You are on page 1of 1

PMAY-YSR(U) BLC UDA

ChollangiR°ta
Name of (olôny -

2018-19 &2021-22 Name of


the D.E. E

GP- ChollangiPek a of the A.E


V2 M(DE:)
Name

enkaca(M)
Bank Value o
Materials at slte
epcured by benefclary for the next stago) Name of the WI.
29
SI. Plot
Name of the
Beneficiany
Father's/Husband's
Name
Ac
No.
PhyswosName
cal Done As
stage the
o

Quantty Value Total


CASH
DEDUCTIONS
CEMENT STEEL NK
Total NET PAYABLE TOo

NoNo. Stag Material (7+10) MATERI- OtherseBen-


9 0
Rs.
BAGS VALUEQTY VALUE ALS duc-
tions ef
VK
AF &&
VALUE
Ciary
12 13 14 15 16
(oyufed
thot uefallooivg_benk eiavi have
11 8 19 20 21 22 23

ied
h e hovey hehce utoe HollbkJnb_Jg NerTd Presrnk t
SNOName of |beneciavyFateH
221. katiPakkotamma Shinkav Rao 022ac n53 9%G3 8elHeL.

022taNe o+2 3633 BBLBL


Arpplokam
2ce2 Ri D nglu 02 an NPE|539G63 RL PC
2012 3 Dukta Aroyamma RC +ppleHon.
C22NPT y23/6O.
201-2) 4. Uthada okmi Rambabu

ngineering Assistaht
Chollangipeta Saetivatyam
Denkada (M), VZM (Dt
CERTIFICATE DEPARTMENTAL MATERIALS AT SITE ACCOUNT (Colony a whole) as
the construction work as per the stage Name of the MaterialQuantity Supplied Quantity Utilised
Verified & Certified that the above beneficiaries have completed SI.No. BALANCEE
than the standard measurements, specifications QUANTITY L VALUE
shown at col. 6 and the house measurements are not less 5
recorded at page nos. of M.B.
are not inferior to the standard specifications

No.

Asst. "ngineer (Housing)


Section. Asst. Engineer (Housing)
Section