PROGRAMACION CONCRETO DESDE EL 08/01/2024 AL 14/01/2024

MES ENERO
L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
DIA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
SECTOR CARMEN
concreto
SECTOR RECUAY 01 P-REC
concreto 7.50
SECTOR RECUAY 02
concreto
SECTOR COLON
concreto
SECTOR ANCASH P-ANC
concreto 11.5
SECTOR VISTA ALEGRE Z-VA
concreto 42
concreto 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 0.00 M3 19.00 M3 0.00 M3 42.00 M3 0.00 M3 0.00 M3

61.00 M3
DESCRIPCION
ZAPATAS
Z-CAR ZAPATAS (CALLE CARMEN)
Z-REC ZAPATAS (CALLE RECUAY)

PATANTALLA
P-COL PANTALLA (CALLE COLON)
P-REC PANTALLA (CALLE RECUAY 1)
P-CAR PANTALA (CALLE CARMEN)