9000 Boundary Line

Y
Z

X
Gate

222
20091

16
21721
Shore Line Rainy Season
3000

651
Double line - Double layer
Wooden Pole Runner: 96 m

Shore Line dry Season

94
Bundle Anchor Post:
5 nos. x 5 Wooden Poles/Bundle

TEMPORARY
10000
CRANE PAD

Crane
41777 (INSIDE RIVER)

28804

23500

428
Location of Pad

RO

97
Temporary 22000

-RO
Crane Pad
RCC Blocks
1500

Jett
120 cm x 180 cm

y
Water Level 40000

172
Dry-2.5 m BARGE 1
69

13
40 m X 12 m 158
Water Level
Dry-2.5 m

70 m
BA X 15
Y
Z

RG
E2
m
PLAN OF GPUFF TEMPORARY JETTY

X
Prepared by: Avant Logistics Ltd.
Project Name: Ghorashal Polash Urea Fertilizer Project
Drawing No.: TCP-01; Date: 12.08.2020