You are on page 1of 66
28. Full encirclement Steel Reinforcing Sleeves for Piping’ Is proposed for repairing leaking ‘defect. Which of the following type will be considered generally appropriate solution a. TypeA b. TypeB ¢. Either Type A or B d. None of above Ansb. REF: Clause 1,1,2, Art 2.6 ASME PCC-2 20 Fee dnnhrien" tune inead niate havinn ite acne abusttine udth alatine Inet sinal sade 44, According to ASME PCC-2 guidelines, the total linear expansion of 20 meters tong vessel (MOC : SA 516 Gr.70) at typical PWHT temperature of 650°C (1,200°F) may be ‘estimated as: @. 240mm. b, 60mm. c. 120mm. 4. 160 mm. Ans: d REF: Clause 3.2, Art 2.14, ASME PCC-2 3. In insert plate repair method, rectangular and square insert plates of 20 mm thickness shall have comers rounded to a minimum radius equal to: ‘8, 3 times insert plate thickness i.e 60mm b. 6 times insert plate thickness |.6120mm c. 75mm d. 150mm Ans; ©, REF; Clause 3.4, Art 2.1 ASME PCC-2 15. According to ASME PCC-2 guidelines, for “repair by weld” on base metal, if weld thickness is then it should be examined by volumetric examination methods such 148 radiographic or ultrasonic testing. Over 19 mm (34 in.) thick Over 25 mm (1 In.) thick Over 9.5 mm (96 in.) thick |. Over 12.7 mm (V2 in.) thick Ans: c. REF: Clause 5.1.2, Art 2.11, ASME PCC-2 3. In insert plate repair method, rectangular and square insert plates of 20 mm thickness shall have comers rourkted to a minimum radius equal to: ‘4, 3 times insert plate thickness i.e 60mm, b, 6 times insert plate thickness |.e120mm, ©. 75mm 4. 150mm Ans; ¢, REF: Clause 3.4, Art 2.1 ASME PCC-2 15. According to ASME PCC-2 guidelines, for ‘repair by weld” on base metal, if wokd thickness Is ——~--then it should be examined by volumetric examination methods such as radiographic or ultrasonic testing. ae Over 19 mm (34 in.) thick ‘Over 25 mm (1 in.) thick Over 9.5 mm (96 in.) thick Over 12.7 mm (12 in.) thick Ans: c, REF: Clause 5.1.2, Art 2.11, ASME PCC-2 4. A corroded area on non-post weld heat-treated cylindrical shell was completely removed by making a 150mm diameter opening, which is to be repaired by using circular Butt-weided Insert Plates. What will be Minimum diameter of insert Plate? a. Lesser of 121 or 380. mm (where t is the thickness of the parent material). b. Greater of 12 or 380mm (where t is the thickness of the parent material) c. 150mm diameter dd 300 mm diameter Ans: a. REF: Clause 3.6.1 , Art 2.1 ASME PCC-2 4. A corroded area on non-post weld heat-treated cylindrical shell was completely removed by making a 150mm diameter opening, which is to be repaired by using circular Butt-weided Insert Plates. What will be Minimum diameter of insert Plate? a. Lesser of 121 or 380. mm (where t is the thickness of the parent material). b. Greater of 12 or 380mm (where t is the thickness of the parent material) c. 150mm diameter dd 300 mm diameter Ans: a. REF: Clause 3.6.1 , Art 2.1 ASME PCC-2 {Q.104 Weld overlay is used to repair an area of localized metal loss. The original mental thickness is 0.75 in. (29.05 mm), including 0.125 in. (3.18 mm) corrosion allowance. The depth of the metal lost by corrosion and weld preparation is 0.25 in. (6.35 mm). The filler mental tensil strength is 60 ksi (413.7 MPa), while the base metal tensil strength is 70 ksi (482.6 MPa). What is the thickness of repair metal required? 1.0.214 in. (5.44 mm) 2, 0.250 in. (6.35 mm) 4, 0.3125 in. (7.94 mm) 1. at the discretion of the inspector 2 using the current process conditions 4, Using the rate that gives the longest inspection interval {Q.106 Before internal inspection of a pressure vessel starts, it is recommended that 1. All work on the vessel's exterior should be stopped 2 the pressure vessel engineer should develop a complete inspection plan for the 3. The inspector should obtain a hot work permit before entering the pressure vessel {Q.107 Indentify activites typically included the inspection of the pressure relief valves {DRAG & DROP) 2 valve body thickness measurements 3, Shop inspection 5. Spring compression test, {Q.108 During pressure vessel rerating, a thickness reading of 1.336 in.(33.9 mm) is obtained on a clad 21 ellipsoidal head with an |.D. of 60-1/26 in. (1526 mm). The joint efficiency is 1.0. The ASME data report states that the head is seamless and that the attaching weld to the vessel is category 8, Type 1, and has an allowable material stress of 17,500 psi (120.6 MPa). Estimated corrosion rate for the clad head is 0.0 in. /yr. (no corrosion expected). Based on this data, what is the maximum allowable pressure of this head. 41. 543 psig (3.73 Mpa) 2.620 psig (4.27 Mpa) 3. 659 psig (4.53 Mpa) (2.109 which of the following can be used determine the weld preparation angle prior 1. Vernier Caliper 2 SKEW-T gauge 4, The procedure Qualification Record —_ (_) Q.101 An inspector is assigned to the Amine Unit and is required to perform an internal inspection on the carbon steel sour gas stripper column. Which of the following types of damage should the inspector be concerned about? 11. Uniform thinning, localized corrosion, and under-deposit attack 2. Hydrogen blistering in the shell material |. Pitting attack and crevice corrosion 1. Location of other repairs 2. Documented approval by the engineer Cee Cee a CIRC a tea Root Cu ciate ad ee Cenc Q.92 A 96-in. (2, 438-mm) diameter vessel has been in operation for 10 years. The original thickness of the top head was 0.438 in. (11.15 mm). The current thickness of the top head is 0.293 in, (7.44 mm). The maximum thickness of the head based on the new maximum allowable working pressure is 0.250 in. (6.35 mm). What is the maximum interval for the inspection of the head? 1. 1 year, 6 months 3.3 years 4.4 years Q.93 A carbon-steel pressure vessel is to be put into a caustic service (solution of 30% by weight) at a temperature of 140 *F (60°C) and a pressure of 176 psig (1.21 MPa). Considering caustic stress corrosion cracking (caustic embrittlement), which of the following is the most appropriate statement? 1, The vessel should be changed to a nickel alloy 2. The vessel should be changed to type 316 stainless steel 3. Industry experience indicates that there should be no problem Q.95 which of the following is one of the two most important factors in determining the tolerable limit of wall loss in order to maintain the value of the inspection? 2. The type of damage 3, The outside surface condition 4, The external surface temperature 0.76 for localized corrosion, its important that examination are conducted using 2 Digital thickness measurements 3. Electromagnetic techniques 4. Ultrasonic shear wave techniques. A277 To verity a 100 BIEUIING vic ag: pressure 1.7% An external inspection of a pressure vessel shall always 1 report the corrosion rates determined during the inspection 3, measure the thickness ofthe coating under the insulation 4 Include the results ofthe settlement survey 60 tn accordance with API 510, temporary repairs may remain in place for longer periods of time 1 the approval of jurisdiction received 2. approved and documented by the inspector 4, mandatory date for installing permanent repair has been included inthe documentation (0.82 A rupture disk might suitably be used 1 When the dizcharge rom values must be piped to cemote points 3. nan incompressible service where quick Blowdown ‘speeded 4.0n steam boiler drums and superheaters (0.83 Materials used for making repairs shall be of known wieldable quality and shall 2. Be of known toughness 3. Have a minimum tensile of 50,000 psi (345 MPa) 4, Have an ASTM specification number be left in place. The nameplate is stamped RT-2 what is weld-joint category of the longitudinal Q.69 Material certification, mill test reports, and certificates of compliance 11, may be considered a substitute for PMI 2. must be reviewed by the authorized inspector 3. are required by code for all components for quality assurance record keeping 11. Whenever the vessel has been opened for internal inspection 3. after any repair or alteration is performed 4. Only if the vessel is rerated to a high pressure Q.59 All nondestructive examination (NDE) results conducted by examiners shall be 2. reported to the owner/user for corrective action 3. ina accordance with ASNT-TC-1A. 4. evaluated by the ND company level Ill examiner. 1. grooving of the raised face 3. bolt-hole centerline alignment 4 fillet weld strength reviewing NDE 2. The Authorized Inspection Agency 3. The inspector 4, Whomever the owner/user designates Q.57 A vessel in ethylene condensate service is being moved and put into steam .condensate service corrosion rate for the vessel while in ethylene service was 0.001 in/yr. (0.025 mm/yr)The inspector should 1. require rerating of the vessel 2. require a pressure test 4. continue to maintain the old corrosion rate Q.57 All of the following are suitable for determining the thickness of a 2. profile radiography 3. ultrasonic straight bean 4.ulterasonic "A" scan Q.47 The API-authorized pressure vessel inspector may give prior general authorization for vessel.repairs that do not require 1. final acceptance inspection 2. radiography 4. ultrasonic testing 1. tensile overload 2. creep 3. erosion Q.49 What is a pressure-vessel inspection plan? 1. The required inspection and nondestructive examination (NDE) procedures 2. A schedule for inspecton of all vessels in a process unit 4. A trunaround plan for inspection and repair of all vessels in the turnaround Q.50 A pressure vessel has been in service for 12 years. The original thickness was 1.938 in. the current thickness is 1.405 in. (35.7 mm). The retirement thickness is 225 in....... the corrosion rate for this vessel? 1.0.015 in,/yr. (0.382 mm/yr.) 2. 0.030 in./yr. (0.762 mm/yr.) 4, 0.088 in./yr. (2.235 mm/yr.) is generally less risky than a high-pressure hydrostatic test 2. isthe same as an air test 4. is performed in four steps increases Q.52 Accessible flange faces should be inspected to determine 1. material specification 2. correct dimensions 3. environmental cracking Q.43 a vessel having a 24 in. (609.6 mm) diameter is constructed from ASTM A516-70 plate and operates at a service temperature of 210°F (93°C). The long-term corrosion rate is 0.015 in. (3.81 d 1s performed to extend the next inspection but failed to meet all criteria, The Initial vessel thickness is 0.900 in. (22.9 mm); the minimum required thickness to safely operate the vessel is 0.750 in. (19 mm). When should the next external. “corrosion inspection be performed? 2. 10 years 3.15 years 4. 20 years .40 The installation of a welded patch on the exterior of a pressure-vessel shell in most cases requires that the 1. Shell material i free of defects using magnetic particle testing 2. Rerating nameplate is correctly stamped and installed 4. Efficiency of the attachment weld Is identical to that of the original fabrication 41 A vessel has an actual thickness of 0.500 in, (12.70 mm), an original thickness of 0.605 i (12.70 mm), an original thickness of 0.605 in. (15.37 mm) and a minimum required thickness of (0.425 in. (10.80 mm). The vessel is corroding at 0.025 in/yr. (0, 380 mm/yr.). What is the remaining of the vessel? 1. 25,years 3. Gyears 1. sufficient, but the radiograph may be considered unacceptable 3. insufficient, and the radiograph is considered acceptable 4, Sufficient and the radiograph may be considered acceptable pressure vessel is in service? 1. Radiography 2. Acoustic emission 3. Eddy current testing Q.30 Ifa pressure vessel component should fail because an incorrect material was inadverantly for the specified material, the inspector shall 1. Remove the vessel fabricator form the list of approved suppliers 2. Apply API 578 for material verification on other pressure vessels 4, Require 100% PMI test verification of all other components in the vessel Q.31 The vessel is constructed of SA285-C steel with a measured thickness of 0.75 in and has a Corrosion allowance of 0.125 in.(3.2 mm).The minimum thickness required for pressure ... Be 0.607 in. (15.4mm). Considering that corrosion has been arrested. Which pits if any must be repaired? 1A 2.8 4. None Q.32 what is the sort-term corrosion rate for a vessel with an original thickness of 0.500 in. (12.7 mm) if the Current thickness is 0.375 in. (9.5mm) and the thickness 60 months ago was measured at 0.435 in. (11.0mm)? 1. 0.010 in/yr. (0.25 mm/yr.) 30.012 in/yr. (0.34 mm/yr.) 4, 0.025 in/yr. (0.64 mm/yr.) Q.33. which of the following materials is highly susceptible to chloride stress corrosion cracking? 1. Carbon steel 2. Duplex stainless steel 4, 400 series stainless steel 4. Qualified welding procedure and the owner's recommendations .26 A horizontal vessel with a cement and sand liner (on crimped rods with wire tied between) is to be inspected internally. What is the preferred method of checking the liner to ensure that it has not lost its Bond with the vessel shell steel? 1 Remove selected areas of refractory 3. Ultrasonic testing 4, Spot radiography Q.27. The two most important allowing elements for prevention of high-temperature hydrogen attack 1. Manganese and nickel 3. Nickel and chromium 4, Carbon and molybdenum Q.15 Insert patches to repair a corroded area in a horizontal shell section may be used if which of the following requirements are met? 5, The filler material tensile strength shall be at least 95% of the minimum specified tensile strength of the base material ‘Q.16 When the probability of failure of a vessel is low 1 Inspections should b reduced or eliminated 2. On-stream inspections are preferred 3. Only external inspections are necessary Q51... area of considerable size is being evaluated. The ... the nozzle does not extend while......: ... when the distance from 1) Amaximum of 2 times the nozzle outside diameter 2) One half the limits of the reinforcement as defined in thi 3) 6 in. (150 mm) on each side of the nozzle 4) The limits of the reinforcement as defined in the construction Q52 missing Q47..... ... may the pressure vessel be operated bypass ... 1) With the engineer approval 2) Inspector and operator have reviewed risk potential 3) With a documented and approved deferral 4) Inspection deferral extension does not exceed 12 months Q.43 Which of the following are used when selecting an image Quality indicators (IQ!) for butt welds having internal reinforcement, internal protrusion or a backing ring? 1) Base material 2) internal protrusion 3) externalreinforcement —— 4) backing ring V = Q33 The maximum surface temperature for dry magnetic particle . 2) Set by the NDE level I!I examiner 3) Limited by the permeability of the examination .. on) Q.31,A vessel with a 3-In (75 mm) thick shell, composed of P.No 3, grOUP-L sau.n post weld heat treatment (PWHT) as a code requirement. What is the maximum of .. Made without subsequent PWHT when a350 F (175 C) preheat is made ....? 2) %in(13 mm) 2) 5/81n, (16 mm) 3) 1-1/2n 8mm) 4) in. (75 mm) Ans: Q 32 A inspector is assigned to the Amine Unit and is required to perform an internal Inspection .......carbon steel sour gas stripper column, Which of the following types of damage should the...... concerned about? 4) Uniform thinning, localized corrosion, and under deposit attack 2). Hydrogen blistering in the shell material 4) iting attack and crevice corrosion 1) The vessel should be changed to nickel alloy 2) The vessel should be changed to type 316 stainless steel 3) Industry experience indicates that there should be Ans: Q31A vessel with a 3-In (75 mm) thick shell, composed of P.No 3, group-1 .. post weld heat treatment (PWHT) as a code requirement. What is the maximum of Made without & subsequent PWHT when a 350 F (175 C) preheat is Made wre? on) Ans: Q 24 What is the required RT category for a nozzle butt weld whose joint is 1.75 in (44.5 mm)? 1) Fill 2) pot with joint efficiency of0:80 3) Spot with ont efficiency of 0.85 4) None Ans 125 During the inspection of horizontal pressure vessel, an elipsodal head has the Wewing Thickness 1.25 in (31.75 mm), inside diameter ofthe skirt 48 in (1219.2 mm), inside radius of the dish 43 in (1219.2.mm), inside knuckle radius 8 in.(203.2 mm), S= 15,000 psi, E-1 ‘What is the MAWP for his head without a corrosion allowance? 1) 739 psi(5.09MPa] 2) 771 psi(5.36MPa) 3) 785 psi(5.41MPa) 4) 820 psi Ans: Q.26 Which of the following materials is m@SESUBREDEDI to high temperature hydrogen attack: A)Mn05Mosteel —2)1.25Cr05Mosteel 3) 1-Cr.05Mostee! 46:05 Mo'steel 20 The type of corrosion caused by sulfidation is most often described as: 1) Uniform thinning 2) high temperature oxidation 3) Pitting or localized corrosion 4) stress corrosion cracking Ans: Q.14 Alternating current flux leakage examination technique is good for detecting: a]. Metallurgical changes that may lead to cracking ») localized metal loss and subsurface cracking «) Corrosion under insulation _) sfc breaking cracks and elongated discontinuous ans: 15 in magnetic partcie examination, the direction of magnetization shall be deteriorated by particle indication obtained using an indicator or shims. The magnetizing technique shall be changed where clearly defined line of particles is not formed in: 1) Atleast two nearly perpendicular directions for the multidirectional techniques 2) At least two nearly horizontal directions for the multidirectional techniques iT) 3) One of the nearly horizontal directions. ectional techniques 4) One of the nearly perpendicular directions for the multidirectional techniques 'Q.12 A carbon steel pressure vessel is to be put into 2 caustic service (solution of 30% by weight) at a ‘temperature of 140 F (60 C) and a pressure of 176 psig (1.21 MPa). Considering Caustic stress corrosion Cracking (caustic embrittlement), which ofthe following is the most appropriate statement. 41) The vessel should be changed to nickel alloy 2) The vessel should be changed to type 316 stainless steel 43) Industry experience indicates that there should be 4) The vessel should be post weld hest treatment heat treatment as a code requirement. What is the maximum depth of weld repair that can be made without subsequent PWHT when a 350F (175C) preheat is maintained during welding? 1) %in (13 mm) 2)5/8 in (16 mm) 3) 1% in (38 mm) 4)3 in (75. mm) Q 12 A carbon steel pressure vessel is to be put into a caustic service (solution of 30% by weight) at a temperature of 140 F (60 C) and a pressure of 176 psig (1.21 MPa). Considering Caustic stress corrosion cracking [rauctic emhrittlamant) which of the follwing ic the mact annranriate ctatemant Q.11 A Vessel with a 3-in (75 mm) thick shell, composed of P.no 3, Group 1 material initially had post weld i Ans: To find the maximum tensile strength with area and ultimate load given.. Tensile strength=load/ area j.n9 ayy > Forwarded which NDT is applicable. Options:ACFM, AUBT, Eddy Current 1:22 AM > Forwarded Inspection records contain the following information for a TML on a dished head. (Thk. in inches) On the basis of this information, the long-term corrosion rate for the location is: Thickness Year 0.500 0 0.425 5 0.400 10 a. 1% mils per year b. 5 mils per year c. 10 mils per year d. 100 mils per year 1-22 AM 1. Approval of any procedures and materials to be used on a repair is always required by: a. The owner/user of the vessel b. The Authorised Pressure Vessel Inspector * c. A Pressure Vessel Engineer d. A certified welding inspector 2. Local PWHT is to be used instead of 360 degree banding. Who must review the application of the PWHT and develop a suitable procedure? a. A metallurgist b. The owner/user c. The API authorised vessel inspector d. A pressure vessel engineer experienced in the appropriate specialities * 3. Who is responsible for justifying the rerating calculations on a pressure vessel? a. The API authorised pressure vessel inspector b. The manufacturer or owner-user engineer (or designated representative) * 8 c. Any professional engineer d. ... Read more 1:22 AM 5. Cold differential test pressure (CDTP) is: a. The pressure at which a PRV is set to lift on the test stand * b. The pressure at which a PRV is set to lift under service (hot) conditions c. ‘Set pressure’ + 10% d. ‘Set pressure’+ back pressure Ann Ana 5. Which of these NDE techniques cannot be used on most corrosion-resistance metallic linings on pressure vessels? a. WFMT* b. DP c. Visual inspection (because oxide film hides the cracks) d. None of the above techniques are suitable 1:99 AMA 1. Some vessels in hydrogen service use a weld-overlay for corrosion resistance. What inspection technique(s) would you use to check if the overlay has become disbonded from its backing material? a. RT b. UT * c. DP d. All of the above 1-22 AM External inspection of a pressure vessel starts with: a. Ladder, stairs, walkway and platforms of the vessel b. Insulation, skirt and foundation c. The external surfaces, of vessel d. Dimensional check of the vessel 1:27 AM The maximum carbon content of weldable steel per ASME Code is? 1.35% 2. .035 % 3. .0035 % 4.3.5 % 1:22 AM For non-continuous corrosive service with remaining life 25 years, external inspection shall be performed not later than: a. 10 years b. 12.5 years c. 5 years d. None of above 1:22 AM For construction and repair activities a written material verification program should be established by the: a. API 570 Authorized Inspector. b. Engineering Organization. c. Owner/User . d. Repair Organization. 1:29 AM The purpose of a Welding Procedure Specification and its Procedure Qualification Record is: 1. To make sure every one involved in the repair process has a listing of nonessential variables 2. Make sure the welder follows the essential variables 3. To prove the weld will provide the required properties 4. Keep testing labs in business 1:22 AM 1. A safety valve is designed to open fully at: a. CDTP b. Minimal overpressure * c. 10% overpressure d. 25% overpressure 1-22 AM 6. Which of these applications would be particularly suited to the use of a pilot operated safety valve? a. Where the difference between normal operating pressure and valve set pressure is very high b. Where the difference between normal operating pressure and valve set pressure is very low * c. Where a very long blowdown is required for process reasons d. Where the process fluid is particularly corrosive 1:22 AM 1. Approval of any procedures and materials to be used on a repair is always required by: a. The owner/user of the vessel b. The Authorised Pressure Vessel Inspector * c. A Pressure Vessel Engineer d. A certified welding inspector 4. Who must approve the use of temporary fillet welded patches in a repair? a. The owner b. The API vessel inspector c. The engineer and the API authorised vessel inspector * d. Any of the above can give approval 5. The API authorised vessel inspector can give prior general authorisation (without consulting the pressure vessel engineer) for routine or limited repairs that do not require which of the following? a. Pressure tests * b. Impact testing c. Hardness testing d. All of the above 1:22 AM 2. Local PWHT is to be used instead of 360 degree banding. Who must review the application of the PWHT and develop a suitable procedure? a. A metallurgist b. The owner/user c. The API authorised vessel inspector d. A pressure vessel engineer experienced in the appropriate specialities * 3. Who is responsible for justifying the rerating calculations on a pressure vessel? a. The API authorised pressure vessel inspector b. The manufacturer or owner-user engineer (or designated representative) * c. Any professional engineer d. Any API certified inspector 4. Who must approve the use of temporary fillet welded patches ina repair? a. The owner b. The API vessel inspector c. The engineer and the API authorised vessel inspector * d. Any of the above can give approval 1:22 AM ‘ASMELK 2019) NO * @ © ™ ya ‘Welding Variables Procedure Spec! fications (WPS) — Table QW-256.1 pecan Process Vartabion ‘Besenttal Variables Gas Tungsten-Are Welding Corrosion Reattant overlay (CRO) fromessent arg-tcing Overiay (NFO) (QW-26) (ows) 2a] 6 ‘ante rm lawns So | Number } PNunber Base Mets zs | @ Tomine Fuad “s ¢ Wire jaw-sor ier Meta = iter meal iter otal product form Jaws nite do not imply that substitu it iadinbaranntoatl e test without consic= -was used in the qualification Soe , ibili the stan [pou H on of See Fe ea tmechanical properties, and service requirements. The io lowing table shows the assignment groups for various al- _loy systems: Base Metal wel through P-No. 1 through P-No. 101 — P-No. 15F © P-No. 103 ‘Aluminum and P-No. 21 through P-No. 104 and P-No. ‘aluminum-base P-No. 26 105 P-No. 31 through P-No. 107 and P-No. P-No. 35 108 P-No, 41 through P-No, 110 through P-No. 49 P-No.112 ‘P-No. 51 through P.No. 115 P-No. 53 P-No.61and P-No. — P-No. 117 ‘The values given in the column heading “Minimum Spe- Gified Tensile” of Table QW/QB-422 are the acceptance values for the tensile tests of the welding or brazing pro- cedure qualification, except as otherwise allowed in QW-153 or QB-153. Only base metals listed in Table QW/QB-422 with minimum tensile strength values may be used for procedure qualification except as modified by the following paragraph. Ifan unlisted base metal has the same UNS number des- ignation as a base metal listed in Table QW/QB-422, that base metal is also assigned that P-Number or P-Number - pipe. b. ASTM forged pressure parts. cast iron parts used for pressure. Q.108 During pressure vessel rerating, a thickness reading of 1.336 in.(33.9 mm) is obtained on a clad 21 ellipsoidal head with an |.D. of 60-1/16 in. (1526 mm). The joint efficiency is 1.0. The ASME data report states that the head is seamless and that the attaching weld to the vessel is category B, Type 1, and has an allowable material stress of 17,500 psi (120.6 MPa). Estimated corrosion rate forthe clad head is 0.0 in. /yr. (no corrosion expected). Based on this data, what is the maximum allowable pressure of this head. 1. 543 psig (3.73 Mpa) 2.620 psig (4.27 Mpa) 3. 659 psig (4.53 Mpa) 3.5 palg? ? ‘ond another ite be mcretacoy feted, Wil ha a pressure of 1695 pol neeree ‘9090, located 100 feet rom the top. (AY According to API-S10, what is the maximumn interval between pressure relieving device inspection? Kies years B. Ten years C. Six months D. Eighteen months Q-5 HCL is most often associated with : A: High temperature corrosion C: Near surface blisters in carbon steel D: Pitting attack in nickel base alloy Q-10 which of the following is most susceptible to chloride stress corrosion cracking? A. Non stress relieved admiralty brass U-bends B. Inadequately heat treated 1.25 Cr-0.5 Mo low alloy steel D. Non-post weld heat treated carbon vessel. Q-2- Corrosion is suspected under beneath refectory lining the refectory can be removed to allow further inspection or ? (La vce scanning may be made rom external metal surtas™, B. Profile radiography of the metal surface is a good alternative QI ating rp eeeentemeichigess D. A through visual inspection is considered sufficient any must be repaired? LA 2.8 3.AandB 4. None 4, Inspector prior the welding what review (mainly) like that asking? Ans. Standard, drawing code and spec... 8 Which of the following may be installed om the inlet or outlet ofa pressure- elie valve 0 provide added corrosion protection ofthe valve internals? 'A. Orifice plates limiting or restricting flow to and from relief valves to reduce hamimesieg B Isolation valves that utilize the “double block and bleed!” designs e prevent ine screens & filters that tap debris and prevent deposition at inermal surfaces Rupture disk devices that potest the relief valve aginst system Maids Page 6 of 16. 68. Lack of Fusion is more susceptible in which welding process? a, SMAW b. GTAW c. GMAW-Spray @ GMAWS

You might also like