PT PLN (Persero) MONITORING KEDALAMAN BOREPILE NO.

TOWER
UPP KALBAGTIM 2
PEKERJAAN PEMBANGUNAN SUTT 150KV GI TANJUNG SELOR - GI TIDANG PALE SEC.3
PUSMANPRO
T.314 (AA2+12) TYPE II L6-20
Pekerjaan :Borepile Tanggal : 04 April 2023
No.Kontrak :NO.20.PJ/KON.02.02/APLN/UIP KALBAGTIM/2019
Leg A 1 2 3 4 5 6 7 8 9 10 11 12
Rencana 6.00 6.00 6.00 6.00 6.00 POLA BOREPILE GROUP
Aktual 6.00 6.00 6.00 6.00 6.00 LEG B
Kedalaman Lubang bor
LEG A
Keterangan Dimensi Pad 3m x 3m x 0.55m
4 6 3
Leg B 1 2
Rencana 6.00 6.00 6.00 6.00 6.00 7 ARAH TOWER
2 9 3
Kedalaman Borepile
Aktual 2.85 2.45 2.75 2.35 2.25 2.35 1.55 2.75 2.85

Keterangan Dimensi Pad 4m x 4m x 0.55m 5 8 1 5 4

Leg C
Rencana 6.00 6.00 6.00 6.00 6.00
Kedalaman Borepile
Aktual 2.10 1.65 1.75 1.50 1.85 1.70 0.70 1.25 1.85
2 6 1
1 2
Keterangan Dimensi Pad 5m x 5m x 0.55m

Leg D 7 9 ARAH TOWER 5 7 6


3
Rencana 6.00 6.00 6.00 6.00 6.00
4 3
Kedalaman Borepile
Aktual 5.40 5.50 5.40 5.10 5.00 4.00 5.00
4 8 5
Keterangan Dimensi Pad 3m x 3m x 0.55m
LEG C LEG D