THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.

NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:

1. FOR GENERAL INSTRUCTIONS ON TESTING REFER TO


SAUDI ARAMCO ENGINEERING STANDARDS SAES-L-150,
SAES-A-004, SAES-A-007 AND GI.2.102.

2.ALL TEMPORARY FITTINGS, VENT VALVES, BLINDS,


BLIND FLANGES, GASKETS & PLUGS MARKED WITH
ASTERISK (*) SHALL BE REMOVED AFTER
HYDROSTATIC TESTING AND REPLACED WITH
PERMANENTLY ALLOCATED MATERIALS. TEMPORARY
FITTINGS SHALL BE REMOVED AFTER HYDROTEST.

3.WATER SHALL BE DRAINED FROM THE POINTS AS


INSTRUCTED BY SAUDI ARAMCO FIELD
REPRESENTATIVE.

4.ALL IN-LINE VALVES NOT USED AS TEST ISOLATION


1LE1W01 15LE1W01 1" V
VALVE SHALL BE IN A PARTIALLY OPEN POSITION.
#5
2"x1"
5.ALL PERMANENT THREADED CONNECTIONS SHALL
2" 2" BE SEAL WELDED PRIOR TO HYDROTEST.

6.REMOVE DISCS & FLAPPERS FROM THE CHECK

#7 #5 VALVE AND REMOVE ORIFICE PLATE BEFORE

V HYDROTEST.
1"-RL-0285-1SY0W01 1"
PZV
#5
1003 2"x1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
FB18 G18
2"

#7
¾"x1"
2"
2"-W-0288-15LE1W01
2"
Flank-2 water injection line 8" PMCC & BODY TESTED AS PER SAEL-L-108 PAR.4.7.

V ¾" 2" EQUALIZING LINE 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
CSO
*
#7 1" 2"x1" 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.

2"-W-0287-15LE1W01
1SY0W01
1LE1W01

2"-VG-0286-15LE1W01
CSO #5 1" D V 2" 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE

*
¾" TURNED TO ITS OPEN POSITION AFTER TESTING.
#5
(TYP.)
V #6 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
#6 #5 PRESSURE INDICATED IN THE DRAWING.
XPI PL02
G17 2" #5
¾"-VG-0284-15SY0W01 1035
PURGE 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
#4 2" PI
FB17 CONN * INT.FBE COATED INT.PE-RT LINED WIP DS-03 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
1019
¾" ¾" CARBON STEEL CARBON STEEL FENCE FENCE
PI ¾"
CSO 1" #4 12.COMPONENTS WHICH INTERFERE WITH FILLING
1018 XPI
2"x¾" * FB05 FLUSHING, VENTING AND DRAINING SHALL NOT
#6 #5 1034 2"x¾" *
#4 BE INSTALLED WITH LINE FILLING AND PRESSURE
#5 MOV THRUST THRUST
2" #5 2" +
#4

*
1005 #4 #3 ANCHOR TESTING.
2" M
ANCHOR
CSO

*
END 2" 2" TO DS-03
607-L-0002 * 8" WATER INJECTION FLANK WI-2
CLOSURE CA-903039.001
2" 8"-1500# BARRED ( INT.PE-RT LINED C.S )
2" 3"
*

*
(TYP.) 1" SC FB TEE
2" #5A
#4A #4A
2"
PMCC Limits
FB04 G04
MIN. AG UG LEGEND
FB06 G06

D DRAIN
2"-VG-0279-1LE1W01

2"-D-0280-15LE1W01

V VENT
#4

*
#1 TEST LIMIT
2" 3" ¾" 2"x¾"
MOV
+
* TEMPORARY BLIND
1007

*
PDI TEMPORARY PLUG

M
1021
2"

8"-1500 SPECTACLE PLAT OPEN POSITION

PI
¾" SPECTACLE PLAT CLOSED POSITION
1030

*
* 2"x¾"
#4
¾"
#5A #5A #4

2"x¾" MIN
3"
3"-W-0281-15LE1W01

KICKER LINE
2"
PI REFERENCE DRAWINGS
1017 2"x1" DWG. CONTROL FOR JO-10-09561-0001 CD-901976
* #5A 1" D PIPING & INSTRUMENT DIAGRAM CA-902088.001
#4A ¾" PIPING & INSTRUMENT DIAGRAM CA-902089.001
FB23 G23 #7 #7 #4A
2"x¾" MATERIAL TAKE-OFF T/O-952850-001
2"
* * 2"-D-0282-15LE1W01
2"
DRAIN LINE

1LE1W01 15LE1W01
2"
#4A
#4
*

TO GRAVITY
SEWER TO GRAVITY
SEWER #4 BI-10-09561 (PLANT-605)
*

BI-10-00622 (PLANT-607) 10-09561-0002

605 160
FROM WIP WATER
INJECTION MANIFOLD
PLANT 607

ISSUED FOR CONSTRUCTION


8"-W-0283-15LE1W01
CA-XXXXXX.001

14-May-2023

PMCC-2 LIMITS WI-2


SCALE:

REVISION VALIDATION

THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001
H Y D R O S T A T I C T E S T S C H E D U L E
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
STRENGTH TEST TIGHTNESS TEST (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST NO. LIMITED BY ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION HBZ MAB ORJ MSK
05/08/22 05/08/22 05/08/22 05/08/22

#4A, #4, REV.NO. DATE REVISION DESCRIPTION


INTERNAL FBE COATING 5575 PSIG 38439 KPaG 5854 PSIG 40362 KPaG 2 HRS 5296 PSIG 36515 KPaG 5561 PSIG 38342 KPaG
#5A, #5. * 0F2 05/08/22 ISSUED FOR CONSTRUCTION
PER 09-SAMSS-091
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
#3 & #6 A105N/A182 GR. F53 5625 PSIG 38783 KPaG 7031 PSIG 48477 KPaG 2 HRS 5344 PSIG 36846 KPaG 5611 PSIG 38686 KPaG 0F2 10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
*
ASME CL-1500 FLANGES
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
A105N/A182 GR. F53
#7 HYDROSTATIC TEST DIAGRAM
ASME CL-150 FLANGES
450 PSIG 3103 KPaG 473 PSIG 3261 KPaG 2 HRS 428 PSIG 2951 KPaG 449 PSIG 3096 KPaG * HYD

WI-2 SCRAPER LAUNCHER @ SBWIP


* TIGHTNESS TEST PRESSURE SHALL BE MAINTAINED LONG ENOUGH FOR THE INSPECTOR TO EXAMINE ALL EXPOSED JOINTS.
SOUTH BERRI WELL SITES FACILITIES

JUBAIL SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-952850 001 0F2


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05


NOTES:

1. ALL INSTRUMENT TAGS SHALL HAVE "605".PREFIX


UNLESS OTHERWISE NOTED.
2. LOCATE SCRAPER PASSAGE INDICATOR MINIMUM
ONE MAXIMUM SCRAPER LENGTH FROM BARRED TEE.
3. ALL BURIED PIPELINE SHALL HAVE CATHODIC
605-003-L-0003 PROTECTION PER SAUDI ARAMCO STANDARD
SAES-X-400 AND SAES-X-600 AS APPROPRIATE.
SCRAPER RECEIVER 4. ALL XPI SHALL BE SUITABLE FOR BIDIRECTIONAL
MAOP = 3600 PSIG SCRAPING AND REMOVAL UNDER LINE PRESSURE.
DESIGN TEMP =170 °F 5. SACRIFICIAL ANODES FOR CATHODIC PROTECTION
ASME CLASS = 1500 # ARE PROVIDED ON THRUST ANCHORS
DESIGN CODE = ASME B31.4 AS PER STD DWG. AA-036069.
TRIM = C.S. (INTERNALLY FBE COATED) 6. DELETED.
SIZE = 8"X10" 7. FOR MOV TYPICAL DETAIL, SEE DETAIL-B IN CA-902080
OPERATING PRESSURE: 1100 PSIG 8. INSTRUMENT TAG NUMBERS SHALL BE PREFIXED
OPERATING TEMPERATURE: 70 °F WITH DRILLSITE NUMBERS.
15LE1W01 1LE1W01
V 1" 9. FOR PI/PDI/PIT INSTALLATION DETAILS. REFER TO
P&ID CA-902080.001 DETAIL-C.
2"x1" 10. LINE NUMBERS SHOWN HERE ARE PREFIXED
2" 2" WITH (605-003).

2"-VG-0390-15LE1W01
V 1" 3/4"x1"
SET @ 3300.0 PSIG
2"x1" PZV
+

2" 2" 2"-W -0393-15LE1W01 EQUALIZING LINE 2" 1004 1"-RL -0391-1SY0W01

2" CSO 1" V


V 2"x1" 2"x1" CSO

NOTE-4 D 1" 1"


1"

1SY0W01
2"

1LE1W01
2"-W -0394-15LE1W01 1"
XPI 0 - 4000 PSIG LEGEND
2" V
DS-03 1036 PIPING MATERIAL INSTRUMENT DEFINITION & SYMBOLS SAES-J-003
FENCE PI 2" 3/4"-VG-0392-15SY0W01 SPECIFICATION SAES-L-105
MOV TYPICAL 0 - 4000 PSIG AC/AFO -AIR TO CLOSE/ VE -VIBRATION ELEMENT
1024 PURGE AIR FAILURE OPEN VS -VIBRATION SWITCH
3/4" DETAIL CONN 3/4" 2" AC/AFS -AIR TO CLOSE/AIR
INT.PE-RT LINED INT.FBE COATED 2"x3/4" PI PROCESS LINE VT -VIBRATION TRANSMITTER

CARBON STEEL CARBON STEEL 3/4" NOTE-7 CSO 1" FAILURE STEADY XL -PILOT LIGHT
XPI 1025 INSTRUMENT AO/AFC -AIR TO OPEN/ (NOT FOR MOTOR)
2"x3/4" AIR FAILURE CLOSE
2"x3/4" NOTE-2 2" 1037 AIR LINE XS -LIMIT SWITCH

THRUST PMCC Limit MOV


+

1010 M CSO 2" 2"


INSTRUMENT
ELECTRICAL LINE
AO/AFS -AIR TO OPEN/AIR
FAILURE STEADY
ZV -SAFETY SHUTDOWN VALVE

ANCHOR AOV -AIR OPERATED VALVE DATA LOGGER POINT


2" 2" F-FLOW P-PRESS.
FROM WIP TRAP AREA

INPUTS
8" WATER INJECTION FLANK WI-2 NOTE-3 2" 605-003-L-0003 AT
DT
-ANALYZER TRANSMITTER
-DENSITY TRANSMITTER
L-LEVEL T-TEMP.
BAND TYPE END

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
X-MISC. A-ALARM
CA-902088 SHT.001 SCRAPER RECEIVER REDUCER ESD -EMER. SHUTDOWN SYSTEM
( INT.PE-RT LINED C.S ) BARRED TEE BARRED TEE 8" CLOSURE FC - FLOW CONTROLLER
LOCAL PANEL
CL1500 SPECTACLE FV -FLOW CONTROL VALVE
MOUNTED INSTR.

FB 2" 2" SC 2" PLATE-OPEN FCV -FLOW CONTROL VALVE


NOTE-5 BOARD MOUNTED
(SELF-ACTUATED) INSTRUMENT
SPECTACLE FE -FLOW ELEMENT
PLATE-CLOSED FG -FLOW SIGHT GLASS
R /G
STATU S LIGH TS
GATE VALVE FHV -FLOW MANUAL CONT. VALVE XL
UG AG R =RED , G=GR EEN
MIN. 2" 3"
FHTD -FLOW MANUAL TRANSDUCER PILOT LIGH T (D O NOT
GLOBE VALVE FIC -FLOW IND ICATOR C ONTROLLER U SE FOR MOTOR STATU S)
CHECK VALVE FM -FLOW METER
FO -RESTRICTION ORIFICE MOTOR STATUS
PILOT LIGH T
PLUG VALVE FQI -FLOW TOTALIZER IND ICA TOR
MOV TYPICAL BALL VALVE
FR -FLOW RECORDER
LOCAL MOUNTED
ML
DETAIL FT -FLOW TRANSMITTER INSTRUMENT
DOUBLE DISC FY -FLOW RELAY
NOTE-7 GATE VALVE -HAND INDIC ATOR CONTROLLER
HIC
MOV TYPICAL

2"-VG-0389-1LE1W01
2" 2"x3/4" ANGLE VALVE
MOUNTED BEHIND

DETAIL MOV 3/4" HS -HAND SWITCH LOCAL PANEL

2"-D-0397-15LE1W01

2"-D-0395-15LE1W01
+
LA -LEVEL ALARM
NOTE-7 1008 LV -LEVEL CONTROL VALVE R AC K MOU NTED
PRESS. RELIEF VALVE LCV -LEVEL CONTROL VALVE (OR BACK OF PANEL)
(SELF-ACTUATED)
MOV + LG -LEVEL GAUGE GLASS ELECTRICAL
1020
PDI 0-30 PSI -LEVEL IND ICATOR C ONTROLLER SUPPLY REQUIRED
8" VACUUM RELIEF VALVE LIC
-LEVEL INDICATOR
LI
CL1500 2"

M
8" 1023 0 - 4000 PSIG -LEVEL RECORDER INSTRUMENT

M
LR
M LS -LEVEL SWITCH AIR SUPPLY REQUIRED
MOTOR OPERATED
PI LT -LEVEL TRANSMITTER
VALVE H
1031 LTD -LEVEL TRANSDUCER H IGH LOW
ML -MOTOR STATUS LIGHT L
P MOV -MOTOR OPERATED VALVE
PISTON OPERATED NA -ANNUNCIATOR TWO PEN R EC ORD ER
VALVE PB -PUSHBUTTON
2" 2"x3/4" 3/4" 3/4" PC -PRESSURE CONTROLLER FF
CONTROL VALVE PV -PRESS. CONTROL VALVE FOU ND ATION
PCV -PRESS. CONTROL VALVE FIELD BU S IN STRU MEN T
2"x3/4" (SELF ACTUATED)
P
BALL TYPE PDC -PRESS. DIFF. CONTROLLER DISTRIBUTED CONTROL/SHARED
CONTROL VALVE PDI -PRESS. DIFF. INDICATOR DISPLAY SYMBOLS
MIN 2" WITH POSITIONER PDIC -PRESSURE DIFFERENTIAL
3" 3"-W -0396-15LE1W01 KICKER LINE INDICATOR CONTROLLER
(DCS) DISTRIB UTED C ONTROL
S SYSTEM, OPERATOR ACCESSIBLE
SOLENOID VALVE PDIS -PRESSURE DIFFERENTIAL IN C ONTROL R OOM
2" 0 - 4000 PSIG INDICATOR SWITCH (DCS) DISTRIB UTED C ONTROL
PDT -PRESS. DIFF. TRANSMITTER
VALVE NORMALLY SYSTEM, OPERATOR INACCESSIBLE
2"x1" 3/4" CLOSED
PDTD -PRESS. DIFF. TRANSDUCER IN C ONTROL R OOM
PI PG -PRESSURE GAGE
D 1" XPI - SCRAPER PASSAGE PI -PRESSURE INDICATOR (DCS) DISTRIB UTED C ONTROL
1026 INDICATOR PIC -PRESS. IND ICATOR CONTROLLER
SYSTEM, OPERATOR INACCESSIBLE
2"x3/4" PR -PRESSURE REC ORDER
IN FIELD

AG UG PS -PRESSURE SW ITCH
INSULATING PT -PRESSURE TRANSMITTER DISTRIBUTED CONTROL
2" GASKET PX -PRESSURE POINT INTERCONNECTING LOGIC
8"-D-0098-15LE1W01 8" EVAPORATION PY -PRESS. COMPUTATION MOD. CONTROLLER WITH BINARY
POND PZV -PRESSURE RELIEF VALVE OR SEQUENTIAL FUNCTIONS
DRAIN LINE
SLOPE RTD -RESIST. TEMP. DETECTOR
(PLC) PROGRAM MABLE L OGIC
SI -SPEED INDICATOR
CONTROLL ER, N ORMAL LY
4" SS -SPEED SWITCH INACCESSIBLE OR BEHIND THE
15LE1W01 1LE1W01 TC -TEMP. CONTROLLER PANEL DEVICE OR FUNCTIONS
TV -TEMP. CONTROL VALVE (PLC) PROGRAM MABLE L OGIC
2" SWAGE TCV -TEMP. CONTROL VALVE CONTROLL ER FUN CTION,
NIPPLE (SELF-ACTUATED) CAN BE NOR MALLY
TE -TEMP. ELEMENT DISPLA YED ON CR T
TSO -TIGHT SHUT OFF TG -THERMOMETER LOCAL D CS OR AUX ILIARY
S.C. - SAMPLE CONN. THS -TEMP. HAND SWITCH DCS LOCATION N ORMAL LY
TI -TEMP. INDICATOR ACCE SSIBLE TO OPER ATOR
S -DRAIN TO
PRESSURE SEWER TR -TEMP. RECORDER
(PLC) PROGRAM MABLE L OGIC
TS -TEMP. SWITCH
OWS -OILY WATER SEWER CONTROLL ER I/O POIN T
TT -TEMP. TRANSMITTER NORMALLY INACCESSIBLE
D -DRAIN TTD -TEMP. TRANSDUCER BY OPERATOR
V -VENT TW -THERMOWELL

REFERENCE DRAWINGS
LETTER IDENTIFICATION OF LINES AB-036204
PIPING SYMBOLS AB-036227
EQUIPMENT SYMBOLS AB-036305
INSTRUMENT SYMBOLS AC-036950
PIPING LAYOUT INDEX
PLOT PLAN

ISSUED FOR CONSTRUCTION


PROCESS FLOW DIAGRAM CA-902116.001
HYDROSTATIC TEST DIAGRAM
DRAWING CONTROL FOR J.O. BI-10-09561-0002 CD-901976
INSTRUMENT INSTALLATION SCHEDULES
10-May-2023

TO DS-03 WATER
INJECTION HEADER
8" 8"-W -0537-15LE1W01
CA-901998 SHT.001

PMCC Limits
REVISION VALIDATION
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
MSS MAM ORJ MSK
08/20/21 08/20/21 08/20/21 08/20/21

REV.NO. DATE REVISION DESCRIPTION


00 08/20/21 ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
PIPING & INSTRUMENTATION DIAGRAM PID
WATER INJECTION FLANK WI-2
SOUTH BERRI WELL SITES FACILITIES
JUBAIL SAUDI ARABIA
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-902089 001 00


Saudi Aramco 5994 ENG. (04/19)

SMART CADD-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:

1. FOR GENERAL INSTRUCTIONS ON TESTING REFER TO


SAUDI ARAMCO ENGINEERING STANDARDS SAES-L-150,
SAES-A-004, SAES-A-007 AND GI.2.102.

2.ALL TEMPORARY FITTINGS, VENT VALVES, BLINDS,


BLIND FLANGES, GASKETS & PLUGS MARKED WITH
ASTERISK (*) SHALL BE REMOVED AFTER
HYDROSTATIC TESTING AND REPLACED WITH
PERMANENTLY ALLOCATED MATERIALS. TEMPORARY
FITTINGS SHALL BE REMOVED AFTER HYDROTEST.

3.WATER SHALL BE DRAINED FROM THE POINTS AS


INSTRUCTED BY SAUDI ARAMCO FIELD
REPRESENTATIVE.

4.ALL IN-LINE VALVES NOT USED AS TEST ISOLATION


1LE1W01 15LE1W01 1" V
VALVE SHALL BE IN A PARTIALLY OPEN POSITION.
#5
2"x1"
5.ALL PERMANENT THREADED CONNECTIONS SHALL
2" 2" BE SEAL WELDED PRIOR TO HYDROTEST.

6.REMOVE DISCS & FLAPPERS FROM THE CHECK

#7 #5 VALVE AND REMOVE ORIFICE PLATE BEFORE

V HYDROTEST.
1"-RL-0285-1SY0W01 1"
PZV
#5
1003 2"x1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
FB18 G18
2" 2" 2" & BODY TESTED AS PER SAEL-L-108 PAR.4.7.
2"-W-0288-15LE1W01
#7
V ¾"x1" 2" EQUALIZING LINE
¾" CSO 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
*
#7 1" 2"x1" 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.

2"-W-0287-15LE1W01
1SY0W01
1LE1W01

2"-VG-0286-15LE1W01
CSO #5 1" D V 2" 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE

*
¾" TURNED TO ITS OPEN POSITION AFTER TESTING.
#5
(TYP.)
V #6 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
#6 #5 PRESSURE INDICATED IN THE DRAWING.
XPI PL02
G17 2" #5
¾"-VG-0284-15SY0W01 1035
PURGE 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
#4 2" PI
FB17 CONN * INT.FBE COATED INT.PE-RT LINED WIP DS-03 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
1019
¾" ¾" CARBON STEEL CARBON STEEL FENCE FENCE
PI ¾"
CSO 1" #4 12.COMPONENTS WHICH INTERFERE WITH FILLING
1018 XPI
2"x¾" * FB05 FLUSHING, VENTING AND DRAINING SHALL NOT
#6 #5 1034 2"x¾" *
#4 BE INSTALLED WITH LINE FILLING AND PRESSURE
#5 MOV THRUST THRUST
2" #5 2" +
#4

*
1005 #4 #3 ANCHOR TESTING.
2" M
ANCHOR
CSO

*
END 2" 2" TO DS-03
607-L-0002 * 8" WATER INJECTION FLANK WI-2
CLOSURE CA-903039.001
8"-1500# ( INT.PE-RT LINED C.S )
2" 3" 2" BARRED
PMCC Limits
*

*
(TYP.) 1" SC FB TEE
2" #5A 2"
#4A #4A
FB04 G04
MIN. AG UG LEGEND
FB06 G06

D DRAIN
2"-VG-0279-1LE1W01

2"-D-0280-15LE1W01

V VENT
#4

*
#1 TEST LIMIT
2" 3" ¾" 2"x¾"
MOV
+
* TEMPORARY BLIND
1007

*
PDI TEMPORARY PLUG

M
1021
2"

8"-1500 SPECTACLE PLAT OPEN POSITION

PI
¾" SPECTACLE PLAT CLOSED POSITION
1030

*
* 2"x¾"
#4
¾"
#5A #5A #4

2"x¾" MIN
3"
3"-W-0281-15LE1W01

KICKER LINE
2"
PI REFERENCE DRAWINGS
1017 2"x1" DWG. CONTROL FOR JO-10-09561-0001 CD-901976
* #5A 1" D PIPING & INSTRUMENT DIAGRAM CA-902088.001
#4A ¾" PIPING & INSTRUMENT DIAGRAM CA-902089.001
FB23 G23 #7 #7 #4A
2"x¾" MATERIAL TAKE-OFF T/O-952850-001
2"
* * 2"-D-0282-15LE1W01
2"
DRAIN LINE

1LE1W01 15LE1W01
2"
#4A
#4
*

TO GRAVITY
SEWER TO GRAVITY
SEWER #4 BI-10-09561 (PLANT-605)
*

BI-10-00622 (PLANT-607) 10-09561-0002

605 160
FROM WIP WATER
INJECTION MANIFOLD
PLANT 607

ISSUED FOR CONSTRUCTION


8"-W-0283-15LE1W01
CA-XXXXXX.001

14-May-2023

SCALE:

REVISION VALIDATION

THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001
H Y D R O S T A T I C T E S T S C H E D U L E
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
STRENGTH TEST TIGHTNESS TEST (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST NO. LIMITED BY ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION HBZ MAB ORJ MSK
05/08/22 05/08/22 05/08/22 05/08/22

#4A, #4, REV.NO. DATE REVISION DESCRIPTION


INTERNAL FBE COATING 5575 PSIG 38439 KPaG 5854 PSIG 40362 KPaG 2 HRS 5296 PSIG 36515 KPaG 5561 PSIG 38342 KPaG
#5A, #5. * 0F2 05/08/22 ISSUED FOR CONSTRUCTION
PER 09-SAMSS-091
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
#3 & #6 A105N/A182 GR. F53 5625 PSIG 38783 KPaG 7031 PSIG 48477 KPaG 2 HRS 5344 PSIG 36846 KPaG 5611 PSIG 38686 KPaG 0F2 10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
*
ASME CL-1500 FLANGES
SAUDI ARABIAN OIL COMPANY
DRAWING TYPE
A105N/A182 GR. F53
#7 HYDROSTATIC TEST DIAGRAM
ASME CL-150 FLANGES
450 PSIG 3103 KPaG 473 PSIG 3261 KPaG 2 HRS 428 PSIG 2951 KPaG 449 PSIG 3096 KPaG * HYD

WI-2 SCRAPER LAUNCHER @ SBWIP


* TIGHTNESS TEST PRESSURE SHALL BE MAINTAINED LONG ENOUGH FOR THE INSPECTOR TO EXAMINE ALL EXPOSED JOINTS.
SOUTH BERRI WELL SITES FACILITIES

JUBAIL SAUDI ARABIA


PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

605 A CA-952850 001 0F2


Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-05


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
TERRAIN SABKHA STA. 0+075 SANDY

CLASS
1
LOCATION

DESIGN
0.72
FACTOR

PIPE
8" API-5L GR. X60, SMLS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL

PIPE WT &
0.500" WT x 2160m
LENGTH

PRESSURE MAOP = 3600 PSIG

MATC
6

67.538m
SCRAPER LAUNCHER @ SOUTH BERRI WIP HLI
NE S
CONT TA.2
INUAT +000
PI-A FOR DETAILS, SEE PLOT PLAN ION S FOR
STA. 0-159.710 EE S
H.00

S
A
DWG. CA-952848 & PIPING E 35 2

B
START OF WI-2 N 2 977 584.911

K
9 50

H
A
0

A
R
E 359 363.239

E
(SCRAPER RETAINER

A
TRAC
PLAN DWG. CA-952860 FLANGE RF WN

6
K 6

500
BARRED TEE) 8"x8D BEND RING

ROW
MA
RL
#1500, NASI FLANGE RF WN
RO
AD
N 2 977 654.075
LEGEND:

AREA
#1500, NASI
MA

976
MARL RL
RO
ROAD AD
6

E 359 363.237 MARL R


OAD
BREAK FLANGES FOR

Y
6
CONTROL STATION U/G TO A/G PIPELINE TRANSITION

SAND
STA 0-077.375 HDPE LINING (TYP) E 35

S
A
S
BOREHOLE REDUCER
9 50

B
A

2
K
B
0

H
237.681m

K
(THRUST ANCHOR

A
H
(SEE DETAIL-1)
6

180.058m

A
RISER PIPE

A
BENCH MARK FLANGE
1

7
3.

R
A
8 KV ¾" V

E
R

N
A
E

000
A
POWE CENTERLINE) LIGHT POST VALVE
R LI
NE THREAD-O-LET POWER POLE
13.8 KV STA. N 2 977 584.911
POWE 0+61 JUNCTION BOX VERTICAL PIPE BENDS

976
.
306
R LI E 359 352.611
NE STA.
0+76 FIRE HYDRANT BLIND FLANGE, PIPE END
.306 8

MHMANHOLE HORIZONTAL FLANGE


STA 0+0000 13.

2
8 KV
POWE CATCH BASIN KM KILOMETER MARKER
WI-2 START OF SURVEY/ R LI

N
NE CO CLEAN OUT OIL WELL

WIP FENCE CROSSING 13.


8 KV STA.
1 +799

S
A
POWE .959 WATER VALVE WATER WELL

B
STA 0+090.440 CURVE 02 DATA

K
R LI

H
STA.

A
NE 1+784 DROP INLET WATER INJECTION WELL

A
HDPE HDPE
7

{ = .923

R
8

WI-2 PC-01

E
HDPE HDPE

A
SIGN BOARD WM WELL MARKER

STUB-END STUB-END R = 209.966m (210.000m GND) AR


EA
N 2 977 584.911 NT
7

LINER LINER TE
7
ROAD SIGN PALM TREE
EN
OD
T = 179.865m (179.894m GND) BH WO
CURVE 01 DATA E 359 181.553
7

EA
TRAFFIC SIGNAL TREE
STA 0+452.349
DETAIL-1 L = 297.453m (297.501m GND)

Y AR

EA
{ = GUARD POST, POST PLANTERS

Y AR
WI-2 PT-01

SAN D
R = 209.966m (210.000m GND) NTS STA 1+762.319 UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER

SAN D
N 2 977 342.994
7

STA 1+464.818
7

T = 244.722m (244.761m GND) UTILITY METER IRRIGATION PIVOT

7
7
7
WI-2 PT-02
E 358 973.993
8

L = 361.851m (361.909m GND) WI-2 PC-02 WATER TAP (HOSE BIB) GROUNDING BOX
9
N 2 976 164.233
M

7
A

8
GATE GROUNDING ROD
R

N 2 976 342.287
L

000
R

24" PWI FLANK (WI-3) E 359 335.077


O

9
A

GUY WIRE ANODE


D

9
E 359 127.875
9
GUARD RAIL P PUMP
9 1012.469m
8" PWI FLANK (WI-2)

8
0 SANDY AREA

977
1
9 E 35 VEHICLE BARRIER M MOTOR

WI-2 PI-01 9 00 8
8 0 1 X FENCE G GENERATOR
0

4.00m
10
N 2 977 584.911
500

SANDY AREA
8

2
SANDY AREA
SANDY AREA
E 358 936.792 7
MARL ROAD

N
8
7 7 MARL ROAD
977

MARL ROAD
7

8 8

8
8

8
7
9
ABBREVIATIONS:
OAD
MARL R
ROW ROW

8
8 GND GROUND
OAD F/L FLOWLINE (PIPE)
MARL R

15.00m
ROAD
10 8
2

MARL
8 8
7

BOB FL FLOWLINE (GUTTER)


E 35 A/G ABOVE GROUND
8
OAD
MARL R
8 9 9
9 00 SANDY AREA SANDY AREA
N

SANDY AREA

12" PWI FLANK (WI-1)


TOB
MARL
ROAD 8 SANDY AREA 0 WI-2 PI-02 U/G UNDERGROUND FF FINISHED FLOOR
OAD 0
MARL R 1

9 TOB 36" WS HEADER (WS-1) N 2 976 164.512 P/L PIPELINE E ELECTRIC


BOB
MARL ROAD
8
8
10 TC TOP OF CONCRETE/CURB T TELEPHONE

OAT
YAR
D
E 359 155.212
N G
NDO TP TOP OF PIPE S SEWER
ABA

BP BOTTOM OF PIPE W WATER

TW TOP OF WALL SW STORM WATER (MANHOLE)

TS TOP OF STEEL CP CATHODIC PROTECTION


T
4 Mg T
AS ASPHALT PS PIPE SUPPORT

27 T PC POINT OF CURVATURE PT POINT OF TANGENCY


PIPE & MATERIAL DATA

PI POINT OF INTERSECTION AP ANGLE POINT

8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION

X'ING CROSSING INT. INTERNAL

STA STATION EXT. EXTERNAL

FBE FUSION BONDED EPOXY PSIG POUNDS PER SQUARE IN GAUGE


SOUTH BERRI WIP FENCE
SCRAPER BARRED TEE

REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976
PIPELINE ANCHOR

CONSTRUCTION SCOPE OF WORK CE-901977


STA. 0-159.710

PIPELINE ALIGNMENT DWG. INDEX CA-953028

STA. 2+000
STA. 1+000
OPEN CUT

WOODEN TENT AREA 'X'ING

WOODEN TENT AREA 'X'ING


SABKHA AREA END

MARL ROAD 'X'ING

MARL ROAD 'X'ING


ELEV. ELEV.

MARL ROAD 'X'ING

MARL ROAD 'X'ING


(m) (m)
35 35
WI-2/PT-01

WI-2/PC-02

WI-2/PT-02
WI-2 START
OF SURVEY

WI-2/PC-01

30 30
STA 0+455.18

STA 1+464.82

STA 1+762.32
STA 0+844.86

STA 1+088.96
STA 0+093.28
STA 0+091.20

25 25
ELEV. 6.16 m

ELEV. 7.49m
ELEV. 9.10m

ELEV. 8.16m
STA 1+540.25

STA 1+576.41
ELEV. 7.58m
STA 000.00

ELEV. 9.18m
ELEV. 6.43m

ELEV. 6.45m

ELEV. 7.72m

ELEV. 7.88m
PROFILE

STA 1+747.25

STA 1+769.14
20 20

ELEV. 8.14m

ELEV. 8.17m
ISSUED FOR CONSTRUCTION
TOP OF EXISTING GRADE
15 15

0 50 100 150 14-May-2023


200 250

10 10

0 5 10 15 20 25

METERS

5 5
HORIZONTAL SCALE 1 : 2500M

VERTICAL SCALE 1 : 250M

REVISION VALIDATION
0 0
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
0+000 0+500 1+000 1+500 2+000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001

MATERIAL SURVEY NOTES: GENERAL NOTES: CATHODIC PROTECTION NOTES:


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
1. COORDINATES ARE UTM (ZONE 39) INTERNATIONAL 1924 ELLIPSOID, 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH 9. CONTRACTOR TO INSTALL WARNING SIGNS AT ROAD 15. EXCAVATION UNDER THE EXISTING ABOVE GROUND 1. CATHODIC PROTECTION INSTALLATION SHALL BE IN ACCORDANCE WITH (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS CONTRACTOR SHALL ENSURE THAT THE PIPELINES
SAES-L-460. BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL THE FENCED AREA AS PER STD. DWG. AB-036907. 12/27/20 12/27/20 12/27/20 12/27/20
2160m 2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 3 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
27 KG (60 LB) MAGNESIUM ANODE INSTALLED 4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4 4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
Mg REFERENCED THEREIN.
PER DWG. AA-036352 SHT. 001 & 002 DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.

6. GROUND DISTANCE x COMBINED FACTOR = GRID DISTANCE


FOR CONSTRUCTION AND OPERATION.

5. TRENCHLESS CONSTRUCTION SHALL BE PROVIDED IN


CONTRACTOR SHALL LOCATE THE CAMEL CROSSINGS AND
SUBMIT A PROPOSAL FOR SAUDI ARAMCO APPROVAL PRIOR SAUDI ARABIAN OIL COMPANY
TO CONSTRUCTION OF THE CAMEL CROSSINGS.
DRAWING TYPE
ACCORDANCE WITH THE REQUIREMENTS OF SAES-L-470.
7. COMBINED FACTOR = 0.999840439 12. STATIONING IS BASED ON ORIGINAL TOPOGRAPHIC SURVEY. PIPELINE ALIGNMENT 8" WI-2 PRF
6. RIGHT OF WAY (ROW) SHALL BE CONSTRUCTED ALONG CONTRACTOR SHALL AS-BUILT THE STATIONING BASED ON
THE PIPELINE. SAND PILE, ROCK PILE AND OTHER ACTUAL SURVEY DURING CONSTRUCTION.
DEBRIS ALONG THE RIGHT OF WAY SHALL BE FROM STA. 0-159.710 TO STA. 2+000
CLEARED, HAULED AND DISPOSED BY THE 13. UNLESS OTHERWISE NOTED, MINIMUM RADIUS OF HORIZONTAL
& VERTICAL BEND SHALL BE 210.0 METERS & 105.0 METERS
CONSTRUCTION CONTRACTOR.
RESPECTIVELY.
SOUTH BERRI WELL SITES FACILITIES
7. DISTANCES TO POWER POLE STRUCTURES WERE
DETERMINED PER SAES-B-064 PARA. 7.6.
14. ALL EXCAVATION OF EXISTING LINES AND UTILITIES JUBAIL SAUDI ARABIA
CROSSING SHALL BE DONE BY HAND EXCAVATION ONLY.
8. BURIED PIPELINES SHALL BE EXT. FUSION BONDED PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

EPOXY (FBE) COATED AS PER APCS-104B OF SAES-H-002.


PIPELINES SHALL BE INTERNALLY HDPE LINED.
605 A CA-953029 001 00
Saudi Aramco 6285 ENG. (09/03)

RESTRICTED VECTOR CADD-02


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
TERRAIN STA. 2+065 SABKHA STA. 2+310 SANDY

CLASS
1
LOCATION

DESIGN
0.72
FACTOR

PIPE
8" API-5L GR. X60, SMLS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL

PIPE WT &
0.500" WT x 2000m
LENGTH

PRESSURE MAOP = 3600 PSIG

LEGEND:

CONTROL STATION U/G TO A/G PIPELINE TRANSITION

NE

NE
LI

LI
BOREHOLE REDUCER

BENCH MARK FLANGE

POW ER

POW ER
LIGHT POST VALVE

POWER POLE

MATCHLINE STA. 4+000 FOR


JUNCTION BOX VERTICAL PIPE BENDS
MATCHLINE STA. 2+000 FOR

CONTINUATION SEE SH. 003


FIRE HYDRANT BLIND FLANGE, PIPE END
CONTINUATION SEE SH. 001

KV

KV
MHMANHOLE HORIZONTAL FLANGE
SABKHA AREA
CATCH BASIN KM KILOMETER MARKER
MA

8
13.

13.
24" PWI FLANK (WI-3)
TR

RL

CO CLEAN OUT OIL WELL


AC

SANDY AREA
RO
K

SABKHA AREA GOAT YARD


AD

SANDY AREA WATER VALVE WATER WELL

4.00m
SANDY AREA

10 SANDY AREA DROP INLET WATER INJECTION WELL


11
MARL AREA
ROW

10
SIGN BOARD WM WELL MARKER
ROW

9
8

1
1

12
1
SA
SA

ROAD SIGN PALM TREE

13
1

12
11

1
2

13
8
M AR

SANDY AREA

1
1
B

SABKHA AREA

1
K

8
N

1
2
SABKHA AREA 7
K

13
TRAC
DY

SABKHA AREA
H

GOAT YARD

8
1
A

TRAFFIC SIGNAL TREE


8
L RO

10
MA

1
MARL AREA 11
AR

12
A

RL
R
EA

SANDY AREA
EA

SANDY AREA

STA.3+758.598
AD

STA.3+773.598
SANDY AREA GUARD POST, POST PLANTERS
RO

SANDY AREA
AD

UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER

8" PWI FLANK (WI-2) UTILITY METER IRRIGATION PIVOT


2000.00m
TR
AC

WATER TAP (HOSE BIB) GROUNDING BOX


K

E 360 000

E 360 500
GATE GROUNDING ROD

E 361 000

E 361 500
GUY WIRE ANODE

GUARD RAIL P PUMP

VEHICLE BARRIER M MOTOR

X FENCE G GENERATOR

N 2 976 000 N 2 976 000


ABBREVIATIONS:

F/L FLOWLINE (PIPE) GND GROUND

A/G ABOVE GROUND FL FLOWLINE (GUTTER)

BREAK FLANGES FOR U/G UNDERGROUND FF FINISHED FLOOR

P/L PIPELINE E ELECTRIC


HDPE LINING (TYP)
TC TOP OF CONCRETE/CURB T TELEPHONE
(SEE DETAIL-1 SHT. NO. 001)
TP TOP OF PIPE S SEWER

BP BOTTOM OF PIPE W WATER

TW TOP OF WALL SW STORM WATER (MANHOLE)

TS TOP OF STEEL CP CATHODIC PROTECTION


T
AS ASPHALT PS PIPE SUPPORT

T PC POINT OF CURVATURE PT POINT OF TANGENCY


PIPE & MATERIAL DATA

PI POINT OF INTERSECTION AP ANGLE POINT

8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION

X'ING CROSSING INT. INTERNAL

STA STATION EXT. EXTERNAL

FBE FUSION BONDED EPOXY PSIG POUNDS PER SQUARE IN GAUGE

REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976

CONSTRUCTION SCOPE OF WORK CE-901977

PIPELINE ALIGNMENT DWG. INDEX CA-953028

STA. 3+000

STA. 4+000
SABKHA AREA END & SANDY

MARL ROAD 'X'ING

MARL ROAD 'X'ING


MARL ROAD 'X'ING

MARL ROAD 'X'ING

ELEV. ELEV.

GOAT YARD 'X'ING

GOAT YARD 'X'ING


(m) (m)
MARL AREA 'X'ING

MARL AREA 'X'ING

MARL AREA 'X'ING

MARL AREA 'X'ING

MARL AREA 'X'ING

MARL AREA 'X'ING


SANDY AREA END & SABKHA
TRACK 'X'ING

TRACK 'X'ING

35 35
TRACK 'X'ING

TRACK 'X'ING

30 30
AREA START
STA 2+026.91

STA 2+030.87

STA 2+243.80

STA 2+249.81

AREA START
STA 2+223.51

STA 2+230.54

25 25
ELEV. 6.50m

ELEV. 6.51m

STA 2+138.09

STA 2+145.00

STA 3+750.96
STA 3+641.93
ELEV. 6.28m

ELEV. 6.27m

STA 2+569.82

STA 2+576.64

STA 2+636.42

STA 2+645.40

STA 2+670.67
ELEV. 6.35m

STA 2+621.69
ELEV. 6.31m

ELEV. 10.76m

ELEV. 12.24m
ELEV. 6.32m

ELEV. 6.34m

ELEV. 7.06m

ELEV. 7.27m

ELEV. 7.33m

ELEV. 7.52m

ELEV. 7.60m

ELEV. 7.90m
PROFILE

20 20
STA 2+067.38

TOP OF EXISTING GRADE

ISSUED FOR CONSTRUCTION


ELEV. 6.41m

STA 2+302.57

15 15
ELEV. 6.47m

0 50 100 150 14-May-2023


200 250

10 10

0 5 10 15 20 25

METERS

5 5
HORIZONTAL SCALE 1 : 2500M

VERTICAL SCALE 1 : 250M

REVISION VALIDATION
0 0
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
2+000 2+500 3+000 3+500 4+000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001

MATERIAL SURVEY NOTES: GENERAL NOTES: CATHODIC PROTECTION NOTES:


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
1. COORDINATES ARE UTM (ZONE 39) INTERNATIONAL 1924 ELLIPSOID, 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH 9. CONTRACTOR TO INSTALL WARNING SIGNS AT ROAD 15. EXCAVATION UNDER THE EXISTING ABOVE GROUND 1. CATHODIC PROTECTION INSTALLATION SHALL BE IN ACCORDANCE WITH (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL
CONTRACTOR SHALL ENSURE THAT THE PIPELINES
THE FENCED AREA AS PER STD. DWG. AB-036907. 12/27/20 12/27/20 12/27/20 12/27/20
2000m SAES-L-460.
2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 2 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
REFERENCED THEREIN.
DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.

6. GROUND DISTANCE x COMBINED FACTOR = GRID DISTANCE


FOR CONSTRUCTION AND OPERATION.

5. TRENCHLESS CONSTRUCTION SHALL BE PROVIDED IN


CONTRACTOR SHALL LOCATE THE CAMEL CROSSINGS AND
SUBMIT A PROPOSAL FOR SAUDI ARAMCO APPROVAL PRIOR SAUDI ARABIAN OIL COMPANY
TO CONSTRUCTION OF THE CAMEL CROSSINGS.
DRAWING TYPE
ACCORDANCE WITH THE REQUIREMENTS OF SAES-L-470.
7. COMBINED FACTOR = 0.999840439 12. STATIONING IS BASED ON ORIGINAL TOPOGRAPHIC SURVEY. PIPELINE ALIGNMENT 8" WI-2 PRF
6. RIGHT OF WAY (ROW) SHALL BE CONSTRUCTED ALONG CONTRACTOR SHALL AS-BUILT THE STATIONING BASED ON
THE PIPELINE. SAND PILE, ROCK PILE AND OTHER ACTUAL SURVEY DURING CONSTRUCTION.
DEBRIS ALONG THE RIGHT OF WAY SHALL BE FROM STA. 2+000 TO STA. 4+000
CLEARED, HAULED AND DISPOSED BY THE 13. UNLESS OTHERWISE NOTED, MINIMUM RADIUS OF HORIZONTAL
& VERTICAL BEND SHALL BE 210.0 METERS & 105.0 METERS
CONSTRUCTION CONTRACTOR.
RESPECTIVELY.
SOUTH BERRI WELL SITES FACILITIES
7. DISTANCES TO POWER POLE STRUCTURES WERE
DETERMINED PER SAES-B-064 PARA. 7.6.
14. ALL EXCAVATION OF EXISTING LINES AND UTILITIES JUBAIL SAUDI ARABIA
CROSSING SHALL BE DONE BY HAND EXCAVATION ONLY.
8. BURIED PIPELINES SHALL BE EXT. FUSION BONDED PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

EPOXY (FBE) COATED AS PER APCS-104B OF SAES-H-002.


PIPELINES SHALL BE INTERNALLY HDPE LINED.
605 A CA-953029 002 00
Saudi Aramco 6285 ENG. (09/03)

RESTRICTED VECTOR CADD-02


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
TERRAIN SANDY STA. 4+825 SABKHA STA. 5+050 SANDY

CLASS
1
LOCATION

DESIGN
0.72
FACTOR

PIPE
8" API-5L GR. X60, SEAMLESS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL

PIPE WT &
0.500" WT x 2000m
LENGTH

PRESSURE MAOP = 3600 PSIG

F
E
N
C
E
x
CURVE 03 DATA
24" PWI FLANK (WI-3)
{ =

MATCHLINE STA. 6+000 FOR


STA 4+554.810 R = 209.966m (210.000m GND)

CONTINUATION SEE BELOW LEFT

CONTINUATION SEE SH. 004


MATCHLINE STA. 4+000 FOR

MATCHLINE STA. 5+000 FOR


T = 209.642m (209.675m GND)
WI-2 PC-03
CONTINUATION SEE SH. 002

L = 329.489m (329.542m GND) 8" PWI FLANK (WI-2)


N 2 976 159.909 1000.00m
M
A
R
E 362 127.119 L

WI-2 PI-03
R
O
A
D
LEGEND:
F
E SABKHA AREA SANDY AREA
N
C
E
N 2 976 159.584 SANDY AREA CONTROL STATION U/G TO A/G PIPELINE TRANSITION
x
ABANDON GOAT YARD
11 BOREHOLE REDUCER
E 362 336.760
4.00m

11
14

12

12
1

11
11 3

12
1
11
SANDY AREA ROW
1
ROW BENCH MARK FLANGE

11
B
A O
SANDY ARE B
T

11
1 O LIGHT POST VALVE

11
3 B 13

1
2
ROW ROW
x

11
POWER POLE

12
SABKHA AREA
1
1
SANDY AREA SANDY AREA
x JUNCTION BOX VERTICAL PIPE BENDS
11

12
11

1
A

2
R
L
1 R FIRE HYDRANT BLIND FLANGE, PIPE END
1 O
A
F D
A E
SANDY ARE N
SANDY AREA TOB C MHMANHOLE HORIZONTAL FLANGE
E

8" PWI FLANK (WI-2) x

KM KILOMETER MARKER

1
CATCH BASIN

5
SA 11 11
BK SABKHA AREA
SA HA 11 CO CLEAN OUT OIL WELL
BK AR 12
HA EA 11
554.810m 1
AR
EA E=362226.757
N=2976087.456
SABKHA AREA
WATER VALVE WATER WELL

2
1

E=361726.757
N=2976087.456 1 1

1
1

SURVEY LIMIT 4 ROCK


SURVEY LIMIT

1
1
1
11 1
1
11 DROP INLET WATER INJECTION WELL
11

1
SURVEY LIMIT
11

TOB
12

N=2975387.456
E=362226.757
BO
T
O
SIGN BOARD WM WELL MARKER
1 B 1
B 2 1
11 1
1

11
SA
ND SA
ROAD SIGN PALM TREE
11

Y BK
SA

BO B

1
AR HA
11

BK 11

1
EA AR HA
EA

1
AR

1
EA TRAFFIC SIGNAL TREE

SA NDY A REA
11

1
11

11
SA GUARD POST, POST PLANTERS
1

ND
11
1

Y
AR

11
EA 11
BO
B UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER
1
SURVEY LI

1
11
11

SANDY AREA UTILITY METER IRRIGATION PIVOT


1

SABKHA A REA
SURVEY LI
N 2 976 000 SA
BK
1 SABKHA AREA 1
1
11

SABKHA AREA
11
HA
AR

1
EA WATER TAP (HOSE BIB) GROUNDING BOX

1
11 1
MI

1
SABKHA AREA

1
T

BREAK FLANGES FOR

E 362 000

11
11

GATE GROUNDING ROD

MI
11 1
1

T
11

SA
HDPE LINING (TYP) GUY WIRE ANODE

11
BK
HA
AR
EA 11
11 11

11 (SEE DETAIL-1 SHT. NO. 001) GUARD RAIL P PUMP


11

VEHICLE BARRIER M MOTOR

1
1

11

N 2 975 500

N 2 975 000
11
1

STA 4+884.351
2

X FENCE G GENERATOR
11

11
12

11
11

11
11

11
WI-2 PT-03

SURVEY LIMIT
11
11
SA 11
BK 11

ROW
HA 1
AR
EA N 2 975 949.943 1
11
11

1
E 362 336.760

1
11
SA
BK ABBREVIATIONS:
12

11
11 HA
AR 11
EA

SA BKH A A REA
12

11
11

115.649m 1 F/L FLOWLINE (PIPE) GND GROUND


11

11 1
11

12

A/G ABOVE GROUND FL FLOWLINE (GUTTER)

12
SANDY AREA
11
E 362 000
11 U/G UNDERGROUND FF FINISHED FLOOR
12 12

SANDY AREA SANDY AREA


P/L PIPELINE E ELECTRIC

MATCHLINE STA. 5+000 FOR 11

TC TOP OF CONCRETE/CURB T TELEPHONE

CONTINUATION SEE ABOVE RIGHT TP TOP OF PIPE S SEWER

BP BOTTOM OF PIPE W WATER

TW TOP OF WALL SW STORM WATER (MANHOLE)

TS TOP OF STEEL CP CATHODIC PROTECTION


T
AS ASPHALT PS PIPE SUPPORT

T PC POINT OF CURVATURE PT POINT OF TANGENCY


PIPE & MATERIAL DATA

PI POINT OF INTERSECTION AP ANGLE POINT

8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION

X'ING CROSSING INT. INTERNAL

STA STATION EXT. EXTERNAL

FBE FUSION BONDED EPOXY PSIG POUNDS PER SQUARE IN GAUGE

REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976

CONSTRUCTION SCOPE OF WORK CE-901977

PIPELINE ALIGNMENT DWG. INDEX CA-953028

STA. 5+000

STA. 6+000
ELEV. ELEV.
(m) (m)

MARL ROAD 'X'ING

MARL ROAD 'X'ING


ABANDON GOAT YARD 'X'ING

ABANDON GOAT YARD 'X'ING


40 40
TOP OF SLOPE

TOE OF SLOPE
WI-2/PC-03

WI-2/PT-03

35 35
STA 4+554.81

STA 4+704.99

STA 4+757.58

STA 4+884.35

30 30
ELEV. 12.08m

ELEV. 12.05m

ELEV. 10.30m
ELEV. 10.31m

STA 5+906.61

STA 5+922.90
ELEV. 13.96m

ELEV. 13.66m
PROFILE

25 25

STA 5+053.19

STA 5+113.49
ISSUED FOR CONSTRUCTION
ELEV. 12.05m
ELEV. 11.39m

20 20

TOP OF EXISTING GRADE


0 50 100 150 14-May-2023
200 250

15 15

0 5 10 15 20 25

METERS

10 10
HORIZONTAL SCALE 1 : 2500M

VERTICAL SCALE 1 : 250M

REVISION VALIDATION
5 5
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
4+000 4+500 5+000 5+500 6+000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001

MATERIAL SURVEY NOTES: GENERAL NOTES: CATHODIC PROTECTION NOTES:


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
1. COORDINATES ARE UTM (ZONE 39) INTERNATIONAL 1924 ELLIPSOID, 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH 9. CONTRACTOR TO INSTALL WARNING SIGNS AT ROAD 15. EXCAVATION UNDER THE EXISTING ABOVE GROUND 1. CATHODIC PROTECTION INSTALLATION SHALL BE IN ACCORDANCE WITH (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS CONTRACTOR SHALL ENSURE THAT THE PIPELINES
12/27/20 12/27/20 12/27/20 12/27/20
2000m SAES-L-460. BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL THE FENCED AREA AS PER STD. DWG. AB-036907.
2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 2 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
REFERENCED THEREIN.
DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.

6. GROUND DISTANCE x COMBINED FACTOR = GRID DISTANCE


FOR CONSTRUCTION AND OPERATION.

5. TRENCHLESS CONSTRUCTION SHALL BE PROVIDED IN


CONTRACTOR SHALL LOCATE THE CAMEL CROSSINGS AND
SUBMIT A PROPOSAL FOR SAUDI ARAMCO APPROVAL PRIOR SAUDI ARABIAN OIL COMPANY
TO CONSTRUCTION OF THE CAMEL CROSSINGS.
DRAWING TYPE
ACCORDANCE WITH THE REQUIREMENTS OF SAES-L-470.
7. COMBINED FACTOR = 0.999840439 12. STATIONING IS BASED ON ORIGINAL TOPOGRAPHIC SURVEY. PIPELINE ALIGNMENT 8" WI-2 PRF
6. RIGHT OF WAY (ROW) SHALL BE CONSTRUCTED ALONG CONTRACTOR SHALL AS-BUILT THE STATIONING BASED ON
THE PIPELINE. SAND PILE, ROCK PILE AND OTHER ACTUAL SURVEY DURING CONSTRUCTION.
DEBRIS ALONG THE RIGHT OF WAY SHALL BE FROM STA. 4+000 TO STA. 6+000
CLEARED, HAULED AND DISPOSED BY THE 13. UNLESS OTHERWISE NOTED, MINIMUM RADIUS OF HORIZONTAL
& VERTICAL BEND SHALL BE 210.0 METERS & 105.0 METERS
CONSTRUCTION CONTRACTOR.
RESPECTIVELY.
SOUTH BERRI WELL SITES FACILITIES
7. DISTANCES TO POWER POLE STRUCTURES WERE
DETERMINED PER SAES-B-064 PARA. 7.6.
14. ALL EXCAVATION OF EXISTING LINES AND UTILITIES JUBAIL SAUDI ARABIA
CROSSING SHALL BE DONE BY HAND EXCAVATION ONLY.
8. BURIED PIPELINES SHALL BE EXT. FUSION BONDED PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

EPOXY (FBE) COATED AS PER APCS-104B OF SAES-H-002.


PIPELINES SHALL BE INTERNALLY HDPE LINED.
605 A CA-953029 003 00
Saudi Aramco 6285 ENG. (09/03)

RESTRICTED VECTOR CADD-02


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
TERRAIN SANDY

CLASS
1
LOCATION

DESIGN
0.72
FACTOR

PIPE
8" API-5L GR. X60, SEAMLESS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL

PIPE WT &
0.500" WT x 1798m
LENGTH

PRESSURE MAOP = 3600 PSIG

CURVE 04 DATA
{ =
E 362 500 WI-2 PI-04
R = 104.983m (105.000m GND)
N 2 973 177.470

N 2 974 500

N 2 974 000

N 2 973 500
T = 104.983m (105.000m GND)
E 362 336.760
L = 164.907m (164.934m GND)

STA 7+552.267 STA 7+717.200 LEGEND:


MATCHLINE STA. 6+000 FOR

WI-2 PC-04 WI-2 PT-04


CONTINUATION SEE SH. 003

CONTROL STATION U/G TO A/G PIPELINE TRANSITION


M ARL RO A D

8" PWI FLANK (WI-2) BOREHOLE REDUCER


2667.489m N 2 973 282.453 N 2 973 177.470
BENCH MARK FLANGE
E 362 336.760 E 362 231.777
LIGHT POST VALVE

POWER POLE
SANDY AREA
STA 7+730.786
JUNCTION BOX VERTICAL PIPE BENDS
SANDY AREA
WI-2 END OF SURVEY
1 13 13 FIRE HYDRANT BLIND FLANGE, PIPE END
1

1
11

2
ROW

2
11
ROW N 2 973 177.470

3
1
1
14 MHMANHOLE HORIZONTAL FLANGE

13
12

11
12

14
2
12
1
E 362 218.193

1
CATCH BASIN KM KILOMETER MARKER

3
11
12 SABKHA AREA
15
13

4
12

1
CO CLEAN OUT OIL WELL
SANDY AREA
SANDY AREA STA 7+738.00
WATER VALVE WATER WELL

12
(THRUST ANCHOR
M ARL ROAD

DROP INLET WATER INJECTION WELL

CENTERLINE) SIGN BOARD WM WELL MARKER

1
5
ROAD SIGN PALM TREE
N 2 973 177.470

N=2973914.414
E=362226.757
11
11

1
TRAFFIC SIGNAL TREE

13
12

4
17

13
1
15
E 362 211.190
12

1
13
11 2
1
3 1
1
GUARD POST, POST PLANTERS

1
12 1

15

3
4 1

17
14

16
2
SABKHA AREA

12
14

1
5
12
SURVEY LIMIT 1 SURVEY LIMIT
1 SURVEY LI
MIT UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER
SURVEY LI
MIT

15
11 11

1
E=362226.757
N=2974614.414

START

15
1
1

12
2
15

1
UTILITY METER IRRIGATION PIVOT

1
80.587m
12 16

1
1

14
1 16

16
WATER TAP (HOSE BIB) GROUNDING BOX
3

1
1

2
6

1
1

13
5

1
1

13

13
1

3
1
3
17
STA. 7+798.00 GATE GROUNDING ROD

SURVEY LIMIT
11

11
11

13

1
3
11
GUY WIRE ANODE
11

END OF WI-2

11
1
1

1
4

12
2

14
11

13
12

14
1

14

1
GUARD RAIL P PUMP
2

11

4
12

14
(SCRAPER
SURVEY LIMIT

11

SURVEY LIMIT
1

SURVEY LIMIT
6
VEHICLE BARRIER M MOTOR

3
1

12
1
5

16
16
13
SANDY AREA

15
1
BARRED TEE)

14
12

15
17
X FENCE G GENERATOR

1
12
6

4
SANDY AREA 1 15 SANDY AREA

1
3
2

1
SANDY AREA
1 1
N 2 973 177.470

1
1
6

15
11
SANDY AREA
11

13 SANDY AREA

13
1 16

1
4

11

1
2
SANDY AREA 15 4

3
BREAK FLANGES FOR 15
15
1
E 362 151.190
13

2
1

13

1
14

3
1
15

12

1
2
HDPE LINING (TYP) 1
1

13
13
ABBREVIATIONS:
M

1
AR
11 3

1
L 1 12
14

SCRAPER RECEIVER @ DS-3


RO
13
(SEE DETAIL-1 SHT. NO. 001)
AD
14

2 SANDY AREA
14 1

14
1

14
5 13
11 F/L FLOWLINE (PIPE) GND GROUND
15 1

13
2 14
15

SANDY AREA
12

FOR DETAILS, SEE PLOT PLAN


1
FL FLOWLINE (GUTTER)
1
1 A/G ABOVE GROUND

11
3 11
13
12

12
13
16
13
13
5 4
1
U/G UNDERGROUND FF FINISHED FLOOR

12
1
12 14 14

12

3
1
DWG. CA-903037 & PIPING

12
4
1
1

x
4

12 12
P/L PIPELINE E ELECTRIC

x
x

13
E
NC
1 FE

1
1 13 4

1
6 x
12

M
12 1 AR x
5 T TELEPHONE
PLAN DWG. CA-903049 TC TOP OF CONCRETE/CURB
4

13
1

L 1
3

RO
AD

TP TOP OF PIPE S SEWER

BP BOTTOM OF PIPE W WATER

TW TOP OF WALL SW STORM WATER (MANHOLE)

TS TOP OF STEEL CP CATHODIC PROTECTION

4 Mg T
AS ASPHALT PS PIPE SUPPORT

T 27 PC POINT OF CURVATURE PT POINT OF TANGENCY


PIPE & MATERIAL DATA

PI POINT OF INTERSECTION AP ANGLE POINT

8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION

X'ING CROSSING INT. INTERNAL

STA STATION EXT. EXTERNAL

FBE FUSION BONDED EPOXY PSIG POUNDS PER SQUARE IN GAUGE

(SCRAPER BARRED TEE)


REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976

DRILL SITE FENCE

PIPELINE ANCHOR
CONSTRUCTION SCOPE OF WORK CE-901977

PIPELINE ALIGNMENT DWG. INDEX CA-953028

END OF WI-2
STA. 7+000

STA. 7+798
OPEN CUT
ELEV. ELEV.

SABKHA AREA START


(m) (m)

SABKHA AREA END


MARL ROAD 'X'ING

MARL ROAD 'X'ING

40 40

END OF WI-2
WI-2/PC-04

WI-2/PT-04

SURVEY
PT-02
35 35

PI-02

Bush
STA 6+922.25

STA 7+027.27

STA 7+552.27

STA 7+730.79
STA 7+717.20
STA 7+170.19
30 30
ELEV. 12.48m

ELEV. 12.50m
ELEV. 11.90m

ELEV. 13.81m

ELEV. 13.17m

ELEV. 13.41m
STA 6+040.01

STA 6+051.53

STA 7+696.48
ELEV. 12.01m

ELEV. 11.98m

ELEV. 11.12m
STA 7+614.37
PROFILE

ELEV. 11.13m
25 25

20 20
ISSUED FOR CONSTRUCTION
TOP OF EXISTING GRADE
0 50 100 150 14-May-2023
200 250

15 15

0 5 10 15 20 25

METERS

10 10
HORIZONTAL SCALE 1 : 2500M

VERTICAL SCALE 1 : 250M

REVISION VALIDATION
5 5
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
6+000 6+500 7+000 7+500
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-09561-0002-001

MATERIAL SURVEY NOTES: GENERAL NOTES: CATHODIC PROTECTION NOTES:


DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
1. COORDINATES ARE UTM (ZONE 39) INTERNATIONAL 1924 ELLIPSOID, 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH 9. CONTRACTOR TO INSTALL WARNING SIGNS AT ROAD 15. EXCAVATION UNDER THE EXISTING ABOVE GROUND 1. CATHODIC PROTECTION INSTALLATION SHALL BE IN ACCORDANCE WITH (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL
CONTRACTOR SHALL ENSURE THAT THE PIPELINES
THE FENCED AREA AS PER STD. DWG. AB-036907. 12/27/20 12/27/20 12/27/20 12/27/20
1798m SAES-L-460.
2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 2 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
27 KG (60 LB) MAGNESIUM ANODE INSTALLED 4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4 4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
Mg REFERENCED THEREIN.
PER DWG. AA-036352 SHT. 001 & 002 DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.

6. GROUND DISTANCE x COMBINED FACTOR = GRID DISTANCE


FOR CONSTRUCTION AND OPERATION.

5. TRENCHLESS CONSTRUCTION SHALL BE PROVIDED IN


CONTRACTOR SHALL LOCATE THE CAMEL CROSSINGS AND
SUBMIT A PROPOSAL FOR SAUDI ARAMCO APPROVAL PRIOR SAUDI ARABIAN OIL COMPANY
TO CONSTRUCTION OF THE CAMEL CROSSINGS.
DRAWING TYPE
ACCORDANCE WITH THE REQUIREMENTS OF SAES-L-470.
7. COMBINED FACTOR = 0.999840439 12. STATIONING IS BASED ON ORIGINAL TOPOGRAPHIC SURVEY. PIPELINE ALIGNMENT 8" WI-2 PRF
6. RIGHT OF WAY (ROW) SHALL BE CONSTRUCTED ALONG CONTRACTOR SHALL AS-BUILT THE STATIONING BASED ON
THE PIPELINE. SAND PILE, ROCK PILE AND OTHER ACTUAL SURVEY DURING CONSTRUCTION.
DEBRIS ALONG THE RIGHT OF WAY SHALL BE FROM STA. 6+000 TO STA. 7+798
CLEARED, HAULED AND DISPOSED BY THE 13. UNLESS OTHERWISE NOTED, MINIMUM RADIUS OF HORIZONTAL
& VERTICAL BEND SHALL BE 210.0 METERS & 105.0 METERS
CONSTRUCTION CONTRACTOR.
RESPECTIVELY.
SOUTH BERRI WELL SITES FACILITIES
7. DISTANCES TO POWER POLE STRUCTURES WERE
DETERMINED PER SAES-B-064 PARA. 7.6.
14. ALL EXCAVATION OF EXISTING LINES AND UTILITIES JUBAIL SAUDI ARABIA
CROSSING SHALL BE DONE BY HAND EXCAVATION ONLY.
8. BURIED PIPELINES SHALL BE EXT. FUSION BONDED PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

EPOXY (FBE) COATED AS PER APCS-104B OF SAES-H-002.


PIPELINES SHALL BE INTERNALLY HDPE LINED.
605 A CA-953029 004 00
Saudi Aramco 6285 ENG. (09/03)

RESTRICTED VECTOR CADD-02