You are on page 1of 54

PUBLIC WORKS DEPARTMENT

RAJASTHAN

Consultancy Services
for
Preparation of Detailed Project Report for
CONSTRUCTION OF HIGH LEVEL BRIDGE
(ACROSS RIVER CHAMBAL)
NEAR JHAREL KE BALAJI ON KHATOLI
- KAITHUDA SAWAI MADHOPUR ROAD
MDR 51 IN DISTRICT KOTA.

FEASIBILITY REPORT

Prepared by
Thoughts Consultants Jaipur Pvt. Ltd.
1 DA 15, Jawahar Nagar, Jaipur- 302004
Phone : 0141- 4049864,9829055330
e mail : thoughts.jaipur@gmail.com
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

TABLE OF CONTENTS
1. INTRODUCTION ........................................................................................................................... 5
1.1. Background ......................................................................................................................... 5
1.2. Study Objectives.................................................................................................................. 9
1.3. Study Area and Coverage .................................................................................................... 9
1.4. Scope of Work ................................................................................................................... 11
1.5. Approach & Methodology................................................................................................. 12
1.5.1. Review of Past Reports ................................................................................................. 12
1.5.2. Reconnaissance Survey ................................................................................................. 12
1.5.3. Alignment Option Study and Selection of Final Option ................................................ 12
1.6. Structure of Report ........................................................................................................... 13
2. ALIGNMENT OPTION STUDY & TOPOGRAPHICAL SURVEY ....................................................... 14
2.1. Alignment option Study .................................................................................................... 14
2.2. Summary of option study.................................................................................................. 23
2.3. Topographical Survey ........................................................................................................ 26
2.4. Purpose: ............................................................................................................................ 26
2.5. Methodology:.................................................................................................................... 26
2.6. Establishment of Temporary Bench Mark: ....................................................................... 27
2.7. Leveling: ............................................................................................................................ 27
2.8. Detailed survey: ................................................................................................................ 27
2.9. Longitudinal Section and Cross Sections:.......................................................................... 28
2.10. Ground Verification........................................................................................................... 28
2.11. Preparation of Base Plan:.................................................................................................. 28
2.12. Site visit ............................................................................................................................. 30
2.13. GEOTECHNICAL INVESTIGATION ....................................................................................... 32
3. PROPOSED STANDARDS AND GAD............................................................................................ 34
3.1. SPECIFICATION FOR MATERIAL ......................................................................................... 34
3.2. Loads and Forces to be considered in Design ................................................................... 35
3.3. Design Methodology ......................................................................................................... 41
3.4. GAD of Proposed Elevated Road ....................................................................................... 45
4. CONCLUSIONS & RECOMMENDATIONS AND WAY FORWARD................................................ 51
4.1. CONCLUSIONS & RECOMMENDATIONS ........................................................................... 51
4.2. WAY FORWARD ................................................................................................................. 52

Page i
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

List of Tables
Table 2-1: Summary of Option Study ................................................................................. 24

Page ii
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

List of Figures
Figure 1-2: Regional Connectivity ...................................................................................... 7
Figure 1-3: Location of Project............................................................................................. 8
Figure 1-4: Study Area............................................................................................................ 10
Figure 2-1: Option-I (900m shifted from Existing Alignment towards
downstream side) ....................................................................................................................... 15
Figure 2-2: Option-II (1200m Shifted from Existing Alignment towards
Downstream Side) ...................................................................................................................... 18
Figure 2-3: Option-III (400m Shifted from Existing Alignment towards
Downstream side) ....................................................................................................................... 21
Figure 3-1: Proposed Cross Section for Bridge Portion ............................................... 46
Figure 3-2: Proposed Cross Section of approaches Road ........................................... 47

Page iii
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

List of Annexure
Annexure 2-1: Base Map of Project Area ..................................................................... 29
Annexure 3-1: General Arrangement Drawings for Proposed HFL BRIDGE
.............................................................................................................................................................. 48

Page iv
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

1. INTRODUCTION

1.1. BACKGROUND

Rajasthan is the largest State in the country, with difficult terrain


comprising desert, forests, mountains, tribal belt, ravines and a long
international border. Kota is a city having Chambal River crisscrossing it’s
geographical spread. According to available records, grandson of the
chief of Bundi Jait Singh, founded Kota by attacking and ousting some
Bhils of Koteah clan from the place, east to Chambal, which he named as
Kotah (Kota). Another version is that Jait Singh captured Akelgarh in
Vikram Samvat 1321 (1264 A.D) and occupied Kota, subsequently used
as a pargana attached to the Jagir of Bundi.

A separate district by the name 'Kota' came into being when former Kota
and Tonk States had joined the former Rajasthan in March, 1948 and
integrated into the United States of Rajasthan in the year 1949. In
addition to a large area of Kota State, the district included certain areas
of the former Jhalawar State (viz. Kirpapur) and Tonk State, namely
Chhipa barod and Sironj. As against this, some areas of Kota State, viz.,
Asnawar, Aklera, Khanpur, Manohar Thana and Bakani were detached to
form part of the new Jhalawar district.

Inside the Kota Garh, or City Palace, the Maharao Madho Singh Museum
exhibits miniature paintings and antique weapons. South, along the river,
tranquil Chambal Garden has a pond with crocodiles. Northeast, 18th-
century Jagmandir Palace sits in the middle of Kishore Sagar Lake. Seven
Wonders Park includes mini replicas of the Eiffel Tower and Taj Mahal.

The Chambal River is a tributary of the Yamuna River in central India,


and thus forms part of the greater Gangetic drainage system. The river
flows north-northeast through Madhya Pradesh, running for a time
through Rajasthan, then forming the boundary between Rajasthan and
Madhya Pradesh before turning southeast to join the Yamuna in Uttar
Pradesh state. During rainy season Chambal creates discontinuity
between the Sawai Madopur-khatoli-Itawa towns. The Public Works
Department has constructed MDR 51road between Khatoli Kaithuda and
Sawai Madhopur Road. A submersible Bridge at Jharel ke balaji is the link
across Chambal river on this MDR 51. But the link gets submerged during
every monsoon disrupting the connectivity of locals.

Construction of HFL Bridge at this location is being demanded for a long


time by the local habitants. This Bridge will provide an all-weather
connectivity for vehicular & Pedestrian movement. The construction of
this bridge shall play vital role in saving fuel and time due to shorter

Page 5
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

distance. It shall result in increased economic activities.

In view of this Public Works Department has decided to construct a high-


level bridge on KHATOLI- KAITHUDA SAWAI MADHOPUR ROAD on
Chambal River Near Khatoli at Jharel ke balaji.
The location Map of the proposed HFL Bridge is given in following figure.

Page 6
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Figure 1-1: Regional Connectivity

Page 7
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Figure 1-2: Location of Project

Page 8
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

1.2. STUDY OBJECTIVES

The Public Works Department is desirous of taking up the Construction of


High-Level Bridge on Khatoli – Kaithuda Sawai Madhopur Road on Chambal
River near Jharel ke Balaji in Kota District”. With the above stated objective,
M/s Thoughts Consultant Private limited Jaipur has been mandated the task
to carry out Techno-Economic Feasibility study and Detailed Project Report of
High-Level Bridge on Bridge on Khatoli – Kaithuda Sawai Madhopur Road
(MDR-51). To achieve the same, in the feasibility report the basic traffic
studies, topographical and subsurface soil investigations have been conducted
with a view to attain optimum level of understanding in planning. Accordingly,
the GAD plans have also been prepared.

1.3. STUDY AREA AND COVERAGE

The study area includes the road stretch near Jharel ke Balaji on Khatoli-
Sawai Madhopur Road. The study area and coverage are given in the
following figures

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Figure 1-3: Study Area

Page 10
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

1.4. SCOPE OF WORK

The Scope of work includes:

 The Consultant shall perform all necessary planning, engineering and


economic analysis, field investigations and related works as described
herein with due care and diligence to attain the objectives of the
study.

 In conduct of the work, the Consultant shall contact the Public Works
Department (PWD), Itawa and other Government Departments and
agencies responsible for planning and rural development, in
Rajasthan.

 The Consultant shall carry out a reconnaissance survey and


topographic survey for the bridge.

 The Consultant shall conduct and provide a complete description of


the features of the area.

 The Consultant shall identify sources of suitable materials for the


works including embankment fill, unbound pavement materials,
aggregates, sand, quarry products, cement, bitumen, steel and water
in sufficient quantity and quality to meet the requirements of the
Project.

 The Consultant shall determine the type total traffic volume on


bridge and volume of divert-able traffic for the Bridge by analyzing all
existing statistical data, and by conducting and analyzing traffic
counts and origin - destination studies.

 Based on the surveys, Hydrological and geotechnical investigations,


the Consultant shall develop all possible preliminary designs.

 The Consultant shall prepare preliminary estimates of quantities with


an accuracy of +/- 10% of the works under Phase 1 of the services.

 The Consultant shall be responsible, however, for the analysis and


interpretation of all data received, undertake other studies to validate
the data and give conclusions and recommendations derived from
these data.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

 All lands required for temporarily or permanent acquisition for the


road shall be clearly marked on Revenue (Village) Survey Maps with
Survey numbers, Part numbers, Structure details, Khata holder so
that land acquisition can be speedily proceeded with.

1.5. APPROACH & METHODOLOGY

For preparation of Feasibility and GAD report the following broad


approach and Methodology has been adopted.

1.5.1. Review of Past Reports

The consultant has reviewed the Proposal over Chambal River Near proposed
location of bridge location.

1.5.2. Reconnaissance Survey

♦ The detailed ground reconnaissance has been taken up immediately


after the study of maps and other data.

♦ Type and location of existing utility services (e.g. Fiber Optical Cable,
O/H and U/G Electric, Telephone line, Water mains, Sewer, Trees
etc.) has been looked into.

♦ The data derived from the reconnaissance surveys are utilised for
planning and programming the detailed surveys and investigations.
All field studies including the traffic surveys should be taken up on
the basis of information derived from the reconnaissance surveys.

1.5.3. Alignment Option Study and Selection of Final Option

♦ Formulation of various alignment options


♦ Comparison and selection of final option
♦ Topographic Survey and Base Map preparation
♦ General Arrangement of Final option
♦ Proposed Cross Sections
♦ Key Features of GAD
♦ Proposed design Standards

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

1.6. STRUCTURE OF REPORT

The Report has been organized in five chapters:

Chapter 1: Introduction: Background, objective of the study and


scope of work

Chapter 2: Alignment option study and Topographic Survey: The


details of the alignment option study and topographic survey their
methodology and inferences derived have been discussed in Chapter 2.

Chapter 3: Design Standards and GAD: The project requirements,


site constraints, geometric and structural design considerations, General
Arrangement Drawing (GAD) for recommended option for Elevated road
are presented.

Chapter 4: Conclusion and Recommendations: The chapter


summarizes the project with various options worked and final
recommendations.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

2. ALIGNMENT OPTION STUDY &


TOPOGRAPHICAL SURVEY

2.1. ALIGNMENT OPTION STUDY

The consultant has carried out the alignment option study for selection
of the best alignment for the proposed HFL Bridge. The consultant has
examined three options. The brief of these options are as follows

Option-I: (1200m shifted from Existing Alignment towards


downstream side): The proposed Alignment starts from Y junction
near Dharampuri village, run across the Chambal River and ends at T
junction near Gurla Village. The proposed Alignment is a green field
Alignment and will require Land Acquisition. The length of this option is
approximately 2750.0 m. It includes 1230.0 m of Approaches on both
side and 1520.0 m of Bridge Portion.

The existing Alignment has many deficient curves, due to which design
speed as per IRC-SP-73-2018, won’t be achieved on this stretch hence a
Greenfield Alignment is proposed to overcome these difficulties. The
start point, end point and alignment are given in the following figures.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Figure 2-1: Option-I (900m shifted from Existing Alignment


towards downstream side)

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Advantage

 Length of the bridge is lesser as compared to other options.

 Smooth movement of vehicle will be achieved.

 Habitation areas won’t be affected.

Limitation

 Proposed alignment requires more Land Acquisition than option-2.

 ‘S’ curve exists on alignments towards khatoli village.

 Crosses existing habitations and may lead to local resistance

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Option-II: (900m shifted from Existing Alignment towards


downstream side): The proposed alignment starts from Y junction
near Dharampuri village, run across the Chambal River and ends at T
junction near Gurla Village. The proposed alignment is a green field
alignment and will require Land Acquisition. The length of this option is
approximately 2644.0 m. It includes 1084.0 m of Approaches on both
sides and 1560.0 m of Bridge Portion.

The existing alignment has many deficient curves, due to which design
speed as per IRC-SP-73-2018, won’t be achieved on this stretch hence a
new Greenfield alignment is proposed to overcome these difficulties. The
start point, end point and alignment are given in the following figures.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Figure 2-2: Option-II (1200m Shifted from Existing Alignment


towards Downstream Side)

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Advantage

 Smooth movement of vehicles will be achieved.

 Habitation areas won’t be affected.

 Length of approaches will reduce on both sides as compared to the


existing Alignment

 Length of bridge will be smaller than option-3 & existing alignment.

Limitation

 Land acquisition is required

 Length of bridge will be higher than option-1.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Option-III: (400m shifted from Existing Alignment towards


downstream side): The proposed Alignment starts from Y junction
near Dharampuri village, run across the Chambal River and ends at T
junction near Gurla village. The proposed Alignment is a green field
alignment and will require Land Acquisition. The length of this option is
approximately 3050 m. It includes 1330.0 m of Approaches on both side
and 1330.0 m of Bridge Portion.
The required ROW as per Two Lane Configuration of Bridge is not
available throughout the road stretch though Approaches of the option
exist on the existing alignment. The start point, end point and alignment
are given in the following figures.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Figure 2-3: Option-III (400m Shifted from Existing Alignment towards Downstream side)

Page 21
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Advantage

 The proposed alignment has lesser land acquisition among all


options.

Limitation

 The approach length required is maximum among all options.

 Alignment exists on curved portion of river. River is meandering at


this location.

 The Alignment shall have some deficient curves so as to reduce


land acquisition.

 The proposed Alignment has highest bridge length as compared to


other options.

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

2.2. SUMMARY OF OPTION STUDY

Page 23
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Table 2-1: Summary of Option Study

Option-I Option-II Option-III

SN Particulars (1200m shifted from (900m shifted from (400m shifted from
Existing Alignment Existing Alignment Existing Alignment Towards
Towards Downstream) Towards Downstream) Downstream)

Span Arrangement.
1 38x40.0 =1520.0m 39x40.0= 1560.0m 43x40.0=1720.0m
(n x Span length m = Via
duct Length(m))

2 Approach Length (m) 1230.0 1084.0 1330.0

3 Total Length (m) 2750.0 2644.0 3050.0m

Approximate Civil Cost


4 103.00 102.0 117.00
(In Crs.)

Page 24
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Land Required
(ROW 45m)
5 Total (Ha) 10.26 8.84 6.70
(Hectares.)

6 Approximate Land Cost (Crs) 7.50 5.75 5.4

Approximate Total Project


7 Cost Including Agency Charges 132.00 130.15 122.4
(Crs)

Shortest connectivity,
Medium connectivity shortest Longest connectivity Longest
Salient Features of Different medium Via ducts length,
8 Via ducts Length, Deficient Via ducts Length, Improved
Options Improved Curves,
Curves, Lesser Cost Curves, Higher Cost
comparable Cost

Options II recommended over Options I & Option III for following reasons

1. Option III is Costliest with no extra ordinary advantages hence rejected.


2. Cost of Option I is little lesser than Option II but has many disadvantages over Option II as follows
a) Non Via Duct Approaches shall have to be constructed over erodible strata which may get damaged
during high flooding condition as river has tendency to meander in that direction
b) Presence of sharp curve in Approach would reduce vehicular speed uptp 30 km/hr, not desired
c) There are some Existing structures in Alignment Option I, which will have to be removed and may lead
to resistance from locals hampering progress of the Project

Page 25
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

2.3. TOPOGRAPHICAL SURVEY

2.4. PURPOSE:

The Survey was carried out with the objective of:

i) Identification of Alignment of the Elevated Road.

ii) Identification of the following:

(a) Geometry of approach roads forming the approach of HFL


Bridge.

(b) Identifying obstructions / constraints in improvement


alignment.

2.5. METHODOLOGY:

The topographical survey consisted of the following activities:

• Establishment of temporary Bench Marks.


• Total Station traverse
• Leveling
• Detailed Survey and rendering
• Preparation of Longitudinal sections
• Ground verification
• Preparation of Base Plan

Horizontal Control Points were fixed by carrying out total station


traverse. The traverse points were fixed generally at 150 – 200 m
interval along the proposed project section. The traverse was closed
back to the originating points and the angular and linear variations were
noted and found to be within tolerance limit. The traverse was adjusted
and coordinates were calculated for each of the traverse points.

On completion of traverse survey the Bench mark was transferred to


these traverse points using Auto Levels. As there was no known bench
mark available near the site, the level of road was used as reference
levels for carrying out the survey.

Page 26
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

The work of carrying out a detailed engineering topographic survey was


started on completion of fixing of vertical and horizontal control points.

Location of trees with their details was noted. Course of approach


roads, streets, lanes, footpaths, drains, nallahs, location of residential
areas, adjacent to built up line, religious places, parks, green areas,
monuments, memorials, vacant lands etc. were collected in the detailed
survey.

Details of crossing spans of power lines, telephone / telegraphic lines


and overhead crossings including height of tower and vertical clearance
were noted. Locations and details of colonies, vertical clearance to
power line, overhead crossings were recorded. Levels at important
locations like road junctions and ground undulations were noted. Proper
coding method was adopted for each feature for plotting of data and
preparation of maps.

After the collection of field data, the measured data was downloaded to
the site computer and the plotting of survey features was done on daily
basis. All equipments used were calibrated before starting the survey
work.

2.6. ESTABLISHMENT OF TEMPORARY BENCH MARK:

With help of GTS Bench Marks in the close vicinity, suitable temporary
bench marks were established. In the stretch of existing road section on
both sides, the surveys were carried out with reference to such
established temporary bench marks. The locations of the temporary
benchmarks are distinctly marked on the Base Plans.

2.7. LEVELING:

The levels were connected to temporary benchmarks as stated above.


The leveling commenced from selected points and closed at the same
point.

2.8. DETAILED SURVEY:

This envisaged recording of all topographical features including trees,


utility services etc. for corridor consisting of approach road strips within
the available section. At curves, the survey was extended to full land
width available in the sections envisaging the curves. All the

Page 27
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

topographical features along the road sections were recorded to


facilitate preparation of Base Maps covering all plan features near the
existing road.

2.9. LONGITUDINAL SECTION AND CROSS SECTIONS:

The levels for longitudinal section were taken at every 25 m at the


centre line of the existing road and the cross-section levels were taken
at these locations with three readings on either side of the centre line.

2.10. GROUND VERIFICATION

On completion of the detailed survey and plotting the same on the


mapping software a check plot was drawn and all details as covered in
the detailed survey were verified on the ground to guard against any
omission or other such discrepancy.

2.11. PREPARATION OF BASE PLAN:

A Base Plan model of surveyed over was generated in design software


(Auto Plotter) using three-dimensional survey data recorded in
electronic field book. Base map of Study Area is attached at Annexure
3.1.

Page 28
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Annexure 2-1: Base Map of Project Area

Page 29
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

2.12. SITE VISIT

Page 30
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Page 31
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

2.13. GEOTECHNICAL INVESTIGATION

Page 32
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Page 33
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

3. PROPOSED STANDARDS AND GAD

3.1. SPECIFICATION FOR MATERIAL

a) Concrete

The grade s of concrete has been either equal to or higher than those
prescribed in IRC: 112:2019.

i) Concrete Grades for various structural elements.

Grade of concrete in various structural elements has been for


moderate conditions of exposure.

Superstructure

PSC I Girder M45

RCC Crash Barriers M40

Substructure

RCC substructures and foundations M40

All PCC nonstructural members M15

Pedestals for bearings Pot M40

POT-PTFE Bearings

b) Steel

This shall conform to provisions given in IS: 1786, IS: 423 (Part I).

i) Reinforcement Steel

This will be;

High yield strength deformed bars conforming to Fe 500 TMT.

Page 34
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

c) Bearings

i) POT cum PTFE Bearings

POT cum PTFE bearings shall be provided where we have to


cater to large loads.

d) Expansion Joints

Elastomeric strip seal type expansion joints shall be provided on all the
bridges as per Clause No. 2607 of MORT&H specification for road and
bridge works and interim specifications for expansion joints issued
subsequently vide MORT&H’s letter no. RWINH-34059/l/96-S&R dated
25.01.2001 and addendum thereto circulated vide letter of even no.
30.11.2001, in case of bridges with smaller spans slab seal type
expansion joint shall be provided.

3.2. LOADS AND FORCES TO BE CONSIDERED IN DESIGN

Vertical Loads

a) Dead Loads

Following unit weights shall be assumed in the design as per IRC


Codes.

Reinforced Concrete - 2.5 t/cu.m

Plain Cement Concrete - 2.2 t/cu.m

Structural steel - 7.85 t/cu.m

Dry Density of Backfill Soil - 2.07 t/cu.m

Saturated Density of Backfill Soil - 2.2 t/cu.m

b) Superimposed Dead Loads

Page 35
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Wearing Coat: 65mm thick asphaltic concrete with total 2.2


t/cum (1.1 tm for 7.50m wide c/way
including allowance for an overlay).

Crash barriers: From design (i.e. 1.0 t/m per side)

c) Live Loads

Carriageway Live Loads: The following load combinations will be


considered in the analysis and whichever produces the worst effect will
be considered.

- One/Two/Three lanes of Class A.

- One lane of IRC Class 70R (wheeled tracked).

- One lane of IRC Class 70R (wheeled) with one lane of IRC Class A

- One Lane of Special Vehicle(SV) 385

- Minimum clear distance between 70R vehicle and Class A vehicle,


when placed side by side in combination, shall be 1 .2m for design.

- Resultant live load stresses shall be reduced by 10% in case all the
three lanes are loaded i.e. in case of three lanes of IRC Class ‘A’ or
one lane of IRC Class 70R with one lane of IRC Class A.

- Impact factor shall be as per Cl. 211 of IRC:6 for the relevant load
combinations. For simplicity in design, Impact factor for continuous
structures shall be calculated for the smallest span of each module
and used for all the spans of that module.

d) Horizontal Forces

i) Longitudinal Forces due to live load

Following effects shall be considered in the design.

- Braking forces as per the provision of Cl. 214 of IRC: 6.

- Distribution of longitudinal forces due to horizontal


deformation of bearings/frictional resistance offered to
the movement of free bearings as per CI. 214.5 of IRC:
6.

Page 36
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

ii) Horizontal Forces due to Water Currents

The portion of bridge, which may be submerged in running


water, shall be designed to sustain safely the horizontal
pressure due to force of water current as per the stipulations of
Cl. 213 of IRC:6.

iii) Earth Load

1. Earth forces shall be calculated as per the provisions of


CI. 217 of IRC:6 assuming the following soil properties:

Type of soil assumed for backfilling As per Appendix 6 of [RC: 78 with dry
density of 2.07 t/cu.m and submerged
density of 1.2 t/cu.m.

Angle of Internal Friction Ф= 30.0

Angle of Wall Friction δ=20.0

Coefficient of Friction ‘p.’ at base tan (Ф), while Ф is the angle of internal
friction of substrata immediately under the
foundations.

2. Live load surcharge shall be considered as per the


provisions of Cl. 714.4 & Cl. 715.1.5 of IRC: 78 i.e.
equivalent to 1.2m height of fill in case of abutments and
return/wing walls and 0.6m height when there is .no live
load on the span.

iv) Centrifugal Forces

For the road bridges situated on curve centrifugal forces shall


have to be calculated as per the provisions of Cl.215 of IRC: 6
for a design speed applicable at horizontal curves.

v) Wind Effect

Structures shall be designed for wind effects as stipulated in Cl.


212 of IRC: 6. The wind forces shall be considered in the
following two ways and design shall be governed by the one
producing the worst effect.

Page 37
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

a. Full wind forces at right angles to the superstructure

b. 65% of wind force as calculated in (i) above acting


perpendicular to the superstructure and 35% acting in
traffic direction.

vi) Seismic Effect

The road stretch is located in Seismic Zone-II as per the revised


seismic map of India (IS: 1893-2002). The seismic forces will be
coefficient method as suggested by the modified clause for the
interim measures for seismic provisions (CI.222 of IRC: 6-2014)
published in Indian Highways, January 2003.

e) Other Forces/Effects

i) Temperature Effects

a. The bridge structure/components i.e. bearings and


expansion joints, shall be designed for a temperature
variation of± 25 degree C considering extreme climate.

b. The superstructures shall also be designed for effects of


distribution of temperature across the deck depth as
given in Fig. 10 of IRC6-2014, suitably modified for the
surfacing thickness.

Temperature effects shall be considered as follows:

(i). Effects of non-linear profile of temperature shall be


combined with 50% live load and full value of ‘E’ shall be
considered.

(ii). Effects of global rise and fall of temperature shall be


combined with 100% live load and full value of ‘E’ shall
be considered.

ii) Differential Shrinkage Effects

A minimum reinforcement of 0.2% of cross sectional area in the


longitudinal direction of the cast-in-situ slab shall be provided to
cater for differential shrinkage stresses in superstructures with

Page 38
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

cast-in-situ slab over precast girders as per Cl 605.2 of IRC:22-


2015.

However, effects due to differential shrinkage and/or differential


creep shall be duly accounted for in the design. Additional
reinforcements in the concrete deck shall have to be provided
wherever found necessary.

iii) Construction Stage Loadings/Effects

A uniformly distributed load of 3.6 KN/m2 of the form area shall


be considered to account for construction stage loadings in the
design of superstructure elements, wherever applicable, as per
Cl. 4.2.2.2.2 of IRC: 87-1984.

iv) Buoyancy

100% buoyancy shall be considered while checking stability of


foundations irrespective of their resting on soil/weathered
rock/or hard rock. However, the maximum base pressures shall
also be checked under an additional condition with 50%
buoyancy in cases where foundations are embedded into hard
rock. Pore pressure uplift limited to 15% shall be considered
while checking stresses of the substructure elements.

f) Load Combinations to be considered in Design

All members shall be designed to sustain safely the most critical


combination of various loads and forces that can coexist. Various load
combinations as relevant with increase in permissible stresses
considered in the design shall be as per Cl. 202 of IRC:6 and Cl. 706 of
IRC:78.

In addition, `the stability of bridge supporting two superstructures


(with an expansion joint) shall be checked under one span dislodged
condition also.

g) Exposure Condition

Moderate exposure conditions shall be considered while designing


various components of the bridge.

Page 39
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

h) Design Codes

Design of all components of structures has been carried out in


accordance with the provisions of the following Standards / Codes of
Practices:

• Foundation

(i) IRC:6-2017

(ii) IRC:78-2014

(iii) IRC:45-1972

(iv) IS:2911-2010

 Substructure

(i) IRC:6-2017

(ii) IRC:78-2014

 Superstructure

(i) IRC:6-2017

(ii) IRC 112-2011

 Bearings

(i) IRC: 83-2015 Part-I for metallic bearings

(ii) IRC: 83-Part-II-2015 for elastomeric bearings

(iii) BS: 5400 for POT/PTFE bearings

(iv) IRC: 83 Part III 2002 for POT, POT cum PTFE, PIN and
Metallic Guide

(v) Bearing (Provision of IS: 1893 will also be considered


wherever relevant

 Expansion Joints

Page 40
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Ministry’s Interim Specifications contained in letter no. RW/NH-


4059/1/96- S&R dated 30-11-2000 and 25.01.2001 will be kept in
view while deciding the type of expansion joints.

 Protection Works

(i) IRC: 89-1997

I) Load combinations

The various load combinations to be considered will be as per the


provision of IRC: 6-2017

3.3. DESIGN METHODOLOGY

Superstructure

The superstructure is designed for various combination of Class A load and


70R load, severest of these load combinations are chosen for design. The
method of analysis and design of superstructure depends on type of
superstructure. Grillage model is adopted for I Girder for longitudinal live load
analysis. The superstructure is analyzed in the longitudinal direction for
bending moment and shear, corresponding reinforcement is provided for it. In
the transverse direction deck slab is analyzed as continuous over girders and
effect of differential bending of girders is also considered for deck slab design.
The superstructure is also designed for temperature stresses, resulting from
maximum and minimum temperature variations.

The superstructure shall be RCC solid slab for spans upto 10.0 m. For spans
ranging from 10.0 m to 25 m RCC T-girder and slab shall be provided. For
spans from 25m to 40m the PSC I Girder. For spans above 40m the PSC Box
girder shall be provided.

Based on the loads mentioned earlier, the bending moments and shear forces
are worked out at the selected sections. Distributions of live Load on
longitudinal beams are worked out (in case of T-beam and slab type of
superstructure). The sections are then designed as reinforced concrete
sections subjected to the applied moments and shear forces. The design
moments, shear forces and joint displacements can be worked out using
Grillage method of analysis in STAAD-Pro, MIDAS Civil, based on which
structural design of various elements and checking of adequacy of different
section can be done.

Page 41
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

The RC Solid slab superstructures shall be analyzed using Grillage analogy


method to obtain internal moments and forces based on which structural
design shall be carried out.

Modelling & analysis of Superstructure

Modelling is substituting the actual structure to an equivalent mathematical


structure, which is amenable to computer analysis. In modelling, the
properties of the prototype are required to be correctly assessed and assign
to corresponding components of the model. Similarly support conditions are
based on deformations permitted at the supports. Line Element modeling
offers a good choice for a large variety of super structure forms.

The analysis is accurate only if the prototype is modelled accurately. We will


pay special attention to the modelling / idealization aspect and if necessary,
will revise our model for greater accuracy.

We have suitable software for the analysis of bridges of all types for various
IRC live loading, permanent dead loading and construction stage loading.
These will be used in the analysis.

Design of Elements above Deck Level

The miscellaneous elements such as kerbs and parapets/railing are designed


as reinforced concrete section for the loads and forces as per Cl. 209 of IRC:
6. -2017.

Design of Bearing

The loads transferred from the superstructure to the bearings shall be taken
from the earlier analysis of superstructure. Short- and long-term deformations
shall be computed for the temperature, shrinkage and creep of concrete.

POT-PTFE bearings shall be designed as per IRC: 83 (Part III) for these
effects as reinforced multi-layer neoprene bearings. However, design loads
and movements are to be supplied to the manufacturer to enable him to
manufacture these bearings. The manufacturer’s details & design have to be
got checked to ensure compliance with the design requirements.

Page 42
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Substructure and Foundation

Piers

Pier will be circular type with cantilever fixed at base, which is taken as top of
foundation. The sections at various levels will be checked as sections
subjected to axial thrust and bi-axial bending. In addition to dead load and
live loads from superstructure, the pier substructure and its foundation will be
designed for the loads due to seismic/wind and water current forces as
appropriate.

Abutment

Abutments will be of non-spill through type. These shall be designed resting


on Pile foundations, pile foundations or well foundations as per requirement
and may have cantilever returns at top. In case the cantilever returns become
too long independent RCC retaining walls shall be provided. For height of
abutments greater than 8.0 m counter forts shall be provided.

Pile foundation for piers and abutments shall be designed in reinforced


concrete or some other suitable material. The stability checks shall be carried
out as per relevant IRC Codes.

Foundation

Foundation of bridge is to be conceptualized after evaluation of subsoil data


such as type of soil and its safe bearing capacity at foundation level for
abutment pier/return-wall and footings. Thereafter suitable type of
foundations is to be provided with respect to soil and type of superstructure.
Adequacy of the size and depth of foundation will be ensured for the
satisfactory performance of the structure. The structural design of the
foundation is to be designed as per the latest computerized modeling.
Particular attention is paid to stability checks and corresponding safety
factors.

Open Foundation

Design of isolated open foundation shall be based on complete sub soil


investigations. The allowable bearing pressure shall satis1’ the provisions
contained in the clause and the minimum foundation depth shall not be less
than that specified in Clause 705 of IRC: 78-2014. The selection of the
appropriate type of open foundation (counter fort type or cantilever type)

Page 43
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

depends on the magnitude and disposition of structural loads, allowable


bearing capacity etc. However, if rock strata are encountered at shallow
depth, it will be preferable to adopt open foundation to pile foundation.

Deep Foundations

In case of large scour depths and unavailability of rock at shallow depth deep
foundation shall be provided. This may be pile foundation or well foundation
depending on vertical load, horizontal load, bending moment and soil strata.
Cast in situ Pile foundation up to 1.2m dia can be constructed fast and are
more suitable if the total length of pile is up to 25.0m, pile can also be seated
on hard rock, and guidance can be taken from Appendix-5 of IRC —78-2014.
Beyond 30.0 m depth of foundation, well foundation shall be adopted as they
can carry large horizontal loads and bending moments compared to pile
foundations. Choice of foundation between pile and well shall depend on their
relative merits and demerits with respect to loads and soil strata.

Load & Stresses

In meeting the broad scope of the assignment as outlined, our proposed


methodology is as under:

Independent assessment of the loading will be made on each component of


structure and possible combination of these loading in line with IRC: 6-2017
will be made for designing the various components of the bridge — structure
at various stages of construction. These loading and loading combinations will
be compared with other IRC codal provisions also wherever applicable.
Permissible stresses under various combinations of loading are different.
These permissible stresses are given in IRC 6 and these will be followed. It
will be ensured that these are never exceeded. If a particular component is
appreciably under stressed then relevant sections will be revised and reduced
in the interest of the economy.

Page 44
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

3.4. GAD OF PROPOSED ELEVATED ROAD

The general arrangement drawing for Option-II has been prepared.

 12.15 m wide cross section has been proposed in approaches.

=7.50m (Carriage way Width) + 2x1.50m (Footpath) +2x0.45m


(Pedestrian Railing) + 2x0.375m (Crash Barrier)

 A 2-lane Bridge with 7.50 m wide carriage way with 1.5 m


Footpath and 0.45 m Crash barrier & Railing on both sides.

The proposed GAD arrangement for four options are depicted in drawings
placed at Annexure-4-1.

The component wise design feature summary is given below:

Span Arrangement

The proposed span system is as follows:

40.0m in general and it may reduce or increase as per the site conditions

Components

a) Superstructure PSC I Girders

b) Substructure Single circular RCC pier of Dia. of 3.0 m

c) Foundation Pile foundation, Well & Open Foundation

d) Retaining wall RCC Retaining Wall

Bearing

All the bearings shall be POT – PTEF.

Drainage Provisions

GI Drainage spout with GI grating shall be provided at the superstructure


near the pier locations.

Page 45
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Wearing Coat

Wearing Coat shall be reinforced cement concrete wearing coat type & of
thickness 65 mm.

Expansion Joints

Single Strip seal type of expansion joint has been proposed for every
expansion joint in superstructure.

Crash Barrier

Crash Barrier of 450 mm thickness would be provided at the outer edge of the
structures.

Figure 3-1: Proposed Cross Section for Bridge Portion

Page 46
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

Figure 3-2: Proposed Cross Section of approaches Road

Page 47
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Annexure 3-1: General Arrangement Drawings for Proposed HFL BRIDGE

Page 48
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Page 49
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR
ROAD MDR 51 IN DISTRICT KOTA.

Page 50
Thoughts Consultants Jaipur Pvt. Ltd.
Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

4. CONCLUSIONS &
RECOMMENDATIONS AND WAY FORWARD

4.1. CONCLUSIONS & RECOMMENDATIONS

 Construction of Bridge road will provide direct connectivity b/w Itawa,


Khatoli village and Sawai Madopur. It will reduce travel distance
between villages by around 40kms consequently saving time, energy
and resources. It will also result in enhanced socio economic activities
in nearby areas. T

 Consultant has formulated three alignment options. Option-I:, Option-


II: & Option-III:. The consultant recommends option-II

 Discharge expected to pass through proposed Bridge is 105450


cumec. For that HFL is worked out to reach 212.00m, FRL of the
Bridge has been proposed as 217.00m. Span 39x40 m of PSC Beams
on circular Piers is proposed.

(It is prudent to compare it with vital specifications of Gaita Makhida


Bridge being constructed 50 kms on upstream of the proposed Bridge
site, for which Discharge is 93798 cumec, HFL is 216.0, FRL of the
Bridge is 221.0, Lowest Bed level is 190.729 m & Span Arrangement
is 42x37.20 m)

 The General arrangement drawing of the Options-II has been


prepared by consultant.

 As per IRC: SP:73-2018 MANUAL OF SPECIFICATIONS AND


STANDARDS FOR TWO LANING OF HIGHWAYS WITH PAVED
SHOULDERS, SECTION -7 Clause 7.3 ii) Fig 7.6
Overall width should be 18.0m as below

13.00m (Carriage way Width) + 2x1.50m (Footpath)


+2x0.500m (Pedestrian Railing) + 2x0.500m(Crash Barrier)

But looking at the MDR nature of the Road, it was decided in the
meeting held on 5.08.2020 at zone level that Bridge width should be
as follows

Thoughts Consultants Jaipur Pvt. Ltd.


Preparation of Detailed Project Report for CONSTRUCTION OF HIGH LEVEL BRIDGE (ACROSS RIVER CHAMBAL) NEAR
JHAREL KE BALAJI ON KHATOLI – KAITHUDA SAWAI MADHOPUR ROAD MDR 51 IN DISTRICT KOTA.

 A 2-lane Bridge with 7.50 m wide carriage way with 1.5 m Footpath and
0.45 m Crash barrier & Railing on both sides.

 12.15 m wide cross section has been proposed in approaches.

 =7.50m (Carriage way Width) + 2x1.50m (Footpath)


+2x0.375m (Pedestrian Railing) + 2x0.45m(Crash Barrier)

 The 40.0 m span (c/c of Exp Gap) on single Piers has been
proposed.

 Wildlife clearance: The Recommended Alignment passes


through National Crocodile sanctuary. So, wildlife clearance
will be needed before starting the work. Proposal for wildlife
clearance will be applied after approval of alignment & General
Arrangement Drawing.

4.2. WAY FORWARD

 Based on the approval of Alignment by PWD authorities, consultant will


carry out necessary Engineering surveys & Investigations and prepare the
Project Report and Draft DPR.