You are on page 1of 1

URH1b URH1 URH1a

1 2 3 4

URV5a

RV10a
RV5a
RH1b RH1a
F
RH1

URV10
URV5

RS1

RV10
RV5
RH2b RH2 RH2a
E

URV4

RS2

URV9
RV4

RV9
.

RS1
250
WD10 (T&B)

RH3b RH3 RH3a


E
D

URV8

WD10 (T&B)
RS3
URV3

RV3

RV8

RS2
250
1 RH4b RH4 1
C

URV7
URV2

RV2

RV7
RS4

RS3
250
-
RH5b RH5 RH5a
C
B

URV6
RV6
RV1

RS5
URV1

RS4
RH6b RH6

250
RH6a

A
RV1a

RV6a
URV1a

URH5b URH5 URH5a


B
1

RS5
250
2 3 4
ROOF PLAN
NOTES:- A
1. ALL ROOF SLABS TO BE 200mm THK. UNLESS OTHERWISE SPECIFIED.
2. WD10 FOR TOP AND WB 8 FOR BOTTOM.
3. ROOF BEAMS RV TO BE 400x800 (+550) UNLESS OTHERIWISE STATED.
4. ROOF BEAMS RH TO BE 400x800 (+550) UNLESS OTHERIWISE STATED.
5. ROOF BEAMS URV AND URH TO BE 200x800 (+600) UNLESS OTHERIWISE STATED.
6. (+1250) AND etc MEANT UPSTAND 1250mm FROM STRUCTURE LEVEL.
DESIGN LOAD
1. IMPOSED LOAD(LL) = 1.5 kN/m²
2. FINISHES = 1.2 kN/m² ROOF PLAN SLAB DETAIL
3. SOIL = 10.8 kN/m²

Surbana Jurong Consultants Pte. Ltd.


168 Jalan Bukit Merah #01-01 Connection One, Singapore 150168
Tel : + 65 62481288
www.surbanajurong.com
Company Regn No : 200304951Z