Section at A-A, 1:50

Detail at B 1:15
Cable Elevation, El1 = Gl + 0.30 B
Nut M36
5 10 12 1 13
Backfilling must be done in
layers of 30 cm thickness
and good compaction of each Min. 30
layers is required Bulldog Grips
2 18
φ 26 mm

9 11
8 3 Thimble
17
............ 4 φ 26 mm

5 150 50

Nut & Bolts M16


10 12
4 Trench excavation
required

............ El2 = El1 - 3.10


180 575

12 Nos. Stirrups 2x4 = 8 Nos. Ri-Bar Standard Quantities


80x80 cm,φ 12 mm, 16 φ 20 mm, l = 2100
15 200
c/c ~ 30 Type of Construction [m3]
full surface to be
4 Nos. Ri-Bars to be inserted protected by Concrete 1:2:4 9.45
14
φ 16 mm, l = 1500 in Flats drystone pitching
Concrete 1:3:6 1.92

Plan, 1:50 Broken Stone for Dry


2.20
Stone pitching

Total 13.48

7 2x4 Nos. Ri-Bars


15 10 12 8
φ 20 mm 1
6 for Steel Part Numbers
6
refer to Drawing No. 42N
Center Line of Bridge 6

A 4x4 = 16 Flats 100/6 A


for one Cable Anchor 8
7 5

14
HMG / Ministry of Local Development
DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
No: Bank: Span:
4
Steel & Construction Drawing :
12 Nos. Stirrups
16
φ 12 mm, c/c ~ 30 cm Main Cable Deadman Anchor
14 for Suspension Bridges, 2 Main Cables φ 26 mm
for all Soil Types in Flat Ground
with Turn Buckle, c/c1 = 2.50 m
7.55
Anchor Type DA 1
Date : July 15, 2002 Drawing No. 42/1Ncon
Produced by Nepal Swiss Association for International Cooperation, in partnership with His Majesty’s Government of Nepal, funded and supported by the Swiss Government (SDC Nepal). 39