You are on page 1of 9

AD

1. Valid references for BHL - caap & zoning ordinance


2. Roof slope - 2%
3. Green building code approved by - client? tgfa?
4. MRF location - GROUND FLOOR, REAR SITE
5. Largest turning radius - OUTER
6. City bus
7. Part of bldg free of columns - uppermost
8. Distance of columns: not soil
9. Factors of AMBV:
10. Occupancy load factor: a. di kasama weight ng occupants
11. R-1 -
12. R-2 -
13. R-3 -
14. R-4 -
15. POOL PUMP ROOM - offsite, ABOVEGROUND, under
16. more on maam’s reviewer
17. Slab depression (grass) - 300mm
18. Slab depression (tree) - 1200mm
19. Slab depression (pool) - 1200-1500mm
20. Slab depression (bathroom) - 50-75mm
21. ISA - driveway
22. USA - exposed soil
23. TOSL - courtyards, gardens, wells
24. PSO - bldg foorprint
25. Group H, Division 2: occupant 300 or more without stage
26. PESTLE
27. Which materials are the most expensive? - GRANITE
28. Which materials are the most expensive? - NATURAL WOOD PLANKS
29. Setback of 2 buildings in the same property? 2x the setback
30. Which of the following risks - INFLATION RISK
31. Which of the ff are not considerations - PAST USE
32. Kitchen - Afternoon sun
33. Bedroom - Morning sun
34. Fire exit location - farthest from each other
35. Emboss of signage - 1.0mm
36. Hotel Star Rating - DOT
37. Board exam - RA 9266
38. Biggest room - Genset(?)
39. Smallest room - EE, Telcom, Genset, Meter vault
40. Site planning
41. Space planning
42. not part of physical attributes - location of tree on site, hydrologic, geologic, climate
43. not part of biological - soil… ?
BU
WATER SYSTEM
1. 5 storeys - sprinkler system
2. 4 storeys - standpipe system
3. Most common sprinkler system - WET system
4. Standard sprinkler min. Coverage area - 20.90sqm
5. Type of water system used for sprinklers -
6. Low pressure, need increase - BOOSTER PUMP
7. Dewater foundation pit, tunnel- SUBMERSIBLE PUMP
8. Fire pump in the PH - JOCKEY PUMP
9. Stop grease and oil - TRAP
10. TRAP function - prevents sewer gas from leaking
11. Graywater - water from urinal without waste
12. Cistern tank not required - Irrigation Tank
13. Graywater system
14. Process that removes color from water: CHLORINATION
15. Process before water is safe to use by occupants: STERILIZATION

HVAC
16. Willis Carrier - aircon
17. Any device that cools - AIR CONDITIONER
18. Cooling unit with condenser & evaporator in same casing - Window-Type AC
19. NOT recommended for LRT-4 - Window-Type AC

ELEVATOR
20. Used for serving food: DUMBWAITER
21. For furniture, goods, etc.: FREIGHT ELEVATOR
22. Elevator 12-storey school - ELECTRONIC
23. Elevator for high-rise - ELECTRONIC
24. Elev for LRT 4 station - HYDRAULIC (used for 4-11 storeys high)
25. Elisha Otis - inventor of safety service elevator
26. Row of elevators - Bank

ESCALATORS
27. Inclination - 30deg
28. Configuration for Malls: Walk-around
29. Configuration for airport: Parallel
30. Configuration for multi-storey office bldg: Cross-over
31. Configuration for LRT-4 Station: Parallel

LIGHTING
32. Lighting in computer laboratory - Direct, Indirect, ???

SOUND
33. Architectural acoustics
34. Concrete - Reflect
35. Soft sofa - Absorption
36. Plants - Absorption
37. Rough surface - Diffuse
38. Material surface changes sound
39. What to do when sound travels through air -
Diffusion?

HOA
1. “For wrestling” (Roman times): PALAESTRA
2. National artists odd one out (Federico Ilustre)
3. ODD ONE OUT: Donatello, Michelangelo, Calatrava, Bernini
4. Lower flr of Bahay na bato - ZAGUAN
5. Malacanang is to Philippines, Potala Palace is to Tibet
6. Sukhothai & Ayutthaya - THAILAND
7. Indigenous houses in the Batanes islands: Ivatan
8. Visayas houses: Balai
9. UST central seminary: OCAMPO
10. Oscar Niemeyer famous work: Brasilia
11. Later variant of art deco: Streamline moderne
12. Art characterized by whiplash, floral - Art Noveau
13. Tenochtitlan: Mexico
14. Royal house in Marawi: Torogan
15. Philippines is to Malacañang, as Tibet is to Potala Palace
16. Shell used in windows in Philippines: Placuna Placenta
17. Frank Gehry archi style: Deconstructivism
18. Slight curve in Greek column - ENTASIS
19. Neovernacularism - Leandro Locsin
20. Mathematical relationship showing sacred geometry - Golden Ratio
21. Assemblyman Pre-war Schools - ISAURO GABALDON
22. First renaissance architect - Filippo Brunelleschi
23. Motte & bailey castle - Romanesque & Dark Ages
24. Roman cement volcanic tuff - POZZOLAN
25. Wall of china - SECURE CHINA FROM BARBARIANS (MONGOLS)
26. Alhambra Spanish - MOORISH
27. Architectural & engineering innovation contributions - EIFFEL (/all of the above
28. INTERCOLUMNATION
29. DORIC - simplest classical order
30. TUMULUS
31. BENT PYRAMID - of Ceneferu
32. MASTABA
33. CHURRIGUERESQUE
34. STONEHENGE
35. ZIGGURAT OF UR
36. COMPOSITE
37. BOROBUDUR
38. BURJ KHALIFA
39. MARINA BAY SANDS
40. Japanese paper: WASHI
41. WAT
42. COLONIZATION
43. Hexastyle peripteral
44. HYPOSTYLE
45. Other term for mosque: MASJID
46. Gopuram : Torii
47. Japanese warrior class : Samurai
48. Wall facing direction of Mecca - Qibla
49. Okir - NAGA & FERN

PP
1. Group E: Business Mercantile
2. Wheelchair - # of seats passenger AIRPLANE - 2
3. Wheelchair turning radius - 1.50m
4. Parallel parking - 2.15 x 6m
5. Diagonal parking - 2.5 x 5m
6. Perpendicular parking - 2.5 x 5m
7. Articulated truck parking dim - 3.6m x 18m
8. Jeep parking dim - 3 x 9m
9. Height of Light switch. To BP344 - 1.20-1.30m
10. Handrail over ramps - 0.70 - 0.90m
11. ADC specialist the jury can call for info about the competition - Technical advisor
12. Final payment
13. Approved form of security furnished by the contractor and his surety as a guarantee to faithfully
comply with the contract in respect to its obligations to its workers, subcontractors, and suppliers -
PAYMENT BOND
14. RFP of repeated bldg design for the 3rd time - 30% (40% ata to - Kla)
a. (1st time - 50%, 2nd time - 40%)
15. CHANGE ORDER
16. Property easement chuchu - YARD
17. Limits TGFA - INCREMENTAL SETBACKS
18. To not overbuild - INCREMENTAL SETBACKS
19. Front SETBACK for R1 - 4.50m
20. Front SETBACK 15m RROW - 5m
21. Data gathering - Schematic design
22. Monitoring construction - Construction Administration (CA)
23. QUALITY CONTROL
24. Additional info to bid documents - BID BULLETIN
25. BHL meaning - Building Height Limit
26. SSS meaning - Social Security System
27. PhilHealth Hospitalization - Z Benefits
28. Funeral Benefits
29. Compulsory retirement 60-65yrs old - Labor Code
30. Spp 203 - Specialized Archi services
31. Spp 205 - Post-Construction management
32. OWNERSHIP OF COPYRIGHT
33. ZONING ORDINANCE
34. CFA
35. GFA
36. PARTNERSHIP
37. MARKET-BASED
38. RA 9514 is the - Fire Code
39. Client’s written and oral advice chuchu - CONSULTATION
40. Undertakes in ADC to promote a design…: ARCHITECT
41. PAGIBIG Home Loan - BOTH (Construct a Unit, Renovate)
42. Housing & Human settlements - DOC 220
43. Z Package
44. Death Benefit
45. 21st century … - Global(?)
46. ramp for accessibility - 1:12
47. ramp for pedestrian - 1:12(?

You might also like