1-Materials & Stresses:

1-1 concrete:

- For plain concrete Fcu= 200 kg/cm².


- For Reinforced concrete Fcu= 300 kg/cm².

1-2 Reinforced Bars:

1. Grade B400DWR with yield stress 400 N/mm2 & Ultimate tensile stress to yield stress
ratio not less than 1.25.

2. Grade B240D-P with yield stress 240 N/mm2 & Ultimate tensile stress to yield stress
ratio not less than 1.25.

- For high tensile steel Fy= 4000 kg/cm²-


- For mild steel Fy= 2400 kg/cm²-

2- Codes:

- The Egyptian Code for design and construction of concrete structure (ECP 203-2020).
- The Egyptian Code for Assessment Loads & Forces in the Construction & Building
Works no. (201-2012).
- The Egyptian Code of Soil Mechanics Design & Construction no. (202-2008).

3- Foundation Design Criteria:

3-1 Foundation System:

- The foundation is isolated reinforced concrete footings rested on plain concrete footings.

3-2 Foundation Level & Bearing Capacity:

- Foundation level should be at 1.55 m below the lower level of natural ground.
- The allowable net bearing capacity is 1.75 kg/cm² at the foundation level.
4- Denisty of Materials:

- For plain concrete = 2.20 t/m³


- For reinforced concrete = 2.50 t/m³
- For bricks =1.40 t/m³

5- Loads:

5-1 Live Load:

- For Roof Slab = 0.10 t/m² (for non-accessible roof)

5-2 Floor Covering:

- For Roof Slab = 0.35 t/m²

6- Nominal Cover:

Cover for all reinforcement should be as follows:

o Slabs = 2.50 cm
o Beams = 5.00 cm
o Columns = 2.50 cm
o Footings & semells = 7.00 cm (or as per soil report)
3D MODEL
ETABS 2016 16.2.1

Electric Room E1 R03.EDB 3-D View


STORIES ANALYSIS AND DESIGN
ROOF FLOOR
Electric Room 1 ROOF R01

B25X105 B25X105
B25X105

B25X105

S14 S14 B25X105

B25X105 B25X105

SAFE 2016 16.0.2 Plan View Tonf - m


Electric Room 1 ROOF R01

E-3

520

480

440

400

0.35 360

320

280
0.35
0.35
240

200

160

120

80

40

SAFE 2016 16.0.2 Slab Surface Loading in Gravity Direction (SDL) [Tonf/m2] Tonf - m
Electric Room 1 ROOF R01

E-3

130

120

110

100

0.1 90

80

70
0.1

0.1

60

50

40

30

20

10

SAFE 2016 16.0.2 Slab Surface Loading in Gravity Direction (LLT) [Tonf/m2] Tonf - m
Electric Room 1 ROOF R01

0.20
0.20

0.20
0.20

0.20

SAFE 2016 16.0.2 Global Beam Force Loads (WL) [Tonf, Tonf/m] Tonf - m
Electric Room 1 ROOF R01

E-3

6.00

5.00

4.00

3.00

2.00

1.00

0.00

-1.00

-2.00

-3.00

-4.00

-5.00

-6.00

-7.00

SAFE 2016 16.0.2 Deformed Shape - Displacements (LTD) [m] Tonf - m


Electric Room 1 ROOF R01

1.00

0.80

0.60

0.40

0.20

0.00

-0.20

-0.40

-0.60

-0.80

-1.00

-1.20

-1.40

-1.60

SAFE 2016 16.0.2 Slab Resultant M11 Diagram - (U01) [Tonf-m/m] Tonf - m
Electric Room 1 ROOF R01

1.75

1.50

1.25

1.00

0.75

0.50

0.25

0.00

-0.25

-0.50

-0.75

-1.00

-1.25

-1.50

SAFE 2016 16.0.2 Slab Resultant M22 Diagram - (U01) [Tonf-m/m] Tonf - m
Slabs Design
360
400
Fy 400 Mpa Rmax 0.187 420
Fcu 30 Mpa Mmax 49.46 KN
Asmin 210 mm2
b 1000 mm OK
t 140 mm
d 115 mm

Mesh add add add


As 5  10 5  10 5  12 5  16
392.50 mm 392.50 mm 565.20 mm 1004.80 mm
M (KN) 15.00 28.62 34.17 47.08
Ok Ok Ok Ok
BEAMS DESIGN
ETABS 2016 16.2.1

3.8141

3.8121
-3.625 -2.0379 -3.6245
-0.0042

-0.0042
-4.0648
-4.0645

-0.0046

-0.0046

7.6425 17.9095 7.6632


3.9501

3.9449
-4.0822
-4.0825
-0.0044

-0.0044

Electric Room
PlanE1
View
R03.EDB
- Roof - Z = 5.1 (m) Moment 3-3 Diagram (Envelope Ultimate) [tonf-m]
ETABS 2016 16.2.1

-5.1716

-0.0532
-0.0532
-4.0203
0.0532

0.0532

4.1357
13.3628
5.1778

6.7729 6.7077

-0.0558

-0.0558
0.0558

0.0558
-5.1348
-4.2891

0.0545 -0.0545

0.0545 -0.0545

-6.2648 -13.4829 -6.2964


4.2625
5.1399

Electric Room
Plan E1
View
R03.EDB
- Roof - Z = 5.1 (m) Shear Force 2-2 Diagram (Envelope Ultimate) [tonf]
BEAMS DESIGN "ECP-203-2020"
Project
Designed By :
Location: Checked By :
Section ID: Approved By :
Material Propreties
Fy= 400 MPa
FCU= 30 MPa
Fyst= 240 MPa
Section Dimensions
bw = 250 mm
t= 1050 mm
cover = 25 mm
depth= 1009 mm
Straining Actions
MU = 15 Ton.m
VU = 24 Ton.m
Stirrups requirements
n(no of vertical branches) 2
s(spacing bet stirrups) 200 mm
Design for Flexure
RU= MU/b d^2
RU= 0.58934407 Mpa
µ= 0.67(fcu/c)(s/fy)(1-√(1-(3*c*Ru/fcu))
1-(3*c*RU/fcu) = 0.91159839
µ 0.001742231
µmin=max(µmin1,µmin2)
µmin1=min((0.225√fcu/fy≥1.1/fy),1.3µ)
0.225√fcu/fy= 0.0031
1.1/fy= 0.00275
µ min1= 0.0023
µmin2 0.0018

µmin = 0.00226
µact=max(µ,µmin)
µact = 0.00226
µmax Const.*Fcu/10000
µmax 0.01308
ok as µ<µmax
AS= 571.3210373 mm^2
Use 3 Ø 16 mm
shear design
qu=vu*1000/(b*d)
qu= 0.951437066 Mpa
qcu(uncracked)=0.16√(fcu/c) Mpa
qcu(uncracked)= 0.715541753 Mpa
qumax=0.7√(fcu/c)≤4.4
qumax= 3.130495168 Mpa
ok qu<qu max
Ast= (s*∂s)*(qu-qcu.cracked)*b)/(n*fyst)
Ast= 49.68727756 mm^2
Ø^2=Ast/0.25π
Ø^2= 63.23835326 mm^2
Ø= 7.952254602 mm
Use T 8 @ 200
BEAMS DESIGN "ECP-203-2020"
Project
Designed By :
Location: Checked By :
Section ID: Approved By :
Material Propreties
Fy= 400 MPa
FCU= 30 MPa
Fyst= 240 MPa
Section Dimensions
bw = 250 mm
t= 1050 mm
cover = 25 mm
depth= 1009 mm
Straining Actions
MU = 26 Ton.m
VU = 24 Ton.m
Stirrups requirements
n(no of vertical branches) 2
s(spacing bet stirrups) 200 mm
Design for Flexure
RU= MU/b d^2
RU= 1.021529721 Mpa
µ= 0.67(fcu/c)(s/fy)(1-√(1-(3*c*Ru/fcu))
1-(3*c*RU/fcu) = 0.846770542
µ 0.003074243
µmin=max(µmin1,µmin2)
µmin1=min((0.225√fcu/fy≥1.1/fy),1.3µ)
0.225√fcu/fy= 0.0031
1.1/fy= 0.00275
µ min1= 0.0031
µmin2 0.0018

µmin = 0.00308
µact=max(µ,µmin)
µact = 0.00308
µmax Const.*Fcu/10000
µmax 0.01308
ok as µ<µmax
AS= 777.1669601 mm^2
Use 4 Ø 16 mm
shear design
qu=vu*1000/(b*d)
qu= 0.951437066 Mpa
qcu(uncracked)=0.16√(fcu/c) Mpa
qcu(uncracked)= 0.715541753 Mpa
qumax=0.7√(fcu/c)≤4.4
qumax= 3.130495168 Mpa
ok qu<qu max
Ast= (s*∂s)*(qu-qcu.cracked)*b)/(n*fyst)
Ast= 49.68727756 mm^2
Ø^2=Ast/0.25π
Ø^2= 63.23835326 mm^2
Ø= 7.952254602 mm
Use T 8 @ 200
COLUMNS DESIGN
ETABS 2016 16.2.1

15
2.96
-1

53
.95
2
-26 -1
.13
24
5
.962
2
-1
-2 6
.14
91

5 45
9
2.
-1

Electric Room E1 R03.EDB


3-D View Axial Force Diagram (Envelope Ultimate) [tonf]
ETABS 2016 16.2.1

3.3
009

-3.3
0 4

3.3
03
4 -5.
7 96
8

2
99 5 .7
3.1 95
5
96
3 .19
-
-3.
30
47 9
19
-5 3.
.7
97 .2
4 -3

5.
79
59

Electric Room E1 R03.EDB


3-D View Moment 2-2 Diagram (Envelope Ultimate) [tonf-m]
ETABS 2016 16.2.1

8
39
1.6
-2.
4 97
3
42
.64
1

11 63
64
-1. - 2.56
2.4
97
5
4.0
38
5 88
.56
3 -2
66
8
644
5 . -4.
2. -1 03
7

4
568
2.

Electric Room E1 R03.EDB


3-D View Moment 3-3 Diagram (Envelope Ultimate) [tonf-m]
ETABS 2016 16.2.1

0.726
0.639

0.726
0.726

0.639
0.726

0.00 0.50 0.70 0.90 1.00


Electric Room E1 R03.EDB
3-D View Column P-M-M Interaction Ratios (BS 8110-97)
ETABS 2016 16.2.1 License #*14QW99YW2K5Z5DA

ETABS 2016 Concrete Frame Design


BS 8110-97 Column Section Design

Column Element Details

Level Element Unique Name Section ID Combo ID Station Loc Length (m) LLRF
Roof C8 11 C 30X40 (8Y16) 1.37% U14 0 5.75 1

Section Properties

b (m) h (m) dc (m) Cover (Torsion) (m)


0.4 0.3 0.041 0.015

Material Properties

E c (tonf/m²) f cu (tonf/m²) Lt.Wt Factor (Unitless) f y (tonf/m²) f yv (tonf/m²)


2424871.13 3000 1 40000 24000

Design Code Parameters

E c (tonf/m²) f cu (tonf/m²) Lt.Wt Factor (Unitless)


2424871.13 3000 1

Axial Force and Biaxial Moment Design For N , M 2 , M 3

Design N Design M 2 Design M 3 Minimum M 2 Minimum M 3 Rebar % Capacity Ratio


tonf tonf-m tonf-m tonf-m tonf-m % Unitless
15.5789 3.3198 -6.3017 0.3116 0.2337 1.34 0.848

Axial Force and Biaxial Moment Factors

M i Moment M add Moment β Factor Length


tonf-m tonf-m Unitless m
Major Bend(M3) -2.3052 -0.576 1 4.71
Minor Bend(M2) 1.1551 0.432 1 4.71

Electric Room E1 R02.EDB Page 1 of 2 9/20/2019


FOUNDATION DESIGN
DESIGN OF ISOLATED FOOTING SUBJECTED TO NORMAL FORCE

Project : Version 15.00 ®


Owner : Date : 15/11/2022
Engineer : Footing ID : F1
Input Data Working Loads ```
Pw = 48 ton qall net = 17.5 t/m2
Fcu = 300 Kg/cm 2
Fy = 4000 Kg/cm2
Column a = 0.40 m
Dimensions = b= 0.30 m 0.40
Thickness of Plain Concrete = 0.30 m

1.1 m
1.7 m
0.30
Design 0.400 0.30

Area = 1.1x(Pw)/qall net = 3.02 m2


LP.C= 1.80 m BP.C= 1.70 m

0.400
Take LP.C= 1.80 m BP.C= 1.70 m
LR.C= 1.20 m BR.C= 1.10 m
1.2 m
qun = 1.5xPw/L*B = 54.55 t/m2 1.8 m
Moment
M1-1 = qunB((L-a)/2)2/2 = 4.80 m.t/1.1
M2-2 = qunL((B-b)/2)2/2 = 5.24 m.t/1.2
Depth
d1-1 = C(M1-1/FcuB)0.5 20 cm
d2-2 = C(M2-2/FcuL)0.5 20 cm Take d = 33 cm t= 40 cm
Check for Shear
Qshu1-1 = shear at d/2 = 14.10 ton qu1-1 = 3.88 kg/cm2
Qshu2-2 = shear at d/2 = 15.38 ton qu2-2 = 3.88 kg/cm2
qcu = 0.75*0.5*1.3(Fcu/c)0.5 6.89 kg/cm2 qcu>qu Safe
Check for Punching
Qpu = 1.5xPw-qu(a+d)(b+d) Qpu = 46.91 ton
qpu = Qp/2(a+b+2d)d qpu = 5.23 kg/cm2
qpall = (0.5+b/a)(Fcu/c)0.5 qpall = 14.14 kg/cm2 qpall>qpu Safe
Reinforcement
As1 = Mu1-1/Fy.j.d = 4.48 cm2 As1 = 5  12 /m'
As2 = Mu2-2/Fy.j.d = 4.48 cm2 As2 = 5  12 /m'
As min. = (0.6/Fy)*bd = 4.95 cm2
Final Results
LP.C= 1.8 m BP.C= 1.7 m tP.C= 30 cm
LR.C= 1.2 m BR.C= 1.1 m tR.C= 40 cm
As1= 5  12 /m' As2= 5  12 /m'
As1 Total= 7  12 As2 Total= 7  12
Quantity Estemation

0.3 m As1 0.3 m 0.3 m As2 0.3 m

1.1 m 1m
As1= 9.948 Kg ,
L = 1.6 m As2= 10.57 Kg , L = 1.7 m
As total= 20.517 Kg VP.C= 0.918 m3 VR.C= 0.528 m3
%As = 38.858 kg/m3 Insulation Layer Area = 3.04 m2