Section at A-A, 1:50 B Detail at B 1:15

Cable Elevation, El1 = Gl + 0.30

Min. 30 Nut M36


Backfilling must be done in 5 10 12 1 13
layers of 30 cm thickness
and good compaction of each
layers is required Bulldog Grips
2 18
φ 32 mm

9 11
............ 8 3 Thimble
150 50 17
4 φ 32 mm

5 Nut & Bolts M16


10 12

Trench excavation
required

............ El2 = El1 - 3.55


200 640

14 Nos. Stirrups 2x4 = 8 Nos. Ri-Bars Standard Quantities


16 80x80 cm,φ 12 mm, 15
φ 20 mm, l = 2400
c/c ~ 30 Type of Construction [m3]
full surface to be
protected by Concrete 1:2:4 13.60
4 Nos. Ri-Bars to be inserted
14 drystone pitching
φ 16 mm, l = 1500 in Flats Plan, 1:50 Concrete 1:3:6 2.15

5x4 = 20 Flats 100/6 Broken Stone for Dry


2.20
for one Cable Anchor Stone pitching
5
Total 17.95

7 2x4 Nos. Ri-Bar


15 8
φ 20 mm 10 12 for Steel Part Numbers
6
6 refer to Drawing No. 42N
6
Center Line of Bridge
A A
8 HMG / Ministry of Local Development
7
DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
No: Bank: Span:
4 Steel & Construction Drawing :

Main Cable Deadman Anchor


14 Nos. Stirrups for Suspension Bridges, 2 Main Cables φ 32 mm
16
φ 12 mm for all Soil Types in Flat Ground
14
840 With Turn Buckle, c/c1 = 2.50 m
Anchor Type DA 2
Date : July 15, 2002 Drawing No. 42/3Ncon