIKT
fudut + Untuk Fasltas Perbaikan Bocoran eee
Ino. Sub Order Material Sie ay
Pipa RO 48,332 Tm 30
Pipa R.0.48,3x3,2 2m 30
Pipa R.0.48,3%3,2 3m 20
Pipa R.0 48,3 13,2 4m
Pipa R.0-48,3 13,2 Sm
Pips R.0 48,33,2 6m
Roda
Fix clamp a
[Swivel Clamp 2
[asba am
[siba 3m é
Asiba 2m 3
asiba im
ranges ‘am
[sip Coupler
[Base Plate
Putiog
ing m z
Lebar m 2
Panjang m 3
Fetal Volume ma 8
Nate
Tengga
Workshop MAL Kontraktor
th e
jang Oting SuwarjoPekerjaan
Pemasangan Scaffolding Di Area RCC 15-P-102
Jumlah Kebutuhan Material
judul ‘Untuk Fasilitas Perbaikan Lampu te
No. Sub Order Material ‘Size ‘aty
Pipa RO 48,3x32 im Er
[Pipa R.0 48,3 x3,2 2m 3
[Pipa R.0.48,3 «3,2 3m 33
[Pipa R.0.48,3 «3,2 am
[Pipa R.0-48,3%3,2 Sm
[Pipa R.0.45,3x3,2 6m
[Roda
[Foc Clamp 30
[Swivel Clamp a
fasiba 4m
[Asiba 3m.
lasiba 2m 10
[Asiba am 1
4m.
4
m 3
Tangga ry 2
Panjang m 2
[Total Volume m3, 2
INote:
‘Workshop MAL ‘Kontraktor
ste