Module IV

Activity

“Draft me a watertight contract”

A hotel wishes to refurbish a conference room by replacing the floor


and ceiling finishes. It is essential that the work is of the highest
quality but also that minimal disturbance is caused to the running of
the hotel.

(i) Which standard form of contract would you use?

(ii) Identify the main elements which would be included in the


contract for the work to ensure that the hotel management’s
objectives are met?