Professional Documents
Culture Documents
P&id Wi-2
P&id Wi-2
NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
V HYDROTEST.
1"-RL-0285-1SY0W01 1"
PZV
#5
1003 2"x1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
FB18 G18
2"
#7
¾"x1"
2"
2"-W-0288-15LE1W01
2"
Flank-2 water injection line 8" PMCC & BODY TESTED AS PER SAEL-L-108 PAR.4.7.
V ¾" 2" EQUALIZING LINE 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
CSO
*
#7 1" 2"x1" 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.
2"-W-0287-15LE1W01
1SY0W01
1LE1W01
2"-VG-0286-15LE1W01
CSO #5 1" D V 2" 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE
*
¾" TURNED TO ITS OPEN POSITION AFTER TESTING.
#5
(TYP.)
V #6 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
#6 #5 PRESSURE INDICATED IN THE DRAWING.
XPI PL02
G17 2" #5
¾"-VG-0284-15SY0W01 1035
PURGE 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
#4 2" PI
FB17 CONN * INT.FBE COATED INT.PE-RT LINED WIP DS-03 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
1019
¾" ¾" CARBON STEEL CARBON STEEL FENCE FENCE
PI ¾"
CSO 1" #4 12.COMPONENTS WHICH INTERFERE WITH FILLING
1018 XPI
2"x¾" * FB05 FLUSHING, VENTING AND DRAINING SHALL NOT
#6 #5 1034 2"x¾" *
#4 BE INSTALLED WITH LINE FILLING AND PRESSURE
#5 MOV THRUST THRUST
2" #5 2" +
#4
*
1005 #4 #3 ANCHOR TESTING.
2" M
ANCHOR
CSO
*
END 2" 2" TO DS-03
607-L-0002 * 8" WATER INJECTION FLANK WI-2
CLOSURE CA-903039.001
2" 8"-1500# BARRED ( INT.PE-RT LINED C.S )
2" 3"
*
*
(TYP.) 1" SC FB TEE
2" #5A
#4A #4A
2"
PMCC Limits
FB04 G04
MIN. AG UG LEGEND
FB06 G06
D DRAIN
2"-VG-0279-1LE1W01
2"-D-0280-15LE1W01
V VENT
#4
*
#1 TEST LIMIT
2" 3" ¾" 2"x¾"
MOV
+
* TEMPORARY BLIND
1007
*
PDI TEMPORARY PLUG
M
1021
2"
PI
¾" SPECTACLE PLAT CLOSED POSITION
1030
*
* 2"x¾"
#4
¾"
#5A #5A #4
2"x¾" MIN
3"
3"-W-0281-15LE1W01
KICKER LINE
2"
PI REFERENCE DRAWINGS
1017 2"x1" DWG. CONTROL FOR JO-10-09561-0001 CD-901976
* #5A 1" D PIPING & INSTRUMENT DIAGRAM CA-902088.001
#4A ¾" PIPING & INSTRUMENT DIAGRAM CA-902089.001
FB23 G23 #7 #7 #4A
2"x¾" MATERIAL TAKE-OFF T/O-952850-001
2"
* * 2"-D-0282-15LE1W01
2"
DRAIN LINE
1LE1W01 15LE1W01
2"
#4A
#4
*
TO GRAVITY
SEWER TO GRAVITY
SEWER #4 BI-10-09561 (PLANT-605)
*
605 160
FROM WIP WATER
INJECTION MANIFOLD
PLANT 607
14-May-2023
REVISION VALIDATION
THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
10-09561-0002-001
H Y D R O S T A T I C T E S T S C H E D U L E
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
STRENGTH TEST TIGHTNESS TEST (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST NO. LIMITED BY ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION HBZ MAB ORJ MSK
05/08/22 05/08/22 05/08/22 05/08/22
2"-VG-0390-15LE1W01
V 1" 3/4"x1"
SET @ 3300.0 PSIG
2"x1" PZV
+
2" 2" 2"-W -0393-15LE1W01 EQUALIZING LINE 2" 1004 1"-RL -0391-1SY0W01
1SY0W01
2"
1LE1W01
2"-W -0394-15LE1W01 1"
XPI 0 - 4000 PSIG LEGEND
2" V
DS-03 1036 PIPING MATERIAL INSTRUMENT DEFINITION & SYMBOLS SAES-J-003
FENCE PI 2" 3/4"-VG-0392-15SY0W01 SPECIFICATION SAES-L-105
MOV TYPICAL 0 - 4000 PSIG AC/AFO -AIR TO CLOSE/ VE -VIBRATION ELEMENT
1024 PURGE AIR FAILURE OPEN VS -VIBRATION SWITCH
3/4" DETAIL CONN 3/4" 2" AC/AFS -AIR TO CLOSE/AIR
INT.PE-RT LINED INT.FBE COATED 2"x3/4" PI PROCESS LINE VT -VIBRATION TRANSMITTER
CARBON STEEL CARBON STEEL 3/4" NOTE-7 CSO 1" FAILURE STEADY XL -PILOT LIGHT
XPI 1025 INSTRUMENT AO/AFC -AIR TO OPEN/ (NOT FOR MOTOR)
2"x3/4" AIR FAILURE CLOSE
2"x3/4" NOTE-2 2" 1037 AIR LINE XS -LIMIT SWITCH
INPUTS
8" WATER INJECTION FLANK WI-2 NOTE-3 2" 605-003-L-0003 AT
DT
-ANALYZER TRANSMITTER
-DENSITY TRANSMITTER
L-LEVEL T-TEMP.
BAND TYPE END
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
X-MISC. A-ALARM
CA-902088 SHT.001 SCRAPER RECEIVER REDUCER ESD -EMER. SHUTDOWN SYSTEM
( INT.PE-RT LINED C.S ) BARRED TEE BARRED TEE 8" CLOSURE FC - FLOW CONTROLLER
LOCAL PANEL
CL1500 SPECTACLE FV -FLOW CONTROL VALVE
MOUNTED INSTR.
2"-VG-0389-1LE1W01
2" 2"x3/4" ANGLE VALVE
MOUNTED BEHIND
2"-D-0397-15LE1W01
2"-D-0395-15LE1W01
+
LA -LEVEL ALARM
NOTE-7 1008 LV -LEVEL CONTROL VALVE R AC K MOU NTED
PRESS. RELIEF VALVE LCV -LEVEL CONTROL VALVE (OR BACK OF PANEL)
(SELF-ACTUATED)
MOV + LG -LEVEL GAUGE GLASS ELECTRICAL
1020
PDI 0-30 PSI -LEVEL IND ICATOR C ONTROLLER SUPPLY REQUIRED
8" VACUUM RELIEF VALVE LIC
-LEVEL INDICATOR
LI
CL1500 2"
M
8" 1023 0 - 4000 PSIG -LEVEL RECORDER INSTRUMENT
M
LR
M LS -LEVEL SWITCH AIR SUPPLY REQUIRED
MOTOR OPERATED
PI LT -LEVEL TRANSMITTER
VALVE H
1031 LTD -LEVEL TRANSDUCER H IGH LOW
ML -MOTOR STATUS LIGHT L
P MOV -MOTOR OPERATED VALVE
PISTON OPERATED NA -ANNUNCIATOR TWO PEN R EC ORD ER
VALVE PB -PUSHBUTTON
2" 2"x3/4" 3/4" 3/4" PC -PRESSURE CONTROLLER FF
CONTROL VALVE PV -PRESS. CONTROL VALVE FOU ND ATION
PCV -PRESS. CONTROL VALVE FIELD BU S IN STRU MEN T
2"x3/4" (SELF ACTUATED)
P
BALL TYPE PDC -PRESS. DIFF. CONTROLLER DISTRIBUTED CONTROL/SHARED
CONTROL VALVE PDI -PRESS. DIFF. INDICATOR DISPLAY SYMBOLS
MIN 2" WITH POSITIONER PDIC -PRESSURE DIFFERENTIAL
3" 3"-W -0396-15LE1W01 KICKER LINE INDICATOR CONTROLLER
(DCS) DISTRIB UTED C ONTROL
S SYSTEM, OPERATOR ACCESSIBLE
SOLENOID VALVE PDIS -PRESSURE DIFFERENTIAL IN C ONTROL R OOM
2" 0 - 4000 PSIG INDICATOR SWITCH (DCS) DISTRIB UTED C ONTROL
PDT -PRESS. DIFF. TRANSMITTER
VALVE NORMALLY SYSTEM, OPERATOR INACCESSIBLE
2"x1" 3/4" CLOSED
PDTD -PRESS. DIFF. TRANSDUCER IN C ONTROL R OOM
PI PG -PRESSURE GAGE
D 1" XPI - SCRAPER PASSAGE PI -PRESSURE INDICATOR (DCS) DISTRIB UTED C ONTROL
1026 INDICATOR PIC -PRESS. IND ICATOR CONTROLLER
SYSTEM, OPERATOR INACCESSIBLE
2"x3/4" PR -PRESSURE REC ORDER
IN FIELD
AG UG PS -PRESSURE SW ITCH
INSULATING PT -PRESSURE TRANSMITTER DISTRIBUTED CONTROL
2" GASKET PX -PRESSURE POINT INTERCONNECTING LOGIC
8"-D-0098-15LE1W01 8" EVAPORATION PY -PRESS. COMPUTATION MOD. CONTROLLER WITH BINARY
POND PZV -PRESSURE RELIEF VALVE OR SEQUENTIAL FUNCTIONS
DRAIN LINE
SLOPE RTD -RESIST. TEMP. DETECTOR
(PLC) PROGRAM MABLE L OGIC
SI -SPEED INDICATOR
CONTROLL ER, N ORMAL LY
4" SS -SPEED SWITCH INACCESSIBLE OR BEHIND THE
15LE1W01 1LE1W01 TC -TEMP. CONTROLLER PANEL DEVICE OR FUNCTIONS
TV -TEMP. CONTROL VALVE (PLC) PROGRAM MABLE L OGIC
2" SWAGE TCV -TEMP. CONTROL VALVE CONTROLL ER FUN CTION,
NIPPLE (SELF-ACTUATED) CAN BE NOR MALLY
TE -TEMP. ELEMENT DISPLA YED ON CR T
TSO -TIGHT SHUT OFF TG -THERMOMETER LOCAL D CS OR AUX ILIARY
S.C. - SAMPLE CONN. THS -TEMP. HAND SWITCH DCS LOCATION N ORMAL LY
TI -TEMP. INDICATOR ACCE SSIBLE TO OPER ATOR
S -DRAIN TO
PRESSURE SEWER TR -TEMP. RECORDER
(PLC) PROGRAM MABLE L OGIC
TS -TEMP. SWITCH
OWS -OILY WATER SEWER CONTROLL ER I/O POIN T
TT -TEMP. TRANSMITTER NORMALLY INACCESSIBLE
D -DRAIN TTD -TEMP. TRANSDUCER BY OPERATOR
V -VENT TW -THERMOWELL
REFERENCE DRAWINGS
LETTER IDENTIFICATION OF LINES AB-036204
PIPING SYMBOLS AB-036227
EQUIPMENT SYMBOLS AB-036305
INSTRUMENT SYMBOLS AC-036950
PIPING LAYOUT INDEX
PLOT PLAN
TO DS-03 WATER
INJECTION HEADER
8" 8"-W -0537-15LE1W01
CA-901998 SHT.001
PMCC Limits
REVISION VALIDATION
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001
SMART CADD-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES:
V HYDROTEST.
1"-RL-0285-1SY0W01 1"
PZV
#5
1003 2"x1" 7.ALL VALVES 2" AND LARGER SHALL BE SEAT
FB18 G18
2" 2" 2" & BODY TESTED AS PER SAEL-L-108 PAR.4.7.
2"-W-0288-15LE1W01
#7
V ¾"x1" 2" EQUALIZING LINE
¾" CSO 8.ALL EQUIPMENT AND TOOLS NECESSARY FOR
*
#7 1" 2"x1" 2" TESTING SHALL BE PROVIDED BY THE CONTRACTOR.
2"-W-0287-15LE1W01
1SY0W01
1LE1W01
2"-VG-0286-15LE1W01
CSO #5 1" D V 2" 9.ALL SPECTACLE PLATE USED AS BLIND SHALL BE
*
¾" TURNED TO ITS OPEN POSITION AFTER TESTING.
#5
(TYP.)
V #6 10.SHORT SPOOLS CAN BE SHOP HYDROTESTED TO THE
#6 #5 PRESSURE INDICATED IN THE DRAWING.
XPI PL02
G17 2" #5
¾"-VG-0284-15SY0W01 1035
PURGE 11.SOFT SEATED VALVES SHALL NOT BE INSTALLED
#4 2" PI
FB17 CONN * INT.FBE COATED INT.PE-RT LINED WIP DS-03 UNTIL THE LINES ARE THOROUGHLY FLUSHED.
1019
¾" ¾" CARBON STEEL CARBON STEEL FENCE FENCE
PI ¾"
CSO 1" #4 12.COMPONENTS WHICH INTERFERE WITH FILLING
1018 XPI
2"x¾" * FB05 FLUSHING, VENTING AND DRAINING SHALL NOT
#6 #5 1034 2"x¾" *
#4 BE INSTALLED WITH LINE FILLING AND PRESSURE
#5 MOV THRUST THRUST
2" #5 2" +
#4
*
1005 #4 #3 ANCHOR TESTING.
2" M
ANCHOR
CSO
*
END 2" 2" TO DS-03
607-L-0002 * 8" WATER INJECTION FLANK WI-2
CLOSURE CA-903039.001
8"-1500# ( INT.PE-RT LINED C.S )
2" 3" 2" BARRED
PMCC Limits
*
*
(TYP.) 1" SC FB TEE
2" #5A 2"
#4A #4A
FB04 G04
MIN. AG UG LEGEND
FB06 G06
D DRAIN
2"-VG-0279-1LE1W01
2"-D-0280-15LE1W01
V VENT
#4
*
#1 TEST LIMIT
2" 3" ¾" 2"x¾"
MOV
+
* TEMPORARY BLIND
1007
*
PDI TEMPORARY PLUG
M
1021
2"
PI
¾" SPECTACLE PLAT CLOSED POSITION
1030
*
* 2"x¾"
#4
¾"
#5A #5A #4
2"x¾" MIN
3"
3"-W-0281-15LE1W01
KICKER LINE
2"
PI REFERENCE DRAWINGS
1017 2"x1" DWG. CONTROL FOR JO-10-09561-0001 CD-901976
* #5A 1" D PIPING & INSTRUMENT DIAGRAM CA-902088.001
#4A ¾" PIPING & INSTRUMENT DIAGRAM CA-902089.001
FB23 G23 #7 #7 #4A
2"x¾" MATERIAL TAKE-OFF T/O-952850-001
2"
* * 2"-D-0282-15LE1W01
2"
DRAIN LINE
1LE1W01 15LE1W01
2"
#4A
#4
*
TO GRAVITY
SEWER TO GRAVITY
SEWER #4 BI-10-09561 (PLANT-605)
*
605 160
FROM WIP WATER
INJECTION MANIFOLD
PLANT 607
14-May-2023
SCALE:
REVISION VALIDATION
THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
10-09561-0002-001
H Y D R O S T A T I C T E S T S C H E D U L E
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
STRENGTH TEST TIGHTNESS TEST (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
TEST NO. LIMITED BY ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
TEST PRESSURE SAFETY VALVE SETTING DURATION TEST PRESSURE SAFETY VALVE SETTING DURATION HBZ MAB ORJ MSK
05/08/22 05/08/22 05/08/22 05/08/22
CLASS
1
LOCATION
DESIGN
0.72
FACTOR
PIPE
8" API-5L GR. X60, SMLS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL
PIPE WT &
0.500" WT x 2160m
LENGTH
MATC
6
67.538m
SCRAPER LAUNCHER @ SOUTH BERRI WIP HLI
NE S
CONT TA.2
INUAT +000
PI-A FOR DETAILS, SEE PLOT PLAN ION S FOR
STA. 0-159.710 EE S
H.00
S
A
DWG. CA-952848 & PIPING E 35 2
B
START OF WI-2 N 2 977 584.911
K
9 50
H
A
0
A
R
E 359 363.239
E
(SCRAPER RETAINER
A
TRAC
PLAN DWG. CA-952860 FLANGE RF WN
6
K 6
500
BARRED TEE) 8"x8D BEND RING
ROW
MA
RL
#1500, NASI FLANGE RF WN
RO
AD
N 2 977 654.075
LEGEND:
AREA
#1500, NASI
MA
976
MARL RL
RO
ROAD AD
6
Y
6
CONTROL STATION U/G TO A/G PIPELINE TRANSITION
SAND
STA 0-077.375 HDPE LINING (TYP) E 35
S
A
S
BOREHOLE REDUCER
9 50
B
A
2
K
B
0
H
237.681m
K
(THRUST ANCHOR
A
H
(SEE DETAIL-1)
6
180.058m
A
RISER PIPE
A
BENCH MARK FLANGE
1
7
3.
R
A
8 KV ¾" V
E
R
N
A
E
000
A
POWE CENTERLINE) LIGHT POST VALVE
R LI
NE THREAD-O-LET POWER POLE
13.8 KV STA. N 2 977 584.911
POWE 0+61 JUNCTION BOX VERTICAL PIPE BENDS
976
.
306
R LI E 359 352.611
NE STA.
0+76 FIRE HYDRANT BLIND FLANGE, PIPE END
.306 8
2
8 KV
POWE CATCH BASIN KM KILOMETER MARKER
WI-2 START OF SURVEY/ R LI
N
NE CO CLEAN OUT OIL WELL
S
A
POWE .959 WATER VALVE WATER WELL
B
STA 0+090.440 CURVE 02 DATA
K
R LI
H
STA.
A
NE 1+784 DROP INLET WATER INJECTION WELL
A
HDPE HDPE
7
{ = .923
R
8
WI-2 PC-01
E
HDPE HDPE
A
SIGN BOARD WM WELL MARKER
LINER LINER TE
7
ROAD SIGN PALM TREE
EN
OD
T = 179.865m (179.894m GND) BH WO
CURVE 01 DATA E 359 181.553
7
EA
TRAFFIC SIGNAL TREE
STA 0+452.349
DETAIL-1 L = 297.453m (297.501m GND)
Y AR
EA
{ = GUARD POST, POST PLANTERS
Y AR
WI-2 PT-01
SAN D
R = 209.966m (210.000m GND) NTS STA 1+762.319 UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER
SAN D
N 2 977 342.994
7
STA 1+464.818
7
7
7
7
WI-2 PT-02
E 358 973.993
8
L = 361.851m (361.909m GND) WI-2 PC-02 WATER TAP (HOSE BIB) GROUNDING BOX
9
N 2 976 164.233
M
7
A
8
GATE GROUNDING ROD
R
N 2 976 342.287
L
000
R
9
A
9
E 359 127.875
9
GUARD RAIL P PUMP
9 1012.469m
8" PWI FLANK (WI-2)
8
0 SANDY AREA
977
1
9 E 35 VEHICLE BARRIER M MOTOR
WI-2 PI-01 9 00 8
8 0 1 X FENCE G GENERATOR
0
4.00m
10
N 2 977 584.911
500
SANDY AREA
8
2
SANDY AREA
SANDY AREA
E 358 936.792 7
MARL ROAD
N
8
7 7 MARL ROAD
977
MARL ROAD
7
8 8
8
8
8
7
9
ABBREVIATIONS:
OAD
MARL R
ROW ROW
8
8 GND GROUND
OAD F/L FLOWLINE (PIPE)
MARL R
15.00m
ROAD
10 8
2
MARL
8 8
7
SANDY AREA
OAT
YAR
D
E 359 155.212
N G
NDO TP TOP OF PIPE S SEWER
ABA
8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION
REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976
PIPELINE ANCHOR
STA. 2+000
STA. 1+000
OPEN CUT
WI-2/PC-02
WI-2/PT-02
WI-2 START
OF SURVEY
WI-2/PC-01
30 30
STA 0+455.18
STA 1+464.82
STA 1+762.32
STA 0+844.86
STA 1+088.96
STA 0+093.28
STA 0+091.20
25 25
ELEV. 6.16 m
ELEV. 7.49m
ELEV. 9.10m
ELEV. 8.16m
STA 1+540.25
STA 1+576.41
ELEV. 7.58m
STA 000.00
ELEV. 9.18m
ELEV. 6.43m
ELEV. 6.45m
ELEV. 7.72m
ELEV. 7.88m
PROFILE
STA 1+747.25
STA 1+769.14
20 20
ELEV. 8.14m
ELEV. 8.17m
ISSUED FOR CONSTRUCTION
TOP OF EXISTING GRADE
15 15
10 10
0 5 10 15 20 25
METERS
5 5
HORIZONTAL SCALE 1 : 2500M
REVISION VALIDATION
0 0
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
0+000 0+500 1+000 1+500 2+000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001
ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS CONTRACTOR SHALL ENSURE THAT THE PIPELINES
SAES-L-460. BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL THE FENCED AREA AS PER STD. DWG. AB-036907. 12/27/20 12/27/20 12/27/20 12/27/20
2160m 2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 3 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
27 KG (60 LB) MAGNESIUM ANODE INSTALLED 4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4 4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
Mg REFERENCED THEREIN.
PER DWG. AA-036352 SHT. 001 & 002 DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.
CLASS
1
LOCATION
DESIGN
0.72
FACTOR
PIPE
8" API-5L GR. X60, SMLS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL
PIPE WT &
0.500" WT x 2000m
LENGTH
LEGEND:
NE
NE
LI
LI
BOREHOLE REDUCER
POW ER
POW ER
LIGHT POST VALVE
POWER POLE
KV
KV
MHMANHOLE HORIZONTAL FLANGE
SABKHA AREA
CATCH BASIN KM KILOMETER MARKER
MA
8
13.
13.
24" PWI FLANK (WI-3)
TR
RL
SANDY AREA
RO
K
4.00m
SANDY AREA
10
SIGN BOARD WM WELL MARKER
ROW
9
8
1
1
12
1
SA
SA
13
1
12
11
1
2
13
8
M AR
SANDY AREA
1
1
B
SABKHA AREA
1
K
8
N
1
2
SABKHA AREA 7
K
13
TRAC
DY
SABKHA AREA
H
GOAT YARD
8
1
A
10
MA
1
MARL AREA 11
AR
12
A
RL
R
EA
SANDY AREA
EA
SANDY AREA
STA.3+758.598
AD
STA.3+773.598
SANDY AREA GUARD POST, POST PLANTERS
RO
SANDY AREA
AD
E 360 000
E 360 500
GATE GROUNDING ROD
E 361 000
E 361 500
GUY WIRE ANODE
X FENCE G GENERATOR
8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION
REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976
STA. 3+000
STA. 4+000
SABKHA AREA END & SANDY
ELEV. ELEV.
TRACK 'X'ING
35 35
TRACK 'X'ING
TRACK 'X'ING
30 30
AREA START
STA 2+026.91
STA 2+030.87
STA 2+243.80
STA 2+249.81
AREA START
STA 2+223.51
STA 2+230.54
25 25
ELEV. 6.50m
ELEV. 6.51m
STA 2+138.09
STA 2+145.00
STA 3+750.96
STA 3+641.93
ELEV. 6.28m
ELEV. 6.27m
STA 2+569.82
STA 2+576.64
STA 2+636.42
STA 2+645.40
STA 2+670.67
ELEV. 6.35m
STA 2+621.69
ELEV. 6.31m
ELEV. 10.76m
ELEV. 12.24m
ELEV. 6.32m
ELEV. 6.34m
ELEV. 7.06m
ELEV. 7.27m
ELEV. 7.33m
ELEV. 7.52m
ELEV. 7.60m
ELEV. 7.90m
PROFILE
20 20
STA 2+067.38
STA 2+302.57
15 15
ELEV. 6.47m
10 10
0 5 10 15 20 25
METERS
5 5
HORIZONTAL SCALE 1 : 2500M
REVISION VALIDATION
0 0
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
2+000 2+500 3+000 3+500 4+000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001
ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL
CONTRACTOR SHALL ENSURE THAT THE PIPELINES
THE FENCED AREA AS PER STD. DWG. AB-036907. 12/27/20 12/27/20 12/27/20 12/27/20
2000m SAES-L-460.
2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 2 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
REFERENCED THEREIN.
DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.
CLASS
1
LOCATION
DESIGN
0.72
FACTOR
PIPE
8" API-5L GR. X60, SEAMLESS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL
PIPE WT &
0.500" WT x 2000m
LENGTH
F
E
N
C
E
x
CURVE 03 DATA
24" PWI FLANK (WI-3)
{ =
WI-2 PI-03
R
O
A
D
LEGEND:
F
E SABKHA AREA SANDY AREA
N
C
E
N 2 976 159.584 SANDY AREA CONTROL STATION U/G TO A/G PIPELINE TRANSITION
x
ABANDON GOAT YARD
11 BOREHOLE REDUCER
E 362 336.760
4.00m
11
14
12
12
1
11
11 3
12
1
11
SANDY AREA ROW
1
ROW BENCH MARK FLANGE
11
B
A O
SANDY ARE B
T
11
1 O LIGHT POST VALVE
11
3 B 13
1
2
ROW ROW
x
11
POWER POLE
12
SABKHA AREA
1
1
SANDY AREA SANDY AREA
x JUNCTION BOX VERTICAL PIPE BENDS
11
12
11
1
A
2
R
L
1 R FIRE HYDRANT BLIND FLANGE, PIPE END
1 O
A
F D
A E
SANDY ARE N
SANDY AREA TOB C MHMANHOLE HORIZONTAL FLANGE
E
KM KILOMETER MARKER
1
CATCH BASIN
5
SA 11 11
BK SABKHA AREA
SA HA 11 CO CLEAN OUT OIL WELL
BK AR 12
HA EA 11
554.810m 1
AR
EA E=362226.757
N=2976087.456
SABKHA AREA
WATER VALVE WATER WELL
2
1
E=361726.757
N=2976087.456 1 1
1
1
1
1
1
11 1
1
11 DROP INLET WATER INJECTION WELL
11
1
SURVEY LIMIT
11
TOB
12
N=2975387.456
E=362226.757
BO
T
O
SIGN BOARD WM WELL MARKER
1 B 1
B 2 1
11 1
1
11
SA
ND SA
ROAD SIGN PALM TREE
11
Y BK
SA
BO B
1
AR HA
11
BK 11
1
EA AR HA
EA
1
AR
1
EA TRAFFIC SIGNAL TREE
SA NDY A REA
11
1
11
11
SA GUARD POST, POST PLANTERS
1
ND
11
1
Y
AR
11
EA 11
BO
B UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER
1
SURVEY LI
1
11
11
SABKHA A REA
SURVEY LI
N 2 976 000 SA
BK
1 SABKHA AREA 1
1
11
SABKHA AREA
11
HA
AR
1
EA WATER TAP (HOSE BIB) GROUNDING BOX
1
11 1
MI
1
SABKHA AREA
1
T
E 362 000
11
11
MI
11 1
1
T
11
SA
HDPE LINING (TYP) GUY WIRE ANODE
11
BK
HA
AR
EA 11
11 11
1
1
11
N 2 975 500
N 2 975 000
11
1
STA 4+884.351
2
X FENCE G GENERATOR
11
11
12
11
11
11
11
11
WI-2 PT-03
SURVEY LIMIT
11
11
SA 11
BK 11
ROW
HA 1
AR
EA N 2 975 949.943 1
11
11
1
E 362 336.760
1
11
SA
BK ABBREVIATIONS:
12
11
11 HA
AR 11
EA
SA BKH A A REA
12
11
11
11 1
11
12
12
SANDY AREA
11
E 362 000
11 U/G UNDERGROUND FF FINISHED FLOOR
12 12
8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION
REFERENCE DRAWINGS
DWG. CONTROL FOR J.O. 10-09561-0002 CD-901976
STA. 5+000
STA. 6+000
ELEV. ELEV.
(m) (m)
TOE OF SLOPE
WI-2/PC-03
WI-2/PT-03
35 35
STA 4+554.81
STA 4+704.99
STA 4+757.58
STA 4+884.35
30 30
ELEV. 12.08m
ELEV. 12.05m
ELEV. 10.30m
ELEV. 10.31m
STA 5+906.61
STA 5+922.90
ELEV. 13.96m
ELEV. 13.66m
PROFILE
25 25
STA 5+053.19
STA 5+113.49
ISSUED FOR CONSTRUCTION
ELEV. 12.05m
ELEV. 11.39m
20 20
15 15
0 5 10 15 20 25
METERS
10 10
HORIZONTAL SCALE 1 : 2500M
REVISION VALIDATION
5 5
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
4+000 4+500 5+000 5+500 6+000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001
ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS CONTRACTOR SHALL ENSURE THAT THE PIPELINES
12/27/20 12/27/20 12/27/20 12/27/20
2000m SAES-L-460. BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL THE FENCED AREA AS PER STD. DWG. AB-036907.
2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 2 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
REFERENCED THEREIN.
DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.
CLASS
1
LOCATION
DESIGN
0.72
FACTOR
PIPE
8" API-5L GR. X60, SEAMLESS ( INT. HDPE LINED & EXT. FBE COATED)
MATERIAL
PIPE WT &
0.500" WT x 1798m
LENGTH
CURVE 04 DATA
{ =
E 362 500 WI-2 PI-04
R = 104.983m (105.000m GND)
N 2 973 177.470
N 2 974 500
N 2 974 000
N 2 973 500
T = 104.983m (105.000m GND)
E 362 336.760
L = 164.907m (164.934m GND)
POWER POLE
SANDY AREA
STA 7+730.786
JUNCTION BOX VERTICAL PIPE BENDS
SANDY AREA
WI-2 END OF SURVEY
1 13 13 FIRE HYDRANT BLIND FLANGE, PIPE END
1
1
11
2
ROW
2
11
ROW N 2 973 177.470
3
1
1
14 MHMANHOLE HORIZONTAL FLANGE
13
12
11
12
14
2
12
1
E 362 218.193
1
CATCH BASIN KM KILOMETER MARKER
3
11
12 SABKHA AREA
15
13
4
12
1
CO CLEAN OUT OIL WELL
SANDY AREA
SANDY AREA STA 7+738.00
WATER VALVE WATER WELL
12
(THRUST ANCHOR
M ARL ROAD
1
5
ROAD SIGN PALM TREE
N 2 973 177.470
N=2973914.414
E=362226.757
11
11
1
TRAFFIC SIGNAL TREE
13
12
4
17
13
1
15
E 362 211.190
12
1
13
11 2
1
3 1
1
GUARD POST, POST PLANTERS
1
12 1
15
3
4 1
17
14
16
2
SABKHA AREA
12
14
1
5
12
SURVEY LIMIT 1 SURVEY LIMIT
1 SURVEY LI
MIT UNDERGROUND UTILITY MARKER IRRIGATION SPRINKLER
SURVEY LI
MIT
15
11 11
1
E=362226.757
N=2974614.414
START
15
1
1
12
2
15
1
UTILITY METER IRRIGATION PIVOT
1
80.587m
12 16
1
1
14
1 16
16
WATER TAP (HOSE BIB) GROUNDING BOX
3
1
1
2
6
1
1
13
5
1
1
13
13
1
3
1
3
17
STA. 7+798.00 GATE GROUNDING ROD
SURVEY LIMIT
11
11
11
13
1
3
11
GUY WIRE ANODE
11
END OF WI-2
11
1
1
1
4
12
2
14
11
13
12
14
1
14
1
GUARD RAIL P PUMP
2
11
4
12
14
(SCRAPER
SURVEY LIMIT
11
SURVEY LIMIT
1
SURVEY LIMIT
6
VEHICLE BARRIER M MOTOR
3
1
12
1
5
16
16
13
SANDY AREA
15
1
BARRED TEE)
14
12
15
17
X FENCE G GENERATOR
1
12
6
4
SANDY AREA 1 15 SANDY AREA
1
3
2
1
SANDY AREA
1 1
N 2 973 177.470
1
1
6
15
11
SANDY AREA
11
13 SANDY AREA
13
1 16
1
4
11
1
2
SANDY AREA 15 4
3
BREAK FLANGES FOR 15
15
1
E 362 151.190
13
2
1
13
1
14
3
1
15
12
1
2
HDPE LINING (TYP) 1
1
13
13
ABBREVIATIONS:
M
1
AR
11 3
1
L 1 12
14
2 SANDY AREA
14 1
14
1
14
5 13
11 F/L FLOWLINE (PIPE) GND GROUND
15 1
13
2 14
15
SANDY AREA
12
11
3 11
13
12
12
13
16
13
13
5 4
1
U/G UNDERGROUND FF FINISHED FLOOR
12
1
12 14 14
12
3
1
DWG. CA-903037 & PIPING
12
4
1
1
x
4
12 12
P/L PIPELINE E ELECTRIC
x
x
13
E
NC
1 FE
1
1 13 4
1
6 x
12
M
12 1 AR x
5 T TELEPHONE
PLAN DWG. CA-903049 TC TOP OF CONCRETE/CURB
4
13
1
L 1
3
RO
AD
4 Mg T
AS ASPHALT PS PIPE SUPPORT
8" PWI FLANK (WI-2) PWI POWERED WATER INJECTION ELEV. ELEVATION
PIPELINE ANCHOR
CONSTRUCTION SCOPE OF WORK CE-901977
END OF WI-2
STA. 7+000
STA. 7+798
OPEN CUT
ELEV. ELEV.
40 40
END OF WI-2
WI-2/PC-04
WI-2/PT-04
SURVEY
PT-02
35 35
PI-02
Bush
STA 6+922.25
STA 7+027.27
STA 7+552.27
STA 7+730.79
STA 7+717.20
STA 7+170.19
30 30
ELEV. 12.48m
ELEV. 12.50m
ELEV. 11.90m
ELEV. 13.81m
ELEV. 13.17m
ELEV. 13.41m
STA 6+040.01
STA 6+051.53
STA 7+696.48
ELEV. 12.01m
ELEV. 11.98m
ELEV. 11.12m
STA 7+614.37
PROFILE
ELEV. 11.13m
25 25
20 20
ISSUED FOR CONSTRUCTION
TOP OF EXISTING GRADE
0 50 100 150 14-May-2023
200 250
15 15
0 5 10 15 20 25
METERS
10 10
HORIZONTAL SCALE 1 : 2500M
REVISION VALIDATION
5 5
THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
6+000 6+500 7+000 7+500
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-09561-0002-001
ITEM QUANTITY DESCRIPTION VALUES IN METER. SAES-L-450. CROSSINGS AS PER STD. DWG. AB-036891. PIPELINES, SHOULD THERE BE ANY SHALL SAES-X-400 AND SAES-X-700. ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
BE DONE BY HAND EXCAVATION. CONSTRUCTION
HORIZONTAL DATUM : 1994 HORIZONTAL ADJUSTMENT (AIN AL'ABD 1970) OSR MAB ORJ MSK
2. ROAD CROSSINGS SHALL BE INSTALLED AS PER 10. MINIMUM BEND RADII OF ALL FIELD BENDS, (PREFORMED 2. CP TEST STATION SHALL BE PROVIDED AT THRUST ANCHORS OUTSIDE
8"x0.500" WT, API-5L GR. X60, SMLS BENDS, SAG BENDS, OVER BENDS AND HORIZONTAL
CONTRACTOR SHALL ENSURE THAT THE PIPELINES
THE FENCED AREA AS PER STD. DWG. AB-036907. 12/27/20 12/27/20 12/27/20 12/27/20
1798m SAES-L-460.
2. VERTICAL DATUM : MEAN SEA LEVEL (M.S.L) ARE ADEQUATELY SUPPORTED DURING EXCAVATION.
( INT. HDPE LINED & EXT. FBE COATED) BENDS) SHALL BE IN ACCORDANCE WITH THE LIMITATIONS
EXISTING SUPPORTS THAT ARE DISTURBED DURING 3. THERMITE WELDING OF CABLES TO PIPELINE OR STRUCTURE SHALL BE REV.NO. DATE REVISION DESCRIPTION
1978 SAUDI ARAMCO VERTICAL DATUM (SAVD 78) 1994 ADJUSTMENT. 3. ALL MARL ROAD, CAMEL CROSSING AND RIG ROAD SET FORTH IN SAES-L-450.
CONSTRUCTION SHALL BE RESTORED OR REPLACED. IN ACCORDANCE WITH STANDARD DWG. AB-036381.
T 2 KILOMETER MARKER W/ TEST STATION PER DWGS. AB-036907 & AD-036973 CROSSINGS SHALL BE OPEN CUT AS PER 00 12/27/20 ISSUED FOR CONSTRUCTION
3. DATE OF SURVEY: JULY,AUGUST, 2017 11. CONTRACTOR SHALL CONSTRUCT CAMEL CROSSINGS AT
APPLICABLE STANDARDS. 4. CATHODIC PROTECTION BONDING FOR U/G PIPELINES CROSSINGS SHALL
16. PIPELINE WELDING SHALL BE IN ACCORDANCE WITH
2KM SPACING ALONG THE 8" WI-2 PWI FLANK UNLESS
27 KG (60 LB) MAGNESIUM ANODE INSTALLED 4. STATIONING IS GROUND DISTANCE IN METERS. DIRECTIONS AND SAES-W-012 AND INTERNATIONAL STANDARDS
PROVIDED AS PER SAES-X-400 & STD. DWG. AA-036674. JOB ORDER/EWO NO.
4 4. ADDITIONAL PERMANENT CAMEL CROSSINGS SHALL EXISTING MARL ROAD/CAMEL CROSSING EXISTS. THE NEW THIS REVISION IS NOT TO BE USED FOR
Mg REFERENCED THEREIN.
PER DWG. AA-036352 SHT. 001 & 002 DISTANCES SHOWN ARE GRID AZIMUTHS AND GRID DISTANCES. BE CONSTRUCTED ACROSS OTHER EXISTING BURIED CAMEL CROSSINGS SHALL BE ALIGNED WITH EXISTING 5. CATHODIC PROTECTION FOR TRENCHLESS CONSTRUCTION AND ASPHALT ROAD CROSSINGS
10-09561-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND ABOVEGROUND PIPELINES TO ALLOW ACCESS CAMEL CROSSING FOR OTHER PIPELINES IN THE CORRIDOR. SHALL BE PROVIDED USING MAGNESIUM ANODES AS PER STD. DWG. AA-036352.
5. ALL TOPOGRAPHIC ELEVATIONS WERE OBTAINED BY EDM METHODS.