SURVEY REPORT OF INTERNAL ROAD LAYOUT

Project WADI AD DAWASIR SOLAR PV INDEPENDENT POWER PLANT DOC No.


Owner NOOR ALWADI RENEWABLE ENERGY COMPANY LLC RFI No.
Consultant FQP No.
Contractor BRANCH OF SEPCO ELECTRIC POWER CONSTRUCTION CORPORATION DWG No.

WADI AD DAWASIR SOLAR PV SITE FENCE OVERVIEW F55 TO


Area Sub-Area C15 F55 TO F65 Date 10-Jan-24
F65 TOTAL DISTANCE 1000 MITER

S.No. Instrument Make Model Instrument Serial # Calibration


1 TOPCON GPS HIPER V (ROVER) 1122-25336 CAL.DATE : 12/12/2023
2 TOPCON GPS HIPER V (BASE) 1122-25137 NEXT CAL. :10/6/2024
Reference Bench mark: BM3-NEW N : 2264861.849 E : 487075.088 Elv : 672.158
Acceptance Criteria As per Drawings and Specification, Elv : ± 05mm
Elevations Co-ordinates
S.No. Locations (m) Difference Dwg Actual Difference
NGL EXISTING Cut and fill X Y X Y X Y
1 F55 TO 0.000 MITER (CORNER POINT) N/A N/A N/A 487066.155 2264550.385 487066.153 2264550.388 -2MM 3MM
2 F56 TO 100 MITER N/A N/A N/A 487148.773 2264515.469 487148.776 2264515.465 3MM -4MM
3 F57 TO 200 MITER N/A N/A N/A 487240.885 2264476.541 487240.882 2264476.544 -3MM 3MM
4 F58TO 300 MITER N/A N/A N/A 487332.997 2264437.612 487332.997 2264437.614 2MM 2MM
5 F59 TO 400 MITER N/A N/A N/A 487425.109 2264398.684 487425.106 2264398.687 -3MM 3MM
6 F60 TO 500 MITER N/A N/A N/A 487517.22 2264359.756 487517.221 2264359.758 1MM 2MM
7 F61 TO 600 MITER N/A N/A N/A 487609.332 2264320.827 487609.335 2264320.83 3MM 3MM
8 F62 TO 700 MITER N/A N/A N/A 487701.444 2264281.899 487701.448 2264281.898 4MM -1MM
9 F63 TO 800 MITER N/A N/A N/A 487793.556 2264242.971 487793.553 2264242.968 -3MM -3MM
10 F64 TO 900 MITER N/A N/A N/A 487885.668 2264204.042 487885.671 2264204.042 3MM 0MM
11 F65 TO 1000 MITER N/A N/A N/A 487977.779 2264165.114 487977.782 2264165.118 3MM 4MM
12
13
14
15
16
17
18
19
20
21
22

23 REMARKS : ALL UNITS IN MM.


EPC EPC EPC Owner
SURVEYOR Construction QA/QC ENGINEER QA/QC ENGINEER
Name M.Sikander SHAMS TABREZ M.BAYISH

Signature

Date