(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring to be filled up by the Bidder)
Entity)
Pay
Item No. Description Quantity Unit Unit Price Amount
(Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
PART B OTHER GENERAL REQUIREMENTS
In words: In words:
Six Thousand nine hundred Sixty seven thousand six hundred
Project twenty four pesos ninety six Pesos
B.5 4.00 Each
Billboard/Signboard
In figures: In figures:
Php 16,924.00 Php 67,696.00
In words: In words:
Fifty three thousand seven Fifty three thousand seven hundred
Occupational Safety and hundred seven two pesos and seven two pesos and sixty centavos
B.7(2) 1.00 L.s
Health Program sixty centavos
In figures: In figures:
Php 53,772.60 Php 53,772.60
In words: In words:
Eleven thousand eight hundred
ninety four pesos and forty ** Expression is faulty ** pesos and
B.8(1) Traffic Management 4.00 Month centavos sixty centavos
In figures:
Php 11,894.40 In figures:
Php 47,577.60
In words: In words:
Twenty eight thousand two Twenty eight thousand two hundred
Mobilization/ hundred ninety eight pesos and ninety eight pesos and seventy six
B.9 1.00 L.s
Demobilization seventy six centavos centavos
In figures: In figures:
Php 28,298.76 Php 28,298.76
In words: Pesos thirty thousand In words: Pesos thirty thousand seven
seven hundred seven six pesos hundred seven six pesos and seventy
Removal and Relocation and seventy six centavos six centavos
B.12 1.00 L.s
of Utilities
In figures:
Php 30,776.76 In figures:
Php 30,776.76
Part No. II Part Description: PART C EARTHWORKS, Individual Removal of Trees, 150-
300 mm dia, Small, Surplus Common Excavation, Structure Excavation, Common Soil, Pipe
Culverts and Drain Excavation, Common Soil, Embankment from Roadway/Structure
Excavation, Common Soil, Subgrade Preparation (Common Material)
(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring Entity) to be filled up by the Bidder)
Pay
Item No. Description Quantity Unit Unit Price Amount
(Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
PART C EARTHWORKS
In words: Pesos three thousand In words: Pesos thirty seven thousand
Individual Removal of four hundred thirty two pesos seven hundred sixty one pesos
and eighty two centavos
100(3)a1 Trees, 150-300 mm 11.00 Each
dia., Small In figures: In figures:
Php 3,432.82 Php 37,761.00
In words: Pesos one hundred In words: Pesos six hundred seventy
ninety six three pesos and thirty three thousand five hundred thirty one
Surplus Common centavos pesos and forty centavos
102(2) 3,435.18 Cu.m
Excavation
In figures: In figures:
Php 196.07 Php 673,531.40
In words: Pesos three hundred In words: Pesos one hundred eighty
seventy seven pesos and twenty seven thousand six hundred fifty four
Structure Excavation, three centavos pesos and sixty six centavos
103(1)a 497.46 Cu.m
Common Soil
In figures: In figures:
Php 377.23 Php 187,654.66
In words: In words:
Pipe Culverts and Drain six hundred seventy two pesos eight thousand five hundred nine
and sixty six centavos pesos and ten centavos
103(6)a Excavation, Common 112.65 Cu.m
Soil In figures: In figures:
Php 672.66 Php 8,509.10
In words: In words:
Embankment from two hundred twenty five pesos two hundred thirty two thousand five
Roadway/Structure and forty seven centavos hundred seventy six pesos and eighty
104(1)a 1,031.50 Cu.m two centavos
Excavation, Common
Soil In figures: In figures:
Php 225.47 Php 232,576.82
In words: In words:
twenty four pesos and fifty eighty seven thousand five hundred
Subgrade Preparation seven centavos seventy four pesos and seventy eight
105(1)a 3,563.96 Sq.m centavos
(Common Material)
In figures: In figures:
Php24.57 Php 87,574.78
Part No. III Part Description: PART D SUBBASE AND BASE COURSE, Aggregate Subbase
Course, PART E SURFACE COURSES, Portland cement Concrete Pavement (Unreinforced),
0.23m thick, 14 days, PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES, Reinforcing
Steel, Grade 40 (Line Canal), Structural Concrete Class A, 20.68 Mpa, Class A, 14 days (Line
Canal), Pipe Culverts, 910 mm dia., Class IV, RCPC
(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring Entity) to be filled up by the Bidder)
Pay
Item No. Description Quantity Unit Unit Price (Pesos) Amount
(Pesos)
Part No. IV Part Description: Stone Masonry (headwall, wingwall, apron and
catchbasin), PART H MISCELLANEOUS STRUCTURES, Road Marker (DA and DPWH), Trees
Furnishing, Trees Transplanting (Coco Tree), Reflectorized Thermoplastic Pavement
Markings (white)
(Columns (1), (2), (3), and (4) are (Columns (5) and (6) are
to be filled up by the Procuring Entity) to be filled up by the Bidder)
Pay
Item No. Description Quantity Unit Unit Price Amount
(Pesos) (Pesos)
(1) (2) (3) (4) (5) (6)
In words: Pesos five thousand In words: Pesos two hundred seventy
Stone Masonry seventy pesos and five centavos three thousand seven hundred eighty
two pesos and sixty three centavos
506(1) (headwall, wingwall, 54.00 Cu.m In figures: In figures:
apron and catchbasin) Php 5,070.05 Php 273,782.63
Submitted by: