1.
PLTG
Kapasitas 600 MW
Investasi 1800 $/kW
Fuel Cost 8 c/kWh
CF 80%
Var. O&M 8%
Fixed O&M 20%
Tarif PLTG 21 c/kWh
- Total PV Cost = A + B + C + D
- Total PV Cost = 1080 M$ + 1051.83M$ + 1638.06 M& + 131.04 M$
- Total PV Cost = 3900.03 M$
-
Y−Y1 X−X1
- =
Y2−Y1 X2−X1
0−120.85 IRR−25%
- =
−72.95−120.85 30%−25%
−120.85 IRR−25%
- =
−193.8 5%
IRR−25%
- 0.62 = 5%
- 0,03117 = IRR − 25%
- IRR = 0,28117 = 28,117%
2.
- Harga EPC naik 30%