Field Report
August
2021
CHAPTER –I 1
INTRODUCTION...................................................................................................................................1
1.1 GENERAL 1
CHAPTER -II 18
2.1 GENERAL 18
CHAPTER -III 53
3.1 GENERAL 53
3.2 CONSTRAINT....................................................................................................................................53
3.3 Conclusion 54
II
Table-2.1: Location and GPS coordinate of Candidate Bridges................................................................19
Figure-1.1: Location Map of Aathsaini/Chaur Khola Bridge....................................................................20
Figure-1.2: Google Map of Aathsaini/Chaur Khola Bridge......................................................................20
Table-1.3: Aathsaini/Chaur Bridge site information.................................................................................21
Figure-2.1: Location Map of Biureni Khola Bridge..................................................................................23
Figure-2.2: Google Map of Biureni Khola Bridge....................................................................................23
Table-2.3: Biureni Bridge site information...............................................................................................24
Figure-3.a.1: Location Map of Gyau Khola Culvert.................................................................................26
Figure-3.a.2: Google Map of Gyau Kholama Culvert...............................................................................26
Table-3.a.3: Gyau Kholama Culvert site information...............................................................................27
Figure-3.b.1: Location Map of Takchi Khola Culvert...............................................................................29
Figure-3.b.2: Google Map of Takchi Kholama Culvert............................................................................29
Table-3.b.3: Takchi Kholama Culvert site information.............................................................................30
Figure-3.c.1: Location Map of Sakya Khola Culvert................................................................................32
Figure-3.c.2: Google Map of Sakya Kholama Culvert..............................................................................32
Table-3.c.3: Sakya Kholama Culvert site information..............................................................................33
Figure-4.1: Location Map of Chhedaa Khola Pul.....................................................................................35
Figure-4.2: Google Map of Chhedaa Khola Pul........................................................................................35
Table-4.3: Chhedaa Khola site information..............................................................................................36
Figure-5.1: Location Map of Jhyali Khet Bridge......................................................................................38
Figure-5.2: Google Map of Jhyali Khet Bridge.........................................................................................38
Table-5.3: Jhyali Khet Khola site information..........................................................................................39
Figure-6.1: Location Map of Jhilke Khola Bridge...................................................................................41
Figure-6.2: Google Map of Jhilke Khola Bridge.......................................................................................41
Table-6.3: Jhyali Khet Khola site information..........................................................................................42
Figure-7.1: Google Map of Sutiya Nadi Pakki Pul...................................................................................44
Figure-8.1: Location Map of Kharaula Khola Pul.....................................................................................46
Figure-8.2: Google Map of Kharaula Khola Pul.......................................................................................46
Table-8.3: Kharaula Khola Pul site information.......................................................................................47
Figure-9.1: Location Map of Sutiya Nadi Pul...........................................................................................48
Figure-9.2: Google Map of Sutiya Nadi Pul.............................................................................................48
Table-9.3: Sutiya Nadi site information....................................................................................................49
Figure-10.1: Location Map of Nayan Kuloma Pakki Pul..........................................................................50
Figure-10.2: Google Map of Nayan Kuloma Pakki Pul............................................................................51
Table-10.3: Nayan Kuloma Pakki Pul site information.............................................................................51
III
ACRONYMS
BH : Bore hole
BS : Bikram Sambat
BP : Bridge Project
C/S : Cross Sections
Ch. : Chainage
Cum : Cubic meter
DDC : District Development Committee
DOR : Department of Roads
GoN : Government of Nepal
GWT : Ground Water Table
Ls : Lumpsum
L-X Sections : Longitudinal and Cross Sections
m : Meter
m3/s : Cubic meter per sec
Msl : Mean sea level
MT : Metric Ton
RCC : Reinforced Cement Concrete
RL : Reduced Level
Rm : Run meter
Sq km : Square Kilometer
Sqm : Square Meter
TBMs : Temporary Benchmarks
Tn : Ton
ToR : Terms of Reference
U/S : Up stream
D/S : Down stream
vpd : Vehicle per day
Nos : Number
M : Meter
IV
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
CHAPTER –I
INTRODUCTION
1.1 GENERAL
The field report has been prepared in accordance with the agreement made on 2078/02/14 between
Government of Nepal, Ministry of Physical Infrastructure and Transportation, Department of
Roads, Bridge Branch, Chakupat, Lalitpur and Sakhuwa Engineering Consultancy Pvt. Ltd. For
Feasibility study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed
Design of Bridges, Contract No.: BB-1123-DSD-076/077-14.
The report describes the design concepts and short descriptions relating to the proposed structure and its
major components e.g. superstructure, pier, foundations, river training/bank protection structures,
approach road etc. It includes tentative location of proposed foundations and arrangement of bridge
components along with comparison between the possible alternatives types.
To assess feasibility of the proposed bridge and find best bridge site;
To carry out the detailed engineering survey including sub-soil exploration to acquire bridge
design parameters and predict construction difficulties;
To carry out the detailed engineering design and prepare engineering drawings of proposed
bridge works and prepare detailed cost estimate(s).
In this regard the purpose of the report is to describe and report the overall condition of the River and
existing Structures. Bridges so that safe facility for the public could be provided. It also suggests on
maintaining and improving the existing condition of the bridge by correcting structural and functional
deficiencies associated with the bridge. The report will address the issues, problems identified and
inspected in the field visit.
1
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
2
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
CHAPTER -II
Field Visit & Methodology
2.1 GENERAL
Secondary data in the form of relevant past reports, maps were collected and reviewed which includes
SRN Map, topographical Map, District Map, Regional Map, geological of the region, seismic maps and
Google Map of the project area. All other relevant information regarding the bridge site area were
collected and studied. Technical feasible bridge locations were marked on Topographical maps of
1:50000/25000 for field visit and selection of bridge site. Consultation with Bridge Branch was made
prior to the field visit to identify the project area.
Consultant team comprises Project coordinator, Senior Civil Engineer, Senior surveyor and other relevant
support staff has made field visit during 2078-03-20 to 2078-03-25, all the Identified locations been
discussed with local people and stake holders available at the project area and best suitable bridge site
was identified and bridge alignment was selected. The main tasks carried out by the consultant team
during field visit are
Public Consultation, Interaction with stakeholder, officials to identify the project area, Selection
of best bridge site with social, economic, environmental justification along the route and
walkover survey and visual inspection was carried out
Selection of bridge alignment and record coordinate using GPS, Cross section of selected axis
using Auto Level was taken along with Preparation of freehand Plan of the bridge site, Access
the condition of approach road and collect information on general description of the alignment.
Conduct Preliminary geological & geomorphologic Investigation which includes, study the
topography, nature and structure of the surface soil, nature and structure of local as well as
regional geology related to the river, its catchments area of bridge sites and Visual justification of
soil strata and collection of soil sample to determine the basic parameter of top soil
Conduct Preliminary Hydrological Investigation which includes Visit and Collect information
required for river control, design, construction and maintenance of the bridge, general slope of
the catchment in both sides of the river, Bed slope of the river, Velocity and depth of flow,
Shifting of the river in the past at proposed bridge site and in its vicinity, Vegetation,
cultivation etc. of the catchments, Existence of reservoir's, Lakes etc. in the catchments, Existing
bridge or other hydraulic structures across the river in the vicinity of the proposed bridge site
with their details as much as possible.
Conduct Preliminary Environmental Investigation which includes assessment of risk at critical
stretches along the approach road alignment and bridge site.
Preliminary Investigation of available construction materials on sites
3
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
2.3 Methodology
2.3.1 General
Following Sequence Work had been followed for Collection of field data;
Preparation of inspection Report Forms as per DOR’s Bridge inspection Manual for Recording;
Desk Study
Arrange Team for carrying out different inspection Works
Mobilization of the team to site
The Field works for special inspection works of Bridges generally comprising of the following works
that had been carried out at the site;
The details of each candidate bridge along with GPS coordinate of each bridges site; types of river, site
conditions, bank to bank distance at select bridge alignment, condition of approach road etc and
photographs of proposed bridge sites are presented in section 2.5, the location of each bridge site is
tabulated below and Location Map is presented in Annex-II.
Table-2.1: Location and GPS coordinate of Candidate Bridges
4
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Chhedaa Khola Pul Barikot Na.Pa 2 & 1 Paanch Kariya Baarekot 28°56'19.69"N
4.
Raami Daanda Pul, Jumla Sadak, Jajarkot 82°14'19.57"E
5
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Co-ordinates
S.N Particulars Easting Northing Elevation
1. Survey Axis – Left bank 534626.846 3183544.767 254.325
2. Survey Axis –Right Bank 534645.916 3183567.698 255.922
3. BM 1 534619.324 3183527.377 255.559
4. BM 2 534392.146 3183610.138 252.918
5. Purposed BH-L 534627.955 3183541.462
Geographically the bridge site is located at 253 m above MSL. Location of the proposed bridge site is
shown in topographical map as well as in Google earth map below:
6
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
7
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Downstream
8
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Uptream
9
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Co-ordinates
S.N Particulars Easting Northing Elevation
1. Survey Axis – Left bank 542625.522 3181890.887 383.921
2. Survey Axis –Right Bank 542610.078 3181910.03 384.729
3. BM 1 542637.323 3181879.334 386.721
4. BM 2 542781.52 3181926.792 385.959
5. BM 3 542800.166 3181804.059 397.129
This bridge section falls under Strategic Road Networks (SRN) of code No:-67-F170-003.
Geographically the bridge site is located at 385 m above msl. Location of the proposed bridge site is
shown in topographical map as well as in Google earth map below:
10
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
11
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
12
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Upstream
Downstream
13
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Co-ordinates
S.N Particulars Easting Northing Elevation
1. Survey Axis – Left bank 620744.599 3201862.916 1694.235
2. Survey Axis –Right Bank 620725.456 3201837.412 1695.298
3. BM -1 620703 3201873 1696.825
4. BM-2 620498.8 3201857 1722.493
5. BM-3 620919.3 3201843 1683.612
This Bridge is located in Barokot Na.PA-02 & 01 of Jajarkot District. Geographically the bridge site is
located at 1695 m above msl. Location of the proposed bridge site is shown in topographical map as well
as in Google earth map below:
14
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
15
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Bridge Axis
16
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Approach Road
17
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Co-ordinates
S.N Particulars Easting Northing Elevation
1. Survey Axis – Left bank 616419.316 3178257.907 997.125
2. Survey Axis –Right Bank 616396.338 3178254.384 994.668
3. BM -1 616421.7 3178232 993.08
4. BM-2 616349.7 3178331 1002.231
5. BM-3 616501.2 3178132 981.708
Geographically the bridge site is located at 995 m above msl. Location of the proposed bridge site is
shown in topographical map as well as in Google earth map below:
18
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
19
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Bridge Axis
20
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Upstream
21
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Co-ordinates
S.N Particulars Easting Northing Elevation
1. Survey Axis – Left bank 574285.161 3192486.055 826.295
2. Survey Axis –Right Bank 574301.635 3192510.674 827.859
3. BM -1 574263.701 3192544.5 993.08
4. BM-2 574446.363 3192407.988 848.429
Geographically the bridge site is located at 835 m above msl. Location of the proposed bridge site is
shown in topographical map as well as in Google earth map below:
22
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
23
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Photographs of Proposed Bridge Site
Bridge Axis
24
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
25
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Co-ordinates
S.N Particulars Easting Northing Elevation
1. Survey Axis – Left bank 510357.537 3166732.466 153.933
2. Survey Axis –Right Bank 510350.334 319 2510.674 827.859
3. BM -1 510366.746 993.08
4. BM-2 574446.363 3192407.988 848.429
Geographically the bridge site is located at 148 m above msl. Location of the proposed bridge site is
shown in topographical map as well as in Google earth map below:
26
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
27
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Photographs of Proposed Bridge Site
Bridge Axis
28
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Geographically the bridge site is located at 160 m above msl. Location of the proposed bridge site is
shown in topographical map as well as in Google earth map below:
29
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Bridge Axis
30
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
Site Inspection
31
Field Report
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Design of Bridges:
Contract No: BB-1123-DSD-076/77-14
CHAPTER -III
Conclusion
3.1 General
The desk study of the proposed bridges was conducted and field visit was conducted by design team
members. Selection of bridge site and bridge alignment was carried out in consultation with local people
and stake holders at project area. During field visit preliminary hydrological survey, preliminary
geotechnical survey and preliminary topographical survey was carried out for planning of bridge.
Walkover survey to access the site condition was carried out and the preliminary information on soil
type, river catchments etc ware collected.
Based on the desk study and data information collected during field visit; hydrology, general geology
was conducted to established the field report. It is expected to get early approval of Field work to
schedule the soil exploration as well as to complete the assignment on time.
This report is submitted to the Bridge Project, Department of Roads for perusal and issue a go ahead
letter to the Consultant to take up detail engineering survey, soil investigation and detailed design of the
bridges, at the earliest so that the contract is completed within stipulated time.
32