DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Contract ID : 23NG0134
Contract Name : REPAIR OF CLASSROOMS, VICENTE C. CABILAO MEMORIAL ELEMENTARY
SCHOOL
Contract Location : SURIGAO CITY, SURIGAO DEL NORTE
Approved Budget Cost : Php 2,524,497.29

(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring Entity) to be filled up by the Bidder)

Pay Description Unit Quantity Unit Price (Pesos) Amount (Pesos)


Item No.

(1) (2) (3) (4) (5) (6)


Part I Other General Requirements
B.3 Permits and Clearances l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

B.5 Project Billboard/Signboard each 2.00 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

B.7(2) Occupational Safety and Health l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Program

Part II Civil, Mechanical, Electrical


and Sanitary/Plumbing
Works
Part A Earthworks
801 (1) Removal of Structures and l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Obstruction
803(1)a Structure Excavation (common soil) Cu.m. 38.55 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

804(1)a Embankment (from structure Cu.m. 4.85 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
excavation)
804(1)b Embankment (from borrow) Cu.m. 3.55 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

804(4) Gravel Fill Cu.m. 11.27 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

Part B Plain and Reinforced


Concrete Works
900(1)c1 Structural Concrete (A, 28days) Cu.m. 18.14 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

902(1)a Reinforcing Steel (deformed)(grade kg 802.73 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
40)
902(1)b Reinforcing Steel (deformed)(grade kg 388.27 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
60)
903(2) Formworks and Falseworks Sq.m. 43.67 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

Part C Finishing and Other Civil


Works
1046(2)a1 CHB non load bearing (including Sq.m. 92.77 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
reinforcing steel)(100mm.)

1046(2)a2 CHB non load bearing (including Sq.m. 33.60 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
reinforcing steel)(150mm.)

1003(17) Carpentry and Joinery Works l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1004(2) Finishing Hardware (Locksets, l.s. 1.00 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
hinges)
1005(6) Window Accessory (window grills) l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1005(1) Residential Casement Steel Window Sq.m. 0.36 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

40
1009(1)a Jalousie Windows (glass) Sq.m. 8.10 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1010(2)a Doors (flush) Sq.m. 1.68 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1010(2)b Doors (wood panel) Sq.m. 4.20 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1003(1)c2 Ceiling (6mm, wood frame, marine Sq.m. 80.68 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
plywood)
1003(11)a1 Fascia Board (12mm, Fiber Cement m 42.26 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Board)
1016(1)a Waterproofing(cement-base) Sq.m. 86.40 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1018(1) Glazed Tiles and Trims Sq.m. 10.35 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1018(2) Unglazed Tiles Sq.m. 4.00 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1018(3) Unglazed tiles(granite tiles for floor) Sq.m. 48.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1021(1)a Cement Floor Finish (plain) Sq.m. 10.45 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1027(1) Cement Plaster Finish Sq.m. 194.29 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1032(1)a Painting Works (Masonry/Concrete) Sq.m. 323.68 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1032(1)b Painting Works(wood) Sq.m. 92.44 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1032(1)c Painting Works (steel) Sq.m. 245.95 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1014(1)b1 Prepainted Metal Sheets(above Sq.m. 86.58 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
0.427mm, corrugated type, long
span)
1013(2)a1 Fabricated Metal Roofing Accessory L.m. 8.80 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
(gauge 26, Ridge/hip rolls)
1013(2)a2 Fabricated Metal Roofing Accessory L.m. 63.52 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
(gauge 26, Flashings)
1013(2)b1 Fabricated Metal Roofing Accessory L.m. 17.60 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
(gauge 24, Gutters)
1047(1) Structural Steel l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1047(2)a Structural Steel (trusses) kg 1,163.99 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1047(2)b Structural Steel (purlins) kg 872.87 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1047(3)c Metal Structure Accessories each 8.00 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
(turnbuckle)
1047(4) Metal Structure Accessories (cross kg 37.64 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
bracing)
1047(6) Metal Structure Accessories (Steel kg 214.35 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Plates)
1047(7)a Metal Structure Accessories (bolts) kg 4.47 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1047(7)b Metal Structure Accessories (sagrods) kg 24.00 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1001(8) Sewer line works (PVC Pipes 100Ø, l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
50Ø)
1001(9) Storm Drainage and Downspout(PVC l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Pipes 100Ø)
1002(4) Plumbing Fixtures (water closets, l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
lavatory and other plumbing fixtures)
1002(24) Cold Water Lines (PVC Pipes of Water l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Lines)
1001(11) Septic Vault (concrete) l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

1001(6) Catch Basin l.s. 1.00 In words: Pesos ______________________


In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________

Part D Electrical
1100(10) Conduits, Boxes, and fittings (conduit l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
works/conduit rough-in)
1101(33) Wires and wiring devices (connection l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
wires and switches)
1103(1) Lighting Fixtures and Lamps (40W FL l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
box type and 18W CFL)

Part E Mechanical

41
1208(1) Fire Alarm System (Fire Alarm l.s. 1.00 In words: Pesos ______________________
In figures: Php ____________________
In words: Pesos ______________________
In figures: Php ____________________
Control Panel, Manual Pull Switch,
Smoke Detector, Vibrating Bell)

Submitted by:

______________________________ Date: ___________________

________________________________________
Position

________________________________________
Name of Bidder

42

You might also like