Professional Documents
Culture Documents
Auditorium Terminals
GWR
Introduction
The GWR series terminals are installed in the stair riser of
auditoria to provide displacement ventilation. The terminals are
designed to be installed in the step of a graded/sloping room
configuration, using the space below as a pressure chamber.
The supply temperature should not be lower than 3K under-
temperature in the occupied zone (Δtu).
The terminal consists of a perforated front panel installed into
a frame, with or without flanges. An air distribution plate with
nozzles sits behind the removable front panel, which is fixed
with screws as standard.
Dimensions GWR 04-01
Product Description
GWR
GWR Auditorium terminal with a 15mm flange for surface
mounting 430
Material
120
Front plate: 1.25mm hot-dipped galvanised steel
40 400
Frame: 1mm electro-galvanised steel
Front panel and frame powder coated in RAL9010 or RAL9011.
Other RAL or NCS colours are available on request.
Specials and Accessories Technical Data GWR 04-01
• Other dimensions are available on request
∆pt Pa 20 50 100 m³/h v0.2 m/s
100
50
30
20 25 0.3
20
10 0.20
5 0.15
A)
dB(
A
LW
4 10 20 40 l/s
Order Example L 0.2 m
∆tu 3K 0.5 0.8
GWR/0/400/120/0/RAL9010
System
Type
Flange – 0 Flangeless,
1 Flange 15mm
Width Neck – 400mm as standard
Height Neck– 120mm as standard
Spigot position – 0 Top, 1 Bottom
Finish
8-12Pa