You are on page 1of 7

Department of Public Works and Highways (DPWH)

Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________

(Columns (1), (2), (3), and (4) are to (Columns (5) and (6) are to
be filled up by the Procuring Entity) be filled up by the Bidder)
Pay
Item Amount
Description Unit Quantity Unit Price (Pesos)
No. (Pesos)

(1) (2) (3) (4) (5) (6)

In Words: In figures:
Pesos One Hundred Thirty-Six Thousand Php 136,290.23
Two Hundred Ninety and 23/100
PART II OTHER GENERAL REQUIREMENTS #N/A -
In figures: Php 136,290.23

In Words: In figures:
Pesos Twenty-Four Thousand One Php 24,176.58
Lump Hundred Seventy-Six and 58/100
B.3 Permits/Clearances 1.00
sum
In figures: Php 24,176.58

In Words: In figures:
Pesos Five Thousand Four Hundred Php 5,432.53
Thirty-Two and 53/100
B.5 Project Billboard/Sign Board Each 1.00
In figures: Php 5,432.53

In Words: In figures:
Pesos Eighty-Six Thousand One Hundred Php 86,187.12
Lump Eighty-Seven and 12/100
B.7(1) Occupational Safety and Health 1.00
sum
In figures: Php 86,187.12

In Words: In figures:
Pesos Twenty Thousand Four Hundred Php 20,494.00
Lump Ninety-Four
B.9 Mobilization/Demobilization 1.00
sum
In figures: Php 20,494.00

In Words: In figures:
Pesos Thirteen Million Two Hundred Php 13,273,356.70
CIVIL, MECHANICAL, ELECTRICAL AND Seventy-Three Thousand Three Hundred
PART III - - Fifty-Six and 70/100
SANITARY / PLUMBING WORKS
In figures: Php 13,273,356.70

In Words: In figures:
Pesos Four Hundred Thirty-Eight Php 438,591.29
Thousand Five Hundred Ninety-One and
PART A EARTHWORKS - - 29/100

In figures: Php 438,591.29


In Words: In figures:
Cubic Pesos Two Hundred Ninety and 46/100 Php 71,052.33
803(1)a Structure Excavation 244.62
Meter
In figures: Php 290.46

In Words: In figures:
Pesos One Hundred Eighty-Nine and Php 26,329.23
31/100
Cubic
804(1)a Embankment from Structure Excavation 139.08
Meter In figures: Php 189.31

In Words: In figures:
Pesos One Thousand Fifty-Five and Php 168,509.60
56/100
Cubic
804(1)b Embankment from Borrow 159.64
Meter In figures: Php 1,055.56

In Words: In figures:
Pesos Three Thousand Seven Hundred Php 172,700.13
Forty-Nine and 46/100
Cubic
804(4) Gravel Fill 46.06
Meter In figures: Php 3,749.46

In Words: In figures:
Pesos Six Million Eighty-Five Thousand Php 6,085,506.23
Five Hundred Six and 23/100
PART B PLAIN AND REINFORCED CONCRETE WORKS - -
In figures: Php 6,085,506.23

In Words: In figures:
Pesos Thirteen Thousand Fifty-Two and Php 2,626,472.07
Cubic 9/100
900(1)c1 Structural Concrete (Class A, 28 days) 201.23
Meter
In figures: Php 13,052.09

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 1 of 7
Department of Public Works and Highways (DPWH)
Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________


(Columns (1), (2), (3), and (4) are to (Columns (5) and (6) are to
be filled up by the Procuring Entity) be filled up by the Bidder)

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 2 of 7
Department of Public Works and Highways (DPWH)
Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________


Pay
Item Amount
Description Unit Quantity Unit Price (Pesos)
No. (Pesos)

(1) (2) (3) (4) (5) (6)

In Words: In figures:
Pesos Seventy-Two and 71/100 Php 2,628,799.51
Kilogra
902(1)a1 Reinforcing Steel, Grade 40 36,154.58 In figures: Php 72.71
m

In Words: In figures:
Pesos Six Hundred Thirty-Two and Php 830,234.65
42/100
Square
903(2) Forms and Falseworks 1,312.79
Meter In figures: Php 632.42

In Words: In figures:
Pesos Five Million Sixty-Seven One Php 5,067,108.28
Hundred Eight and 28/100
PART C FINISHING WORKS - -
In figures: Php 5,067,108.28

In Words: Pesos In figures:


Eighty-Four Thousand Seven Hundred Php 84,708.21
Eight and 21/100
C.1. Termite Control Works #N/A -
In figures: Php 84,708.21

In Words: In figures:
Pesos Seven Hundred Thirty-Two and Php 84,708.21
77/100
1000(1) Soil Poisoning Liter 115.60
In figures: Php 732.77

In Words: In figures:
Pesos Eight Hundred Sixty-Six Six Php 866,680.05
Hundred Eighty and 5/100
C.2. Masonry Works #N/A -
In figures: Php 866,680.05

In Words: In figures:
Pesos Nine Hundred Seventy-Two and Php 143,321.43
99/100
100 mm CHB Non Load Bearing Wall (including Square
1046(2)a1 147.30
Reinforcing Steel) Meter
In figures: Php 972.99

In Words: In figures:
Pesos One Thousand Four Hundred Php 723,358.62
Thirty-Four and 41/100
150 mm CHB Non Load Bearing Wall (including Square
1046(2)a2 504.29
Reinforcing Steel) Meter
In figures: Php 1,434.41

In Words: In figures:
Pesos Seven Hundred Six Thousand Ninety- Php 706,093.39
Three and 19/100
C.3. Fabricated Materials #N/A -

In figures: Php 706,093.39

In Words: In figures: Php 185,074.21


Pesos One Hundred Eighty-Five
Thousand Seventy-Four and 21/100
Lump
1010(4) Wooden Door 1.00
Sum
In figures: Php 185,074.21

In Words: In figures:
Pesos Two Thousand One Hundred Php 75,525.65
Sixty-Two and 20/100
Square
1009(1)a Jalousie Window 34.93
Meter In figures: Php 2,162.20

In Words: In figures: Php 356,659.89


Pesos Four Thousand Eight Hundred
Fifty-Six and 48/100
Square
1005(1) Steel Casement Window 73.44
Meters
In figures: Php 4,856.48

(Columns (1), (2), (3), and (4) are to (Columns (5) and (6) are to
be filled up by the Procuring Entity) be filled up by the Bidder)

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 3 of 7
Department of Public Works and Highways (DPWH)
Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________


Pay
Item Amount
Description Uni t Quantity Unit Price (Pesos)
No. (Pesos)

(1) (2) (3) (4) (5) (6)

In Words: In figures: Php 42,935.96


PesosOne Thousand Three Hundred
Fifteen and 44/100
Square
1005(5) Window Grill 32.64
Meter
In figures: Php 1,315.44

In Words: In figures: Php 22,528.80


Pesos Twenty-Two Thousand Five
Hundred Twenty-eight and 80/100
Lump
1004(2) Finishing Hardware 1.00
Sum
In figures: Php 22,528.80

In Words: In figures: Php 23,368.88


Pesos Twenty-Three Thousand Three
Hundred Sixty-Eight and 88/100
Lump
1003(17) Carpentry and Joinery Works (Blackboard) 1.00
Sum
In figures: Php 23,368.88

In Words: In figures:
Pesos One Million Seven Hundred Fifty- Php 1,755,893.41
Five Thousand Eight Hundred Ninety-
C.4. Finishing Works #N/A - three and 41/100

In figures: Php 1,755,893.41

In Words: In figures: Php 318,544.60


Pesos Five Hundred Forty-four and
53/100
Square
1021(1)c Plain Cement Finish with floor hardener 584.99
Meter
In figures: Php 544.53

In Words: In figures: Php 657,502.97


Pesos Two Hundred Eighty-Eight and
78/100
Square
1027(1) Plain Cement Plaster Finish 2,276.83
Meter
In figures: Php 288.78

In Words: In figures: Php 122,458.90


Pesos One Hundred Twenty-Two
Thousand Four Hundred Fifty-Eight and
Lump
1051(6) Railings 1.00 90/100
Sum

In figures: Php 122,458.90


In Words: In figures: Php 366,077.52
Pesos One Thousand Ninety-nine and
53/100
Square
1003(1)a1 Fiber Cement Board Ceiling on Metal Frame 332.94
Meters
In figures: Php 1,099.53

In Words: In figures: Php 170,313.41


Pesos Nine Thousand Two Hundred Six
and 13/100
Square
1044(2)a Folding Partition 18.50
Meter
In figures: Php 9,206.13

In Words: In figures: Php 92,469.07


Pesos One Thousand Two Hundred
Ninety-Two and 37/100
Square
1018(1) Glazed Tiles and Trims 71.55
Meter
In figures: Php 1,292.37

In Words: In figures: Php 28,526.94


Pesos One Thousand Four Hundred
Twenty-Two and 79/100
Square
1018(2) Unglazed Tiles 20.05
Meter
In figures: Php 1,422.79

In Words: In figures: Php 540,949.57


Pesos Five Hundred Forty Thousand
Nine Hundred Forty-Nine and 57/100
C.5. Painting Works #N/A -

In figures: Php 540,949.57

(Columns (1), (2), (3), and (4) are to (Columns (5) and (6) are
be filled up by the Procuring Entity) to be filled up by the
Bidder)

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 4 of 7
Department of Public Works and Highways (DPWH)
Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________


Pay
Item Amount
Description Unit Quantity Unit Price (Pesos)
No. (Pesos)

(1) (2) (3) (4) (5) (6)

In Words: Pesos Two Hundred One In figures: Php 507,676.35


Thousand and 71/100
Square
1032(1)a Painting Works (Masonry/Concrete) 2,516.91
Meter
In figures: Php 201.71

In Words: In figures: Php 18,196.69


Pesos One Hundred Thirty-Six and
54/100
Square
1032(1)b Painting Works (Wood) 133.27
Meter
In figures: Php 136.54

In Words: In figures: Php 15,076.53


Pesos Two Hundred Forty and 34/100
Square
1032(1)c Painting Works (Steel) 62.73
Meter
In figures: Php 240.34

In Words: In figures: Php 1,500,671.51


Pesos One Million Five Hundred
Thousand Six Hundred Seventy-One and
C.6. Roof Framing and Roofing Works #N/A - 51/100

In figures: Php 1,500,671.51

In Words: In figures: Php 347,706.28


Pesos Eight Hundred and 65/100
Prepainted Metal Sheets, Long Span, Square
1014(1)b1 434.28
Corrugated, 0.5 mm thk Meter
In figures: Php 800.65

In Words: In figures: Php 10,966.23


Pesos Three Hundred Thirty-three and
32/100
Fabricated Metal Roofing Accessory (Ridge Roll,
1013(2)a1 Meter 32.90
0.6 mm thk)
In figures: Php 333.32

In Words: In figures: Php 8,736.32


Pesos Three Hundred Thirty-three and
32/100
Fabricated Metal Roofing Accessory (Flashing,
1013(2)a2 Meter 26.21
0.6 mm thk)
In figures: Php 333.32

In Words: In figures: Php 30,710.18


Pesos Four Hundred Sixty-Six and
72/100
Fabricated Metal Roofing Accessory (Gutter, 0.6
1013(2)b1 Meter 65.80
mm thk)
In figures: Php 466.72

In Words: In figures: Php 374,947.90


Pesos One Hundred Six and 4/100

1047(2)a Structural Steel, Trusses Kilogram 3,535.91

In figures: Php 106.04

In Words: In figures: Php 514,475.70


Pesos Ninety-nine and 50/100

1047(2)b Structural Steel, Purlins Kilogram 5,170.61

In figures: Php 99.50

In Words: In figures: Php 17,488.32


Pesos Two Hundred Sixty-Five and
78/100
1003(11)a1 Fascia Board Meter 65.80

In figures: Php 265.78

In Words: In figures: Php 23,507.26


Pesos Eighty-four and 72/100

1047(6) Kilogram
Metal Structure Accessories, Steel Plates 277.47
In figures: Php 84.72

(Columns (1), (2), (3), and (4) are to (Columns (5) and (6) are to
be filled up by the Procuring Entity) be filled up by the Bidder)

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 5 of 7
Department of Public Works and Highways (DPWH)
Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________


Pay
Item Amount
Description Unit Quantity Unit Price (Pesos)
No. (Pesos)

(1) (2) (3) (4) (5) (6)

In Words: In figures: Php 10,383.11


Pesos Seventy and 72/100
Kilogra
1047(7)b Metal Structure Accessories, Sag Rods 146.82
m
In figures: Php 70.72

In Words: In figures: Php 23,246.66


Pesos Seventy-Three and 82/100
Kilogra
1047(4) Metal Structure Accessories, Cross Bracing 314.91
m
In figures: Php 73.82

In Words: In figures: Php 6,951.10


Pesos Two Hundred Sixty-Seven and
35/100
1047(3)c Metal Structure Accessories, Turn Buckle Piece 26.00

In figures: Php 267.35

In Words: In figures: Php 131,552.47


Pesos One Hundred Thirty-One
Thousand Five Hundred Fifty-Two and
Lump
1047(10) Metal Structure Accessories (Fire Escape) 1.00 47/100
Sum
In figures: Php 131,552.47

In Words: In figures: Php 1,021,997.50


Pesos One Million Twenty-One Thousand
Nine Hundred Ninety-Seven and 50/100
PART D PLUMBING/SANITARY WORKS - -
In figures: Php 1,021,997.50

In Words: In figures: Php 35,464.09


Pesos Thirty-Five Thousand Four
Hundred Sixty-Four and 9/100
Lump
1001(8) Sewer Line Works 1.00
Sum
In figures: Php 35,464.09

In Words: In figures: Php 11,303.15


Pesos Eleven Thousand Three Hundred
Three and 15/100
Lump
1002(24) Cold Water Line Works 1.00
Sum
In figures: Php 11,303.15

In Words: In figures: Php 92,451.69


Pesos Ninety-Two Thousand Four
Hundred Fifty-One and 69/100
Lump
1001(9) Storm Drainage and Downspout 1.00
Sum
In figures: Php 92,451.69

In Words: In figures: Php 153,490.41


Pesos One Hundred Fifty-Three
Thousand Four Hundred Ninety and
Lump
1002(4) Plumbing Fixtures 1.00 41/100
Sum

In figures: Php 153,490.41


In Words: In figures: Php 76,458.55
Pesos Seventy-Six Thousand Four
Hundred Fifty-Eight and 55/100
Lump
1001(11) Septic Vault 1.00
Sum
In figures: Php 76,458.55

In Words: In figures: Php 61,359.36


Pesos Three Thousand Eight Hundred
Thirty-Four and 96/100
1001(5)b Catch basin Units 16.00

In figures: Php 3,834.96

In Words:
Pesos Five Hundred Ninety-One
Lump Thousand Four Hundred Seventy and
1201(1) Water Pumping System 1.00 In figures: Php 591,470.25
Sum 25/100

In figures: Php 591,470.25

(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring to be filled up by the
Entity) Bidder)

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 6 of 7
Department of Public Works and Highways (DPWH)
Contract ID : 18EE0176
Contract Name : Construction of Two-Storey (6 Classrooms) School Building Salvacion NHS-Concepcion Annex

Location of the Contract : Busuanga, Palawan

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No. ___________ Part Description: __________________


Pay
Item Amount
Description Unit Quantity Unit Price (Pesos)
No. (Pesos)

(1) (2) (3) (4) (5) (6)

In Words: In figures: Php 272,265.55


Pesos Two Hundred Seventy-Two
Thousand Two Hundred Sixty-Five and
PART E ELECTRICAL - -
55/100
In figures: Php 272,265.55

In Words: In figures: Php 47,419.06


Pesos Forty-Seven Thousand Four
Conduits, Boxes & Fittings (Conduit Lump Hundred Nineteen and 6/100
1100(10) 1.00
Works/Conduit Rough-In) Sum In figures: Php 47,419.06

In Words: In figures: Php 82,838.19


Pesos Eighty-Two Thousand Eight
Lump Hundred Thirty-Eight and 19/100
1101(33) Wires and Wiring Devices 1.00
Sum
In figures: Php 82,838.19

In Words: In figures: Php 41,890.06


Pesos Forty-One Thousand Eight
Lump Hundred Ninety and 6/100
1102(1) Panel Board with Main & Branch Breaker 1.00
Sum
In figures: Php 41,890.06

In Words: In figures: Php 70,929.57


Pesos Seventy Thousand Nine Hundred
Lump Twenty-Nine and 57/100
1103(1) Lighting Fixtures and Lamps 1.00
Sum
In figures: Php 70,929.57

In Words: In figures: Php 29,188.67


Pesos Twenty-Nine Thousand One
Lump Hundred Eighty-Eight and 67/100
1208(1) Fire Alarm System 1.00
Sum
In figures: Php 29,188.67

Total Bid Price . . . . Php. In Words:


Pesos Thirteen Million Four
Hundred Nine Thousand Six
Hundred Forty-Six Thousand and
93/100

In figures: Php
13,409,646.93

Submitted by:

ROMEO A. BAGAIN________
Name and Signature of Bidders's Representative

PRESIDENT___________ Date: _________________


Position

Tekton Construction Corporation


(Name of the Bidder)

--------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 7 of 7