5. Measurements checking:
5.1. Current inputs check:
DISPLAYED
INPUT CURRENT APPLIED VALUE CT RATIO APPLIED PRIMARY VALUE
(A)
IA 1.0∟0.0 3000 /1 A 3000.0
IB 1.0∟240 3000 /1 A 3000.0
IC 1.0∟120 3000 /1 A 3000.0
IN 1.0∟0.0 3000 /1 A 0
FOR IN TEST INJECT ONLY ONE PHASE
* The measurement Current: 0.05 to 3In
Accuracy: ±1.0% of reading As per (P54xEN AD/LB4 – (AD)-15)
DISPLAYED
APPLIED VALUE
INPUT VOLTAGE VT RATIO APPLIED PRIMARY VALUE
(V)
(KV)
VA-N 66.4∟0.0 380000 / 115 V 219.21
VB-N 66.4∟240 380000 / 115 V 219.5
VC-N 66.4∟120 380000 / 115 V 219.3
VAB 115∟30 380000 / 115 V 380
VBC 115∟270 380000 / 115 V 380
VCA 115∟150 380000 / 115 V 380
* The measurement Voltage: 0.05 to 2Vn
Accuracy: 1.0% of reading As per(P54xEN AD/LB4 – (AD)-15)
To avoid absence of fiber optic communication then blocking of differential protection element;
At Commission Tests menu, Set '' Test Loop back '' is '' Internal ''. Through HMI only.
According to the Catalogue for Technical Data – P543/en TD/ H53 – Page: 1
Set; DT Mode & Is1 = 0.4 In & K1 = 30 % & Is2 = 4 In & K2 = 150 %
Accuracy:
Instantaneous Operation: <30 ms.
According to the Catalogue for Technical Data – P543/en TD/ H53 – Page: 10
І – LOWER SLOPE
Connect the test circuit as shown figure.
A current is injected into the R phase which is used as the bias current and another current is
injected into the Y phase which is used as differential current.
Inject a bias current of 1A in the R phase. The relay will trip and any contacts associated with the R
phase will operate.
Slowly increase the current in the Y phase until phase Y trips . Record the phase Y current
magnitude and check that it corresponds to the following equation;
Id Calculated = 0.5 * (Is1 +I bias K1) A
Where; IS1 ; The Basic Diff Current Setting.
K1; The Lower Percentage Bias Setting.
Set; IS2 = 2 In
To check more than one point at the same slope, Change the bias current value and the equation
above can be used, and also for other differential settings '' Different slopes, Is1 ''.
Apply the above procedure for each phase.
Limits; ± 10 % According to the Catalogue for Commissioning and Maintenance – P54x/EN CM/G53 –
Pages No; 30 &
П– UPPER SLOPE
Repeat the test and check the result with the following equation;
Limits; ± 10 % According to the Catalogue for Commissioning and Maintenance – P54x/EN CM/G53 –
Pages No ; 30 & 31
Setting:
VTS time delay = 5s
VTS I> inhibit = 4A
Tested by: ALFANAR (AT&C) Witnessed by:
Name Name:
Signature & Date : Signature & Date :
31/10/2016
SITE INSPECTION AND TEST RECORD
Description: Contract No.:
Line Differential PROTN. Relay 4400003962/00
Acceptance Test (P546)
End Client: PAGE:
Contractor
SEC-COA 6 of 14
10.3.2-Loss of all 3 phase voltages under load condition test (detect 3p):
Fixed Setting: a- for fuse fail pick up; V1=10 volts.
b- for fuse fail reset; V1=30 volts.
10.4-SOTF TEST:
SETTING:
-SOTF active with PoleDead or External Pulse
-SOTF delay = 10 sec.
-TOC reset delay = 100 ms sec
Setting: All Zones Enabled
Apply fault condition and same time apply CB close command within the time set in TOC Reset
Delay, relay will be tripped by SOTF. If CB close command after TOC time then relay will be
tripped zone trip.
Measured Time
SOTF IN Internal detection External detection
(m sec) (m sec)
Zone 1 15.8 22.5
Zone 2 16.2 24.2
Zone 3 15.3 23.7
Zone 4 15.3 24.1
Setting
PSB unblock time delay = 8.5s
PSB reset delay = 2s
Setting:
Aid Dist delay =0 m sec
Unblocking delay = 100 m sec
TRev = 20 m sec
V. Blocking 1 Scheme:
Send logic: CS = ZM4 : OK
Trip logic: Trip = ZM2 w/o CR : OK
Apply a short pulse to DIST Channel Receive Input Without any fault Injection and
check Channel send is given: [OK]
Setting
WI V< V thresh = 45
WI trip delay = 300 ms
phase U ph setting U ph measured
Remark
(V) (V)
R 45.07 OK
S 45 45.03 OK
T 45.02 OK
Phase angle
RCA Voltage Current
lead lag
setting appllied setting
Pickup Dropoff Pickup dropoff
-60 56.4 0.2 210.8 30.7 29.4 209.4
Phase angle
RCA Voltage Current
lead lag
setting appllied setting
Pickup Dropoff Pickup dropoff
-60 6.4 0.2 30.77 210.5 209.8 29.7
Vn (3V0) measured
Vn(3V0) setting
Pick up Drop off
6 5.98 5.47
Settings:
Vn> (3Vo) =10V Scheme logic = POTT
IN >FW (3Io) =80mA Polarization = Zero
sequence
IN >RV (3Io) = 0.5 * IN >FW =40mA RCA: -60 degree
NOTE : Apply 3phase volts healthy voltage ( 2 sec ) , inject only one phase current for this
test to the phase under test and reduce voltage of phase under test.
Vo=Vn/3=(Va+Vb+Vc)
Aid DEF delay =300ms
OK
66.4 56.4 66.4 3.322 3.333 B 42 B 37
Vn (3V0) measured
Vn(3V0) setting
Pick up Drop off
1 0.95 0.93
Scheme: blocking 1
SEND: DEF STRV : OK
DEF AIDED TRIP : DEF STFW W/O CR: OK
Setting
WI V< V thresh = 45V
WI trip delay = 60ms
V< setting V< measured
Remark
(V) (V)
45 45.03 OK
RL29 H9 – H10 NO OK
RL30 H11 – H12 NO OK
RL31 H13–H14–H15 NC–NO–C OK
RL32 H16–H17–H18 NC–NO–C OK
TESTING EQUIPMENT FREJA 300