Section at A-A, 1:75

Cable Elevation, El1 = Gl + 0.30

Backfilling must be done after Min. 30 Weight


Section Quantity
cable hoisting in layers of 30 cm Part No Working Drawing
thickness and good compaction [mm] [nos] Kg/pc total Kg
of each layers required Ri-Bar φ 20
1 l = 3200
16
3200
7.90 126.40R
............ 150 50
Stirrup φ 12

6 Bulldog Grips
2 l = 3550
19
bend stirrups
80 x 80 cm
3.15 59.85R

3
φ 32 mm 800

Trench excavation Bulldog Bulldog Grip for Cable φ 32 mm


required 3 Grip
φ 32
24 MS forged, according to ISI standard,
hot dip galvanized
1.30 31.20D

............ El2 = El1 - 4.30 A = 217.35 kg. D = 31.20 kg. R = 186.15 kg.
200 750 Total transportation Weight, D+R Bulldog Grips Reinforcement Steel

19 Nos. Stirrups 2x(6+2) = 16 Nos. Ri-Bars


2 1
80 x 80, φ 12 mm, φ 20 mm, l = 3200
c/c ~ 30 cm

Standard Quantities
Type of Construction [m3]
full surface to be
protected by
Plan, 1:75 drystone pitching Concrete 1:2:4 22.00

Concrete 1:3:6 2.55

Broken Stone for Dry


2.40
Stone pitching

8 Nos. Ri-Bars Total 26.95


φ 20 mm, l = 3200
1

Center Line of Bridge

A 6 Bulldog Grips A
3
for Cable φ 32 mm
HMG / Ministry of Local Development
DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
No: Bank: Span:
Steel & Construction Drawing :
19 Nos. Stirrups
2 Main Cable Deadman Anchor
φ 12 mm, c/c ~ 30 cm
for Suspension Bridges, 4 Main Cables φ 32 mm
for all Soil Types in Flat Ground
Direct Cable Connection, c/c1 = 3.50 m
Anchor Type DA 8
Date : July 15, 2002 Drawing No. 44/4Ncon
Produced by Nepal Swiss Association for International Cooperation, in partnership with His Majesty’s Government of Nepal, funded and supported by the Swiss Government (SDC Nepal). 46