You are on page 1of 4

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
1. FOR GENERAL INSTRUCTIONS ON TESTING REFER TO
SAUDI ARAMCO ENGINEERING STANDARDS SAES-L-150,
SAES-A-004, SAES-A-007 AND GI.2.102.

2.ALL TEMPORARY FITTINGS, VENT VALVES, BLINDS,


BLIND FLANGES, GASKETS & PLUGS MARKED WITH
ASTERISK (*) SHALL BE REMOVED AFTER
HYDROSTATIC TESTING AND REPLACED WITH
PERMANENTLY ALLOCATED MATERIALS. TEMPORARY
FITTINGS SHALL BE REMOVED AFTER HYDROTEST.

3.WATER SHALL BE DRAINED FROM THE POINTS AS


INSTRUCTED BY SAUDI ARAMCO FIELD
REPRESENTATIVE.

4.ALL IN-LINE VALVES NOT USED AS TEST ISOLATION


1LE1W01 15LE1W01 1" V
VALVE SHALL BE IN A PARTIALLY OPEN POSITION.
#5
2"x1"
5.ALL PERMANENT THREADED CONNECTIONS SHALL
2" 2" BE SEAL WELDED PRIOR TO HYDROTEST.

6.REMOVE DISCS & FLAPPERS FROM THE CHECK

#7 #5 VALVE AND REMOVE ORIFICE PLATE BEFORE

V HYDROTEST.
1"-RL-0285-1SY0W01 1"
PZV
#5
1003 2"x1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
FB18 G18
2" 2" 2" & BODY TESTED AS PER SAEL-L-108 PAR.4.7.
2"-W-0288-15LE1W01
#7
V ¾"x1" 2" EQUALIZING LINE
¾" CSO 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
*
#7 1" 2"x1" 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.

2"-W-0287-15LE1W01
1SY0W01
1LE1W01

2"-VG-0286-15LE1W01
CSO #5 1" D V 2" 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE

*
¾" TURNED TO ITS OPEN POSITION AFTER TESTING.
#5
(TYP.)
V #6 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
#6 #5 PRESSURE INDICATED IN THE DRAWING.
XPI PL02
G17 2" #5
¾"-VG-0284-15SY0W01 1035
PURGE 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
#4 2" PI
FB17 CONN * INT.FBE COATED INT.PE-RT LINED WIP DS-03 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
1019
¾" ¾" CARBON STEEL CARBON STEEL FENCE FENCE
PI ¾"
CSO 1" #4 12.COMPONENTS WHICH INTERFERE WITH FILLING
1018 XPI
2"x¾" * FB05 FLUSHING, VENTING AND DRAINING SHALL NOT
#6 #5 1034 2"x¾" *
#4 BE INSTALLED WITH LINE FILLING AND PRESSURE
#5 MOV THRUST THRUST
2" #5 2" +
#4

*
1005 #4 #3 ANCHOR TESTING.
2" M
ANCHOR
CSO

*
END 2" 2" TO DS-03
607-L-0002 * 8" WATER INJECTION FLANK WI-2
CLOSURE CA-903039.001
2" 8"-1500# BARRED ( INT.PE-RT LINED C.S )
2" 3"
*

*
(TYP.) 1" SC FB TEE
2" #5A 2"
#4A #4A
FB04 G04
MIN. AG UG LEGEND
FB06 G06

D DRAIN
2"-VG-0279-1LE1W01

2"-D-0280-15LE1W01

V VENT
#4

*
#1 TEST LIMIT
2" 3" ¾" 2"x¾"
MOV
+
* TEMPORARY BLIND
1007

*
PDI TEMPORARY PLUG

M
1021
2"

8"-1500 SPECTACLE PLAT OPEN POSITION

PI
¾" SPECTACLE PLAT CLOSED POSITION
1030

*
* 2"x¾"
#4
¾"
#5A #5A #4

2"x¾" MIN
3"
3"-W-0281-15LE1W01

KICKER LINE
2"
PI REFERENCE DRAWINGS
1017 2"x1" DWG. CONTROL FOR JO-10-09561-0001 CD-901976
* #5A 1" D PIPING & INSTRUMENT DIAGRAM CA-902088.001
#4A ¾" PIPING & INSTRUMENT DIAGRAM CA-902089.001
FB23 G23 #7 #7 #4A
2"x¾" MATERIAL TAKE-OFF T/O-952850-001
2"
* * 2"-D-0282-15LE1W01
2"
DRAIN LINE

1LE1W01 15LE1W01
2"
#4A
#4
*

TO GRAVITY
SEWER TO GRAVITY
SEWER #4 BI-10-09561 (PLANT-605)
*

BI-10-00622 (PLANT-607) 10-09561-0002

605 160
FROM WIP WATER
INJECTION MANIFOLD
PLANT 607

ISSUED FOR CONSTRUCTION


8"-W-0283-15LE1W01
CA-XXXXXX.001

14-May-2023

SCALE:

REVISION VALIDATION

THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001
H Y D R O S T A T I C T E S T S C H E D U L E
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
STRENGTH TEST TIGHTNESS TEST (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST NO. LIMITED BY ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION HBZ MAB ORJ MSK
05/08/22 05/08/22 05/08/22 05/08/22

#4A, #4, REV.NO. DATE REVISION DESCRIPTION


INTERNAL FBE COATING 5575 PSIG 38439 KPaG 5854 PSIG 40362 KPaG 2 HRS 5296 PSIG 36515 KPaG 5561 PSIG 38342 KPaG
#5A, #5. * 0F2 05/08/22 ISSUED FOR CONSTRUCTION
PER 09-SAMSS-091
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
#3 & #6 A105N/A182 GR. F53 5625 PSIG 38783 KPaG 7031 PSIG 48477 KPaG 2 HRS 5344 PSIG 36846 KPaG 5611 PSIG 38686 KPaG 0F2 10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
*
ASME CL-1500 FLANGES
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
A105N/A182 GR. F53
#7 HYDROSTATIC TEST DIAGRAM
ASME CL-150 FLANGES
450 PSIG 3103 KPaG 473 PSIG 3261 KPaG 2 HRS 428 PSIG 2951 KPaG 449 PSIG 3096 KPaG * HYD

WI-2 SCRAPER LAUNCHER @ SBWIP


* TIGHTNESS TEST PRESSURE SHALL BE MAINTAINED LONG ENOUGH FOR THE INSPECTOR TO EXAMINE ALL EXPOSED JOINTS.
SOUTH BERRI WELL SITES FACILITIES

JUBAIL SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-952850 001 0F2


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05


NOTES:

1. ALL INSTRUMENT TAGS SHALL HAVE "605".PREFIX


UNLESS OTHERWISE NOTED.
2. LOCATE SCRAPER PASSAGE INDICATOR MINIMUM
ONE MAXIMUM SCRAPER LENGTH FROM BARRED TEE.
3. ALL BURIED PIPELINE SHALL HAVE CATHODIC
605-003-L-0003 PROTECTION PER SAUDI ARAMCO STANDARD
SAES-X-400 AND SAES-X-600 AS APPROPRIATE.
SCRAPER RECEIVER 4. ALL XPI SHALL BE SUITABLE FOR BIDIRECTIONAL
MAOP = 3600 PSIG SCRAPING AND REMOVAL UNDER LINE PRESSURE.
DESIGN TEMP =170 °F 5. SACRIFICIAL ANODES FOR CATHODIC PROTECTION
ASME CLASS = 1500 # ARE PROVIDED ON THRUST ANCHORS
DESIGN CODE = ASME B31.4 AS PER STD DWG. AA-036069.
TRIM = C.S. (INTERNALLY FBE COATED) 6. DELETED.
SIZE = 8"X10" 7. FOR MOV TYPICAL DETAIL, SEE DETAIL-B IN CA-902080
OPERATING PRESSURE: 1100 PSIG 8. INSTRUMENT TAG NUMBERS SHALL BE PREFIXED
OPERATING TEMPERATURE: 70 °F WITH DRILLSITE NUMBERS.
15LE1W01 1LE1W01
V 1" 9. FOR PI/PDI/PIT INSTALLATION DETAILS. REFER TO
P&ID CA-902080.001 DETAIL-C.
2"x1" 10. LINE NUMBERS SHOWN HERE ARE PREFIXED
2" 2" WITH (605-003).

2"-VG-0390-15LE1W01
V 1" 3/4"x1"
SET @ 3300.0 PSIG
2"x1" PZV
+

2" 2" 2"-W -0393-15LE1W01 EQUALIZING LINE 2" 1004 1"-RL -0391-1SY0W01

2" CSO 1" V


V 2"x1" 2"x1" CSO

NOTE-4 D 1" 1"


1"

1SY0W01
2"

1LE1W01
2"-W -0394-15LE1W01 1"
XPI 0 - 4000 PSIG LEGEND
2" V
DS-03 1036 PIPING MATERIAL INSTRUMENT DEFINITION & SYMBOLS SAES-J-003
FENCE PI 2" 3/4"-VG-0392-15SY0W01 SPECIFICATION SAES-L-105
MOV TYPICAL 0 - 4000 PSIG AC/AFO -AIR TO CLOSE/ VE -VIBRATION ELEMENT
1024 PURGE AIR FAILURE OPEN VS -VIBRATION SWITCH
3/4" DETAIL CONN 3/4" 2" AC/AFS -AIR TO CLOSE/AIR
INT.PE-RT LINED INT.FBE COATED 2"x3/4" PI PROCESS LINE VT -VIBRATION TRANSMITTER

CARBON STEEL CARBON STEEL 3/4" NOTE-7 CSO 1" FAILURE STEADY XL -PILOT LIGHT
XPI 1025 INSTRUMENT AO/AFC -AIR TO OPEN/ (NOT FOR MOTOR)
2"x3/4" AIR FAILURE CLOSE
2"x3/4" NOTE-2 2" 1037 AIR LINE XS -LIMIT SWITCH
MOV INSTRUMENT
AO/AFS -AIR TO OPEN/AIR ZV -SAFETY SHUTDOWN VALVE
THRUST +
2" FAILURE STEADY
ANCHOR 1010 M CSO 2" ELECTRICAL LINE
AOV -AIR OPERATED VALVE DATA LOGGER POINT
2" 2" F-FLOW P-PRESS.
FROM WIP TRAP AREA

INPUTS
8" WATER INJECTION FLANK WI-2 NOTE-3 2" 605-003-L-0003 AT
DT
-ANALYZER TRANSMITTER
-DENSITY TRANSMITTER
L-LEVEL T-TEMP.
BAND TYPE END

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
X-MISC. A-ALARM
CA-902088 SHT.001 SCRAPER RECEIVER REDUCER ESD -EMER. SHUTDOWN SYSTEM
( INT.PE-RT LINED C.S ) BARRED TEE BARRED TEE 8" CLOSURE FC - FLOW CONTROLLER
LOCAL PANEL
CL1500 SPECTACLE FV -FLOW CONTROL VALVE
MOUNTED INSTR.

FB 2" 2" SC 2" PLATE-OPEN FCV -FLOW CONTROL VALVE


NOTE-5 BOARD MOUNTED
(SELF-ACTUATED) INSTRUMENT
SPECTACLE FE -FLOW ELEMENT
PLATE-CLOSED FG -FLOW SIGHT GLASS
R /G
STATU S LIGH TS
GATE VALVE FHV -FLOW MANUAL CONT. VALVE XL
UG AG R =RED , G=GR EEN
MIN. 2" 3"
FHTD -FLOW MANUAL TRANSDUCER PILOT LIGH T (D O NOT
GLOBE VALVE FIC -FLOW IND ICATOR C ONTROLLER U SE FOR MOTOR STATU S)
CHECK VALVE FM -FLOW METER
FO -RESTRICTION ORIFICE MOTOR STATUS
PILOT LIGH T
PLUG VALVE FQI -FLOW TOTALIZER IND ICA TOR
MOV TYPICAL BALL VALVE
FR -FLOW RECORDER
LOCAL MOUNTED
ML
DETAIL FT -FLOW TRANSMITTER INSTRUMENT
DOUBLE DISC FY -FLOW RELAY
NOTE-7 GATE VALVE -HAND INDIC ATOR CONTROLLER
HIC
MOV TYPICAL

2"-VG-0389-1LE1W01
2" 2"x3/4" ANGLE VALVE
MOUNTED BEHIND

DETAIL MOV 3/4" HS -HAND SWITCH LOCAL PANEL

2"-D-0397-15LE1W01

2"-D-0395-15LE1W01
+
LA -LEVEL ALARM
NOTE-7 1008 LV -LEVEL CONTROL VALVE R AC K MOU NTED
PRESS. RELIEF VALVE LCV -LEVEL CONTROL VALVE (OR BACK OF PANEL)
(SELF-ACTUATED)
MOV + LG -LEVEL GAUGE GLASS ELECTRICAL
1020
PDI 0-30 PSI -LEVEL IND ICATOR C ONTROLLER SUPPLY REQUIRED
8" VACUUM RELIEF VALVE LIC
-LEVEL INDICATOR
LI
CL1500 2"

M
8" 1023 0 - 4000 PSIG -LEVEL RECORDER INSTRUMENT

M
LR
M LS -LEVEL SWITCH AIR SUPPLY REQUIRED
MOTOR OPERATED
PI LT -LEVEL TRANSMITTER
VALVE H
1031 LTD -LEVEL TRANSDUCER H IGH LOW
ML -MOTOR STATUS LIGHT L
P MOV -MOTOR OPERATED VALVE
PISTON OPERATED NA -ANNUNCIATOR TWO PEN R EC ORD ER
VALVE PB -PUSHBUTTON
2" 2"x3/4" 3/4" 3/4" PC -PRESSURE CONTROLLER FF
CONTROL VALVE PV -PRESS. CONTROL VALVE FOU ND ATION
PCV -PRESS. CONTROL VALVE FIELD BU S IN STRU MEN T
2"x3/4" (SELF ACTUATED)
P
BALL TYPE PDC -PRESS. DIFF. CONTROLLER DISTRIBUTED CONTROL/SHARED
CONTROL VALVE PDI -PRESS. DIFF. INDICATOR DISPLAY SYMBOLS
MIN 2" WITH POSITIONER PDIC -PRESSURE DIFFERENTIAL
3" 3"-W -0396-15LE1W01 KICKER LINE INDICATOR CONTROLLER
(DCS) DISTRIB UTED C ONTROL
S SYSTEM, OPERATOR ACCESSIBLE
SOLENOID VALVE PDIS -PRESSURE DIFFERENTIAL IN C ONTROL R OOM
2" 0 - 4000 PSIG INDICATOR SWITCH (DCS) DISTRIB UTED C ONTROL
PDT -PRESS. DIFF. TRANSMITTER
VALVE NORMALLY SYSTEM, OPERATOR INACCESSIBLE
2"x1" 3/4" CLOSED
PDTD -PRESS. DIFF. TRANSDUCER IN C ONTROL R OOM
PI PG -PRESSURE GAGE
D 1" XPI - SCRAPER PASSAGE PI -PRESSURE INDICATOR (DCS) DISTRIB UTED C ONTROL
1026 INDICATOR PIC -PRESS. IND ICATOR CONTROLLER
SYSTEM, OPERATOR INACCESSIBLE
2"x3/4" PR -PRESSURE REC ORDER
IN FIELD

AG UG PS -PRESSURE SW ITCH
INSULATING PT -PRESSURE TRANSMITTER DISTRIBUTED CONTROL
2" GASKET PX -PRESSURE POINT INTERCONNECTING LOGIC
8"-D-0098-15LE1W01 8" EVAPORATION PY -PRESS. COMPUTATION MOD. CONTROLLER WITH BINARY
POND PZV -PRESSURE RELIEF VALVE OR SEQUENTIAL FUNCTIONS
DRAIN LINE
SLOPE RTD -RESIST. TEMP. DETECTOR
(PLC) PROGRAM MABLE L OGIC
SI -SPEED INDICATOR
CONTROLL ER, N ORMAL LY
4" SS -SPEED SWITCH INACCESSIBLE OR BEHIND THE
15LE1W01 1LE1W01 TC -TEMP. CONTROLLER PANEL DEVICE OR FUNCTIONS
TV -TEMP. CONTROL VALVE (PLC) PROGRAM MABLE L OGIC
2" SWAGE TCV -TEMP. CONTROL VALVE CONTROLL ER FUN CTION,
NIPPLE (SELF-ACTUATED) CAN BE NOR MALLY
TE -TEMP. ELEMENT DISPLA YED ON CR T
TSO -TIGHT SHUT OFF TG -THERMOMETER LOCAL D CS OR AUX ILIARY
S.C. - SAMPLE CONN. THS -TEMP. HAND SWITCH DCS LOCATION N ORMAL LY
TI -TEMP. INDICATOR ACCE SSIBLE TO OPER ATOR
S -DRAIN TO
PRESSURE SEWER TR -TEMP. RECORDER
(PLC) PROGRAM MABLE L OGIC
TS -TEMP. SWITCH
OWS -OILY WATER SEWER CONTROLL ER I/O POIN T
TT -TEMP. TRANSMITTER NORMALLY INACCESSIBLE
D -DRAIN TTD -TEMP. TRANSDUCER BY OPERATOR
V -VENT TW -THERMOWELL

REFERENCE DRAWINGS
LETTER IDENTIFICATION OF LINES AB-036204
PIPING SYMBOLS AB-036227
EQUIPMENT SYMBOLS AB-036305
INSTRUMENT SYMBOLS AC-036950
PIPING LAYOUT INDEX
PLOT PLAN

ISSUED FOR CONSTRUCTION


PROCESS FLOW DIAGRAM CA-902116.001
HYDROSTATIC TEST DIAGRAM
DRAWING CONTROL FOR J.O. BI-10-09561-0002 CD-901976
INSTRUMENT INSTALLATION SCHEDULES
10-May-2023

TO DS-03 WATER
INJECTION HEADER
8" 8"-W -0537-15LE1W01
CA-901998 SHT.001

REVISION VALIDATION
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MSS MAM ORJ MSK
08/20/21 08/20/21 08/20/21 08/20/21

REV.NO. DATE REVISION DESCRIPTION


00 08/20/21 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
PIPING & INSTRUMENTATION DIAGRAM PID
WATER INJECTION FLANK WI-2
SOUTH BERRI WELL SITES FACILITIES
JUBAIL SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-902089 001 00


Saudi Aramco 5994 ENG. (04/19)

SMART CADD-07
NOTES:

1. ALL INSTRUMENT TAGS SHALL BE PREFIXED


WITH PLANT NUMBER "605".
2. LOCATE SCRAPER PASSAGE INDICATOR MINIMUM ONE SCRAPER
LENGTH FROM BARRED TEE.
3. ALL BURIED PIPELINE SHALL HAVE CATHODIC PROTECTION
605-L-0002 PER SAES-X-400 AND SAES-X-600 AS APPROPRIATE.
4. ALL XPI SHALL BE SUITABLE FOR BIDIRECTIONAL SCRAPING
SCRAPER LAUNCHER AND REMOVAL UNDER PRESSURE.
MAOP = 3600 PSIG 5. SACRIFICIAL ANODES FOR CATHODIC PROTECTION ARE PROVIDED
DESIGN TEMP =170 °F ON THRUST ANCHORS PER STD DWG. AA-036069.
ASME CLASS = 1500 # 6. DELETED.
DESIGN CODE = ASME B31.4 7. FOR MOV TYPICAL DETAIL, SEE DETAIL-B IN CA-902080
TRIM = C.S. (INTERNALLY FBE COATED) 8. INSTRUMENT TAG NUMBERS SHALL BE PREFIXED
SIZE =8"X10" WITH DRILLSITE NUMBERS.
OPERATING PRESSURE: 1100 PSIG 9. FOR PI/PDI/PIT INSTALLATION DETAILS. REFER TO
OPERATING TEMPERATURE: 70 °F P&ID CA-902080.001 DETAIL-C.
10. LINE NUMBERS SHOWN HERE ARE PREFIXED
WITH "606-003"

1LE1W01 15LE1W01 1" V

2"x1"
2" 2"

1" V
3/4"x1"
LEGEND
SET @ 3300.0 PSIG 2"x1" PIPING MATERIAL INSTRUMENT DEFINITION & SYMBOLS SAES-J-003
2" 2" 2" SPECIFICATION SAES-L-105
1"-RL-0285-1SY0W01 PZV 2"-W -0288-15LE1W01 AC/AFO -AIR TO CLOSE/ VE -VIBRATION ELEMENT
+ AIR FAILURE OPEN VS -VIBRATION SWITCH
1003 2" EQUALIZING LINE AC/AFS -AIR TO CLOSE/AIR VT
1" V CSO PROCESS LINE
FAILURE STEADY XL
-VIBRATION TRANSMITTER
-PILOT LIGHT
CSO 2"x1" V

2"-VG-0286-15LE1W01
INSTRUMENT AO/AFC -AIR TO OPEN/ (NOT FOR MOTOR)

2"-W -0287-15LE1W01
3/4"-VG -0284-15SY0W01
AIR LINE AIR FAILURE CLOSE XS -LIMIT SWITCH
1" 1" D 2" 2" NOTE-4 AO/AFS -AIR TO OPEN/AIR ZV

1SY0W01
-SAFETY SHUTDOWN VALVE

1LE1W01
INSTRUMENT
FAILURE STEADY
ELECTRICAL LINE DATA LOGGER POINT
AOV -AIR OPERATED VALVE
F-FLOW P-PRESS.

INPUTS
3/4" 0 - 4000 PSIG XPI AT -ANALYZER TRANSMITTER
L-LEVEL T-TEMP.
2" DT -DENSITY TRANSMITTER

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
1035 REDUCER ESD -EMER. SHUTDOWN SYSTEM
X-MISC. A-ALARM
V 2" PI LOCAL PANEL
0 - 4000 PSIG INT.FBE COATED INT.PE-RT LINED WIP SPECTACLE
FC - FLOW CONTROLLER
MOUNTED INSTR.
PURGE MOV TYPICAL 1019 FENCE FV -FLOW CONTROL VALVE
2"x3/4" 3/4" CARBON STEEL CARBON STEEL PLATE-OPEN FCV -FLOW CONTROL VALVE
3/4" PI CONN DETAIL 2"x3/4" BOARD MOUNTED
1" CSO 3/4" SPECTACLE
(SELF-ACTUATED) INSTRUMENT
1018 XPI NOTE-7 FE -FLOW ELEMENT
2" PLATE-CLOSED FG -FLOW SIGHT GLASS
R /G
1034 2" 2"x3/4" GATE VALVE FHV -FLOW MANUAL CONT. VALVE XL
STATU S LIGH TS
MOV
+
NOTE-2 THRUST FHTD -FLOW MANUAL TRANSDUCER
R =RED , G=GR EEN
PILOT LIGH T (D O NOT
2" 2" 2"
M 1005 ANCHOR GLOBE VALVE FIC -FLOW IND ICATOR C ONTROLLER U SE FOR MOTOR STATU S)
CSO 2" FM -FLOW METER
BAND TYPE END 605-L-0002 2" TO DS-03 CHECK VALVE
2" NOTE-3 8" WATER INJECTION FLANK WI-2 FO -RESTRICTION ORIFICE MOTOR STATUS
CLOSURE CA-902089 SHT.001 PLUG VALVE FQI -FLOW TOTALIZER IND ICA TOR
PILOT LIGH T
SCRAPER LAUNCHER
2" 8" BARRED TEE ( INT.PE-RT LINED C.S ) BALL VALVE
FR -FLOW RECORDER
LOCAL MOUNTED
3" SC CL1500 FT -FLOW TRANSMITTER
ML
INSTRUMENT
2" 1" 2" FB DOUBLE DISC FY -FLOW RELAY
NOTE-5 GATE VALVE HIC -HAND INDIC ATOR CONTROLLER
MOUNTED BEHIND
ANGLE VALVE HS -HAND SWITCH LOCAL PANEL
LA -LEVEL ALARM
AG UG -LEVEL CONTROL VALVE
LV R AC K MOU NTED
MIN. PRESS. RELIEF VALVE LCV -LEVEL CONTROL VALVE (OR BACK OF PANEL)
(SELF-ACTUATED)
LG -LEVEL GAUGE GLASS ELECTRICAL
LIC -LEVEL IND ICATOR C ONTROLLER SUPPLY REQUIRED
VACUUM RELIEF VALVE -LEVEL INDICATOR
LI
LR -LEVEL RECORDER INSTRUMENT
LS -LEVEL SWITCH AIR SUPPLY REQUIRED
MOV TYPICAL M MOTOR OPERATED
-LEVEL TRANSMITTER
VALVE LT
DETAIL LTD -LEVEL TRANSDUCER
H
H IGH LOW
2"-VG-0279-1LE1W01

NOTE-7
3/4" 2"x3/4" 2"
2"-D-0280-15LE1W01

ML -MOTOR STATUS LIGHT L


2" 3" P MOV -MOTOR OPERATED VALVE
PISTON OPERATED
MOV VALVE
NA -ANNUNCIATOR TWO PEN R EC ORD ER
+ PB -PUSHBUTTON
1007 PC -PRESSURE CONTROLLER FF
CONTROL VALVE PV -PRESS. CONTROL VALVE FOU ND ATION
FIELD BU S IN STRU MEN T
0-30 PSI PDI 8"
PCV -PRESS. CONTROL VALVE
(SELF ACTUATED)
2" CL1500

M
BALL TYPE DISTRIBUTED CONTROL/SHARED
0 - 4000 PSIG 1021 P PDC -PRESS. DIFF. CONTROLLER
CONTROL VALVE PDI -PRESS. DIFF. INDICATOR DISPLAY SYMBOLS
WITH POSITIONER PDIC -PRESSURE DIFFERENTIAL
PI S INDICATOR CONTROLLER
(DCS) DISTRIB UTED C ONTROL
SYSTEM, OPERATOR ACCESSIBLE
1030 SOLENOID VALVE PDIS -PRESSURE DIFFERENTIAL IN C ONTROL R OOM
INDICATOR SWITCH (DCS) DISTRIB UTED C ONTROL
PDT -PRESS. DIFF. TRANSMITTER
VALVE NORMALLY SYSTEM, OPERATOR INACCESSIBLE
3/4" 2"x3/4" 2" CLOSED
PDTD -PRESS. DIFF. TRANSDUCER IN C ONTROL R OOM
PG -PRESSURE GAGE
3/4" XPI - SCRAPER PASSAGE PI -PRESSURE INDICATOR (DCS) DISTRIB UTED C ONTROL
INDICATOR PIC -PRESS. IND ICATOR CONTROLLER
SYSTEM, OPERATOR INACCESSIBLE
IN FIELD
2"x3/4" PR -PRESSURE REC ORDER
PS -PRESSURE SW ITCH
INSULATING PT -PRESSURE TRANSMITTER DISTRIBUTED CONTROL
0 - 4000 PSIG MIN GASKET PX -PRESSURE POINT INTERCONNECTING LOGIC
2" 3"
3"-W -0281-15LE1W01 PY -PRESS. COMPUTATION MOD. CONTROLLER WITH BINARY
PI PZV -PRESSURE RELIEF VALVE OR SEQUENTIAL FUNCTIONS
KICKER LINE RTD -RESIST. TEMP. DETECTOR
1017 (PLC) PROGRAM MABLE L OGIC
2" SI -SPEED INDICATOR
CONTROLL ER, N ORMAL LY
SS -SPEED SWITCH INACCESSIBLE OR BEHIND THE
2"x1" TC -TEMP. CONTROLLER PANEL DEVICE OR FUNCTIONS
3/4" TV -TEMP. CONTROL VALVE (PLC) PROGRAM MABLE L OGIC
1" D SWAGE TCV -TEMP. CONTROL VALVE CONTROLL ER FUN CTION,

2"x3/4" NIPPLE (SELF-ACTUATED) CAN BE NOR MALLY


TE -TEMP. ELEMENT DISPLA YED ON CR T
TSO -TIGHT SHUT OFF TG -THERMOMETER LOCAL D CS OR AUX ILIARY
S.C. - SAMPLE CONN.
2" 2" 2"-D-0282-15LE1W01
THS -TEMP. HAND SWITCH DCS LOCATION N ORMAL LY
ACCE SSIBLE TO OPER ATOR
TI -TEMP. INDICATOR
S -DRAIN TO
TR -TEMP. RECORDER
2" PRESSURE SEWER
TS -TEMP. SWITCH
(PLC) PROGRAM MABLE L OGIC
DRAIN LINE OWS -OILY WATER SEWER CONTROLL ER I/O POIN T
TT -TEMP. TRANSMITTER NORMALLY INACCESSIBLE
D
1LE1W01 15LE1W01 -DRAIN TTD -TEMP. TRANSDUCER BY OPERATOR
2" V -VENT TW -THERMOWELL

REFERENCE DRAWINGS
LETTER IDENTIFICATION OF LINES AB-036204
PIPING SYMBOLS AB-036227

TO GRAVITY EQUIPMENT SYMBOLS AB-036305


SEWER TO GRAVITY INSTRUMENT SYMBOLS AC-036950
SEWER 10-09561-0002 PIPING LAYOUT INDEX
BI-10-09561 (PLANT-605) 605 160 PLOT PLAN

ISSUED FOR CONSTRUCTION


BI-10-00622 (PLANT-607) PROCESS FLOW DIAGRAM CA-902116.001
HYDROSTATIC TEST DIAGRAM
DRAWING CONTROL FOR J.O. BI-10-09561-0002 CD-901976
INSTRUMENT INSTALLATION SCHEDULES
FROM WIP WATER 10-May-2023
INJECTION MANIFOLD
8"-W -0283-15LE1W01
CA-673305 SHT.002
PLANT 607

REVISION VALIDATION
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MSS MAM ORJ MSK
08/20/21 08/20/21 08/20/21 08/20/21

REV.NO. DATE REVISION DESCRIPTION


00 08/20/21 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
PIPING & INSTRUMENTATION DIAGRAM PID
WATER INJECTION FLANK WI-2
SOUTH BERRI WELL SITES FACILITIES
JUBAIL SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-902088 001 00


Saudi Aramco 5994 ENG. (04/19)

SMART CADD-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
1. FOR GENERAL INSTRUCTIONS ON TESTING REFER TO
SAUDI ARAMCO ENGINEERING STANDARDS SAES-L-150,
SAES-A-004, SAES-A-007 AND GI.2.102.

2.ALL TEMPORARY FITTINGS, VENT VALVES, BLINDS,


BLIND FLANGES, GASKETS & PLUGS MARKED WITH
ASTERISK (*) SHALL BE REMOVED AFTER
HYDROSTATIC TESTING AND REPLACED WITH
PERMANENTLY ALLOCATED MATERIALS. TEMPORARY
FITTINGS SHALL BE REMOVED AFTER HYDROTEST.

3.WATER SHALL BE DRAINED FROM THE POINTS AS


INSTRUCTED BY SAUDI ARAMCO FIELD
REPRESENTATIVE.

4.ALL IN-LINE VALVES NOT USED AS TEST ISOLATION


1LE1W01 15LE1W01 1" V
VALVE SHALL BE IN A PARTIALLY OPEN POSITION.
#5
2"x1"
5.ALL PERMANENT THREADED CONNECTIONS SHALL
2" 2" BE SEAL WELDED PRIOR TO HYDROTEST.

6.REMOVE DISCS & FLAPPERS FROM THE CHECK

#7 #5 VALVE AND REMOVE ORIFICE PLATE BEFORE

V HYDROTEST.
1"-RL-0285-1SY0W01 1"
PZV
#5
1003 2"x1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
FB18 G18
2" 2" 2" & BODY TESTED AS PER SAEL-L-108 PAR.4.7.
2"-W-0288-15LE1W01
#7
V ¾"x1" 2" EQUALIZING LINE
¾" CSO 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
*
#7 1" 2"x1" 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.

2"-W-0287-15LE1W01
1SY0W01
1LE1W01

2"-VG-0286-15LE1W01
CSO #5 1" D V 2" 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE

*
¾" TURNED TO ITS OPEN POSITION AFTER TESTING.
#5
(TYP.)
V #6 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
#6 #5 PRESSURE INDICATED IN THE DRAWING.
XPI PL02
G17 2" #5
¾"-VG-0284-15SY0W01 1035
PURGE 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
#4 2" PI
FB17 CONN * INT.FBE COATED INT.PE-RT LINED WIP DS-03 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
1019
¾" ¾" CARBON STEEL CARBON STEEL FENCE FENCE
PI ¾"
CSO 1" #4 12.COMPONENTS WHICH INTERFERE WITH FILLING
1018 XPI
2"x¾" * FB05 FLUSHING, VENTING AND DRAINING SHALL NOT
#6 #5 1034 2"x¾" *
#4 BE INSTALLED WITH LINE FILLING AND PRESSURE
#5 MOV THRUST THRUST
2" #5 2" +
#4

*
1005 #4 #3 ANCHOR TESTING.
2" M
ANCHOR
CSO

*
END 2" 2" TO DS-03
607-L-0002 * 8" WATER INJECTION FLANK WI-2
CLOSURE CA-903039.001
2" 8"-1500# BARRED ( INT.PE-RT LINED C.S )
2" 3"
*

*
(TYP.) 1" SC FB TEE
2" #5A 2"
#4A #4A
FB04 G04
MIN. AG UG LEGEND
FB06 G06

D DRAIN
2"-VG-0279-1LE1W01

2"-D-0280-15LE1W01

V VENT
#4

*
#1 TEST LIMIT
2" 3" ¾" 2"x¾"
MOV
+
* TEMPORARY BLIND
1007

*
PDI TEMPORARY PLUG

M
1021
2"

8"-1500 SPECTACLE PLAT OPEN POSITION

PI
¾" SPECTACLE PLAT CLOSED POSITION
1030

*
* 2"x¾"
#4
¾"
#5A #5A #4

2"x¾" MIN
3"
3"-W-0281-15LE1W01

KICKER LINE
2"
PI REFERENCE DRAWINGS
1017 2"x1" DWG. CONTROL FOR JO-10-09561-0001 CD-901976
* #5A 1" D PIPING & INSTRUMENT DIAGRAM CA-902088.001
#4A ¾" PIPING & INSTRUMENT DIAGRAM CA-902089.001
FB23 G23 #7 #7 #4A
2"x¾" MATERIAL TAKE-OFF T/O-952850-001
2"
* * 2"-D-0282-15LE1W01
2"
DRAIN LINE

1LE1W01 15LE1W01
2"
#4A
#4
*

TO GRAVITY
SEWER TO GRAVITY
SEWER #4 BI-10-09561 (PLANT-605)
*

BI-10-00622 (PLANT-607) 10-09561-0002

605 160
FROM WIP WATER
INJECTION MANIFOLD
PLANT 607

ISSUED FOR CONSTRUCTION


8"-W-0283-15LE1W01
CA-XXXXXX.001

14-May-2023

SCALE:

REVISION VALIDATION

THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001
H Y D R O S T A T I C T E S T S C H E D U L E
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
STRENGTH TEST TIGHTNESS TEST (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST NO. LIMITED BY ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION HBZ MAB ORJ MSK
05/08/22 05/08/22 05/08/22 05/08/22

#4A, #4, REV.NO. DATE REVISION DESCRIPTION


INTERNAL FBE COATING 5575 PSIG 38439 KPaG 5854 PSIG 40362 KPaG 2 HRS 5296 PSIG 36515 KPaG 5561 PSIG 38342 KPaG
#5A, #5. * 0F2 05/08/22 ISSUED FOR CONSTRUCTION
PER 09-SAMSS-091
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
#3 & #6 A105N/A182 GR. F53 5625 PSIG 38783 KPaG 7031 PSIG 48477 KPaG 2 HRS 5344 PSIG 36846 KPaG 5611 PSIG 38686 KPaG 0F2 10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
*
ASME CL-1500 FLANGES
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
A105N/A182 GR. F53
#7 HYDROSTATIC TEST DIAGRAM
ASME CL-150 FLANGES
450 PSIG 3103 KPaG 473 PSIG 3261 KPaG 2 HRS 428 PSIG 2951 KPaG 449 PSIG 3096 KPaG * HYD

WI-2 SCRAPER LAUNCHER @ SBWIP


* TIGHTNESS TEST PRESSURE SHALL BE MAINTAINED LONG ENOUGH FOR THE INSPECTOR TO EXAMINE ALL EXPOSED JOINTS.
SOUTH BERRI WELL SITES FACILITIES

JUBAIL SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-952850 001 0F2


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05

You might also like