Professional Documents
Culture Documents
X
Gate
394
35000
Shore Line
81
43750
802
94
3000
44453 (INSIDE RIVER)
Crane
23500
RCC Blocks
408
Pad
RO
120 cm x 180 cm
49
30 m 22000
-RO
1500
J
etty
Dry-5 m Dry-5.5 m
Wet-8 m BARGE 1 Wet-8.5 m
40 m X 12 m
70 m
BA X 15
17 m
40 m
RG
15 m
E2
PLAN OF GPUFF JETTY
X
Project: GPUFF JETTY
Prepared By: AVANT Logistics Ltd.
Drawing No. : Nil; Date : 25.04.2020