Professional Documents
Culture Documents
Api 510 Exam CB Ob
Api 510 Exam CB Ob
1. Outside of Ellipsoidal Knuckle area corroded, the Centre portion of head which
formula use for calculation?
ANS. Hemispherical,
2. Some vessel exempted in accordance with the criteria in ASME Code Section VIII,
Division 1 Should be considered for Inclusion based on Risk?
ANS. POF & COF
3. Which code recommended practice for Material Verification Program?
ANS. API 578
4. 4. AEU Exchanger?
ANS. Floating Head
5. What Is Arc Blow?
ANS. The deflection of an arc from its normal path because of magnetic forces .
6. Design Temperature?
ANS. The temperature used for the design of the pressure vessel per the applicable
construction code
7. Inspection Plan Definition?
ANS. A strategy defining how and when a pressure vessel or pressure-relieving device will
be inspected, repaired, and/or maintained
8. What is testing?
ANS. Either pressure testing or mechanical testing
9. What is Transition Temperature?
ANS. The temperature at which a material fracture mode changes from ductile to brittle.
10. Who is responsible for implementing and executing an effective MOC process that reviews
and controls changes to the process and to the hardware?
ANS. owner user
11. Who should implement and Maintain IOWs?
ANS. owner user
12. Who shall maintain certification records of the examiners employed, including dates and
results of personnel qualification?
ANS. owner user
13. Before starting Inspection activities?
ANS. obtain permission from operating personals
14. If Lining appears bulged?
ANS. to remove deposits or linings to perform adequate inspections
15. What is On-Stream Inspection?
ANS. When on-stream inspections of the pressure boundary are specified, the appropriate
NDE techniques shall be specified to detect the damage mechanisms and their
associated flaw types identified in the inspection plan. Such inspection may be conducted
either while the vessel is depressurized or pressured.
16. Who approved Nozzle?
ANS. Only Engineer
17. What is PT temperature?
ANS. 40 Degree F to 125 Degree F
18. How to Prepare CUI Inspection Plan?
ANS. the inspector should consider the area that is more susceptible to CUI In 5.5.6.2
19. Which may be eliminated?
ANS.
20. PT which defect detecting?
ANS. subsurface
21. How to find refractory or lining?
ANS. IR
22. How to do surface preparation for caustic stress corrosion cracking ?
ANS. High pressure & Grit
23. Corrective Procedure should utilize which temperature?
ANS. 150F
24. When Presser test Must be applied?
ANS. if the inspector believes that one is necessary
25. MAWP definition?
ANS. Maximum Gauge pressure permitted on the top
26. When Pneumatic test shall consider by engineer before conducting test?
ANS. personal & property Risk
27. If pressure vessel component experience accelerated corrosion or should fail because an
incorrect material was inadvertently substituted for the specified material?
ANS. Further material Verification by Inspector
28. Weld and Heat affected zones are often inspected for?
ANS. corrosion & Surface Specified cracking
29. Accessible flange face should be examined for ?
ANS. Distortion & condition Gasket seating surface area.
30. Flange fastener should be engaged if the lack of complete engagement?
ANS. not more than one thread
31. The marking on a representative sample of newly installed fastener and gasket should be
examined to determine?
ANS. To determine whether they meet material spec.
32. Flange in high -Pressure and/or High -Temperature services that have been boxed in or leaked
on-stream during the previous operation run should special attention to ?
ANS. 5.11.5-During Insp & maintenance outage.
33. If both the ownership and location of vessel are changed?
ANS. internal/external insp
34. External inspection should?
ANS. Ladder, Staircase, Platform
35. Non-continuous for internal Inspection?
ANS. the number of years of actual service instaed of calendar years
36. On Stream Inspection in Lieu of Internal Inspection?
ANS. Must be read all rules
37. Multi Zone Vessel?
ANS. Each zone may be treated independently. Each zone shall be inspected based on
the interval for that zone.
38. Each repair organization shall have?
ANS. fully documented training programe
39. Pressure -relieving device shall be tested and inspected at interval that?
ANS. That does not exceed 10 years for non-fouling and 5 years for typical service
40. Deferral proposed new due date would not increase?
ANS. 10 percent of the inspection Interval or 6 month whichever is lesser
41. Short term VS Long Term shall be determined by?
ANS. Inspector)
42. When evaluating Shot term and Long term corrosion rate as part of the data assessment?
ANS. inspector in consulting with corrosion specialist
43. How to determine Probable corrosion rate?
ANS. Four Method
44. If Probable corrosion rate an on-stream determination shall be? (There is one option show
after 1000 hrs and second option after three to six month so don’t choose 1000hrs.)
45. Evaluation of locally thinned area?
ANS (two rules remember, one question close book and for calculation open book)
46. One question form average thickness six rules API book
ANS. Page no : 44 and one for calculation)
47. Evaluation of Pitting? (one question for objective and two question for calculation)
48. One question Joint efficiency?
ANS. Either side of weld 1Inch or twice the required thickness whichever greater
49. Evaluation of existing equipment with minimal documentation for Type 2 Butt weld?
ANS. 0.65
50. Owner user shall maintain Permanente Recorded will be