You are on page 1of 3

Contract No.

: 23KL0024
Contract Off-Carriageway Improvement - Primary Roads - Butuan City - Cagayan de Oro
Name: City - Iligan City Rd - K1448+585 - 1450+345

Location of Opol and El Salvador City, Misamis Oriental


the Contract:

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MISAMIS ORIENTAL 2nd
DISTRICT ENGINEERING OFFICE
Region X
Balase Street, El Salvador City

BID PRICES IN THE BILL OF QUANTITIES


Part No. _________________ Part Description: _______________________

Pay Item No. Description Quantity Unit Unit Price Amount


(1) (2) (3) (4) (5) (6)

FACILITIES FOR THE


PART A
ENGINEER

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
Provision of Field Office for
A.1.1 (8) 4.87 mos. ____ _____
the Engineer (Rental Basis) In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

OTHER GENERAL
PART B
REQUIREMENTS

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
B.5 Project Billboard/Signboard 4.00 each ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
Occupational Safety and
B.7(1) 4.87 mos. ____ _____
Health Program In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
B.8(1) Traffic Management 4.87 mos. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
B.9 Mobilization/Demobilization 1.00 l.s. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

Page 1 of 3
PART C EARTHWORKS

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
102(2) Surplus Common Excavation 4,898.63 cu.m. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
Structure Excavation
103(1)a 3,357.20 cu.m. ____ _____
(Common Soil) In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
103(3) Foundation Fill 210.83 cu.m. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
105(1)a Subgrade Preparation 7,231.45 sq.m. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

PART D SUBBASE AND BASE COURSE

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
200(1) Aggregate Subbase Course 2,093.75 cu.m. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

PART E SURFACE COURSES

in words: Pesos ________________ in words: Pesos ________________


Portland Cement Concrete _______________________________ ______________________________
311(1)c1 Pavement (Unreinforced, 5,001.00 sq.m. ____ _____
In figures: Php In figures: Php
230mm THK., 14 days) _______________________________ ______________________________
_____ ______

DRAINAGE AND SLOPE


PART G
PROTECTION STRUCTURES

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
Pipe Culverts (1070mm dia.,
500(1)a4 604.00 m. ____ _____
Class II, RCPC) In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

Page 2 of 3
in words: Pesos ________________ in words: Pesos ________________
_______________________________ ______________________________
Manholes (1070mm dia.,
502(1)a4 38.00 each ____ _____
Concrete) In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

PART H MISCELLANEOUS ITEMS

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
Curb and Gutter (Cast in
600(4) 774.00 li.m. ____ _____
Place) In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
601(1) Sidewalk (100mm THK.) 1,540.00 sq.m. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

in words: Pesos ________________ in words: Pesos ________________


_______________________________ ______________________________
624(8) Solar LED Street Light 10.00 ea. ____ _____
In figures: Php In figures: Php
_______________________________ ______________________________
_____ ______

TOTAL (In Words) :

Submitted by:

Name and Signature of Bidder's Authorized Representative

Designation

Bidder

Page 3 of 3

You might also like