Section at A-A, 1:50

Cable Elevation, El1 = Gl + 0.30

Min. 30 Part Section Quantity Weight


Working Drawing
No [mm] [nos] Kg/pc total Kg
Backfilling must be done
after cable hoisting in layers Ri-Bar φ 20
of 30 cm thickness and good
compaction of each layers
1 l = 2900
16
2900
7.16 114.56R

required
Stirrup φ 12
150 50
2
bend stirrups
17 3.15 53.55R
80 x 80 cm
l = 3550
800
5 Bulldog Grips
3 Bulldog Bulldog Grip for Cable φ 26 mm
φ 26 mm
3 Grip
φ 26 mm
20 MS forged, according to ISI standard,
hot dip galvanized
1.10 22.00D

Trench excavation
required A = 190.11 kg. D = 22.00 kg. R = 168.11 kg.
Total transportation Weight, D+R Bulldog Grips Reinforcement Steel

50 ............ El2 = El1 - 3.70


180 680
2x(2+6)=16 Ri-Bars
1
φ 20 mm, l= 2900 860
full surface to be Standard Quantities
17 Nos. Stirrups protected by
2 Type of Construction
80x80, φ 12, c/c ~ 30 cm drystone pitching [m3]

Plan, 1:50 Concrete 1:2:4 13.50

Concrete 1:3:6 2.28

Broken Stone for Dry


2.50
Stone pitching

8 Ri-Bars Total 18.28


1
φ 20 mm, l= 2900

Center Line of Bridge

A A
5 Bulldog Grips HMG / Ministry of Local Development
3 DoLIDAR / Short SpanTrail Bridge Standard
for Cable φ 26 mm
Bridge Name:
No: Bank: Span:
Steel & Construction Drawing :

Main Cable Deadman Anchor


for Suspension Bridges, 4 Main Cables φ 26 mm
for all Soil Types in Flat Ground
Direct Cable Connection, c/c1 = 3.50 m
Anchor Type DA 7
860
Date : July 15, 2002 Drawing No. 44/2Ncon