Professional Documents
Culture Documents
6:00 AM to 7:00 AM 1 0 4 0 0 2 1 2 1 0 0 0 1 0
7:00 AM to 8:00 AM 4 0 5 0 0 3 3 0 0 0 0 0 2 0
8:00 AM to 9:00 AM 2 5 3 0 0 6 2 3 3 6 0 0 3 0
9:00 AM to 10:00 AM 5 1 8 0 0 2 2 2 2 4 0 0 1 0
10:00 AM to 11:00 AM 2 4 5 0 0 4 0 1 4 2 0 0 4 0
11:00 AM to 12:00 PM 2 2 8 0 0 5 2 1 3 3 0 0 4 0
12:00 PM to 1:00PM 2 3 2 0 0 2 0 1 0 4 0 0 3 0
1:00 PM to 2:00 PM 1 1 1 0 0 1 0 0 0 2 0 0 2 0
2:00 PM to 3:00 PM 0 2 3 0 0 0 0 0 1 0 0 0 0 0
3:00 PM to 4:00 PM 1 0 2 0 0 0 2 1 0 0 0 0 0 0
4:00 PM to 5:00 PM 1 2 8 0 0 4 4 5 5 2 0 0 4 0
5:00 PM to 6:00 PM 0 4 10 0 0 2 2 3 3 2 0 0 2 0
6:00 PM to 7:00 PM 0 1 2 0 0 2 1 1 2 0 0 0 1 0
7:00 PM to 8:00 PM 0 0 0 0 0 0 1 0 0 0 0 0 1 0
8:00 PM to 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM to 10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 21 25 61 0 0 33 20 20 24 25 0 0 28 0
FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)
Name of the road:
Date of observation: 03.04.2019
Vehicle class
Bus / Tractors Tractors Cycle Horse Horse
Hour Car, Bus / with with Rickshaw cart / cart /
Auto Scoters / Minibus
Jeep, Minibus
Rickshow Motorbikes (Unladen Trucks Trucks trailer trailer / Hand Bullock Bullock
Van (Laden) (Laden) (Unladen) (Laden) (UnLade Cycles Cart Cart Cart Remarks
)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
6:00 AM to 7:00 AM 2 4 4 0 0 0 1 0 2 2 0 0 0 0
7:00 AM to 8:00 AM 1 3 6 0 0 0 2 0 0 5 0 0 0 0
8:00 AM to 9:00 AM 3 2 8 0 0 2 4 2 3 2 0 0 6 0
9:00 AM to 10:00 AM 4 4 7 0 0 5 2 3 4 3 0 0 2 0
10:00 AM to 11:00 AM 2 3 10 0 0 3 2 2 2 2 0 0 4 0
11:00 AM to 12:00 PM 5 5 5 0 0 3 1 5 6 0 0 0 2 0
12:00 PM to 1:00PM 1 4 7 0 0 2 3 2 2 4 0 0 5 0
1:00 PM to 2:00 PM 0 2 3 0 0 0 1 0 0 0 0 0 0 0
2:00 PM to 3:00 PM 0 1 4 0 0 0 2 0 0 2 0 0 0 0
3:00 PM to 4:00 PM 0 2 0 0 0 1 1 0 4 0 0 1 0
4:00 PM to 5:00 PM 0 2 5 0 0 1 0 2 2 2 0 0 2 0
5:00 PM to 6:00 PM 1 5 4 0 0 1 0 1 2 1 0 0 3 0
6:00 PM to 7:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 0
7:00 PM to 8:00 PM 0 1 0 0 0 0 0 0 0 0 0 0 0 0
8:00 PM to 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM to 10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 19 37 65 0 0 17 19 18 23 27 0 0 25 0
FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)
Name of the road:
Date of observation: 04.04.2019
Vehicle class
Tractors Tractors Cycle Horse Horse
Hour Car, Bus / Bus / with with Rickshaw cart / cart /
Auto Scoters /
Jeep,
Rickshow Motorbikes Minibus Minibus Trucks Trucks trailer trailer / Hand Bullock Bullock
Van (Laden) (Unladen) (Laden) (Unladen) (Laden) (UnLade Cycles Cart Cart Cart Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
6:00 AM to 7:00 AM 0 5 3 0 0 0 2 0 0 4 0 0 2 0
7:00 AM to 8:00 AM 2 4 4 0 0 3 3 0 0 2 0 0 1 0
8:00 AM to 9:00 AM 5 2 7 0 0 5 6 2 3 5 0 0 2 0
9:00 AM to 10:00 AM 2 3 6 0 0 4 2 1 2 3 0 0 4 0
10:00 AM to 11:00 AM 4 4 5 0 0 6 5 1 1 2 0 0 2 0
11:00 AM to 12:00 PM 2 3 7 0 0 4 2 3 2 1 0 0 3 0
12:00 PM to 1:00PM 1 3 3 0 0 3 3 4 2 2 0 0 2 0
1:00 PM to 2:00 PM 0 2 2 0 0 2 0 0 0 1 0 0 0 0
2:00 PM to 3:00 PM 1 1 4 0 0 1 1 0 1 0 0 0 0 0
3:00 PM to 4:00 PM 2 0 2 0 0 0 0 0 1 0 0 0 0 0
4:00 PM to 5:00 PM 1 5 5 0 0 5 3 0 2 5 0 0 1 0
5:00 PM to 6:00 PM 1 3 4 0 0 3 2 1 1 6 0 0 2 0
6:00 PM to 7:00 PM 0 0 1 0 0 0 0 0 0 1 0 0 0 0
7:00 PM to 8:00 PM 0 0 2 0 0 0 0 0 0 0 0 0 0 0
8:00 PM to 9:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9:00 PM to 10:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 21 35 55 0 0 36 29 12 15 32 0 0 19 0
Average Daily Traffic (ADT) Average Annual Daily Traffic (AADT)
Growth
Sl. No. Type of Vehicle Day-1 Day-2 Day-3 Average Sl. No. Type of Vehicle ADT AADT
Rate
1 1 20 12 6%
21 19 21 20
Car, Jeep, Van Car, Jeep, Van
2 2 32 20 6%
25 37 35 32
Auto Rickshow Auto Rickshow
3 3 60 37 6%
61 65 55 60
Scoters / Motorbikes Scoters / Motorbikes
4 4 0 0 6%
0 0 0 0
Bus / Minibus (Laden) Bus / Minibus (Laden)
5 5 0 0 6%
0 0 0 0
Bus / Minibus (Unladen) Bus / Minibus (Unladen)
6 6 29 18 6%
33 17 36 29
Trucks (Laden) Trucks (Laden)
7 7 23 14 6%
20 19 29 23
Trucks (Unladen) Trucks (Unladen)
8 8 17 11 6%
20 18 12 17
Tractors with trailer (Laden) Tractors with trailer (Laden)
9 9 21 13 6%
24 23 15 21
Tractors with trailer (Laden) Tractors with trailer (Laden)
10 10 28 17 6%
25 27 32 28
Cycles Cycles
11 11 0 0 6%
0 0 0 0
Cycle Rickshaw / Hand Cart Cycle Rickshaw / Hand Cart
12 Horse cart / Bullock Cart (pneumatic tyred carts) 12 Horse cart / Bullock Cart (pneumatic tyred carts) 0 0 6%
0 0 0 0
Horse cart / Bullock Cart (Solid-wheeled (iron rimmed) Horse cart / Bullock Cart (Solid-wheeled (iron rimmed)
13 carts) 28 25 19 24 13 carts) 24 15 6%
Total commercial vehicle per day (cvpd) Total commercial vehicle per day (cvpd)
97 77 92 89 90 56
Total motorised vehicle per day Total motorised vehicle per day
204 198 203 202 202 125
Total non-motorised vehicle per day Total non-motorised vehicle per day
53 52 51 52 52 32
DESIGN OF FLEXIBLE PAVEMENTS FOR RURAL ROADS
As per IRC:SP:72-2015
1 Twenty four hour traffic counts over a period of 3 days taken on a single lane rural road
during the peak harvesting season, yielded the following results average daily traffic
Average daily traffic
1 Car, Jeep, Van 20
2 Auto Rickshow 32
3 Scoters / Motorbikes 60
4 Bus / Minibus (Laden) 0
5 Bus / Minibus (Unladen) 0
6 Trucks (Laden) 29
7 Trucks (Unladen) 23
8 Tractors with trailer (Laden) 17
9 Tractors with trailer (Laden) 21
10 Cycles 28
11 Cycle Rickshaw / Hand Cart 0
Horse cart / Bullock Cart (pneumatic tyred
12 0
carts)
75 mm WBM Grade-3
GRADE
(CBR)
SUB
3 to 4 75 mm WBM Grade-2
175 mm GSB
50 mm BM
0/0 TO
(CBR)
3 to 4
6/500 150 mm WMM
175 mm GSB
Pavement design: Design Pavement Adopted
Average CBR of soil = 3 to 4
Traffic Category = T3
Existing crust = 0 mm
Proposed GSB = 175 mm
Proposed base = 150 mm
Proposed Bituminous Macadam = 50 mm
Proposed Surface course(SDBC) = 25 mm Surface Dressing
From the fig. 3, IRC: SP- 72-2015 it is OK.