Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)

1 a) Skilled MD 100.0

2 b) Unskilled labor MD 300.0

2.2.1.2 Material

Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)

1 a) Cement Bag 150.0

2 b) Sand Cum 50.0

2.2.1.3 Equipment

Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Excavator with Breaker 200 PC
1 Minimum including fuel & operator Hr 300.0
allowance all complete.
Procument Item Details

SL. Bidder's Rate Bidder's Rate (in Total Amount


Item Description Unit Quantity
No (NPR) words) (NPR)
Clearing and Grubbing Road Land .,
Clearing and grubbing road land
including uprooting rank vegetation,
grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal
of unserviceable materials and
1 stacking of serviceable Material to be Sqm 59097.0
used or auctioned, up to a lead of 30
meters including removal and disposal
of top organic soil not exceeding 150
mm in thickness., By Mechanical
Means, In area of thorny jungle ( more
than 15 numbers per 100 sqm)
(SS/SP-201)
Earthwork Excavation in Cutting.,
Roadway and Drain Excavation in all
types of Soil and rock by Mechanical
Means ., Road way Excavation in all
types of soil and Roaks (Including
2 Hard Rock) as per Drawing and Cum 460914.7
technical specifications including
removal of stumps and other
deleterious matter, all lifts and lead as
per Drawing and instruction of the
Engineer. (SS/SP-905)
Transportation of material beyond 1
km distance with safe disposal sites as
3 Cum 98993.29
instructed by the engineer(SS/SP -
800).