Professional Documents
Culture Documents
General Information
Revision -
Type of Notification* Revised
Notification
Previous Notification # 2020-04078
This electronic form is not acceptable for projects in Philadelphia and Allegheny Counties. Please
see: Link to Asbestos Information (Philadelphia) or Link to Asbestos Information (Allegheny
County).
"Lehigh -
Project Location* Allentown
City"
Facility Information
Job # (optional) 20201
Facility Name* Allentown State Hospital - 01
PA
Zip code* 18109
Present Use Type* None/Empty
Number of floors 4
Approximate Age in Years 49
Facility Owner
Owner Name* Department of General Services
City* Harrisburg
State* PA
Zip code* 17125
Street Address
City
State PA
Zip code
Contact
Telephone No
I agree true
Owner/Operator Agreement
I hereby certify that an individual trained in the provisions of 40 CFR Part 61 subpart M (if applicable) will be
on-site during the demolition or renovation and evidence that the required training has been accomplished by
this person will be available for inspection during all working hours, and certify that all work will be done in
accordance with all applicable federal, state, and local agency rules and regulations.
I agree true
I hereby certify that the foregoing statements and the information contained in this notification form are true. This
certification is made subject to the penalties set forth in 18 PA C.S 4904 relating to unsworn falsification to
authorities.
I agree true
Demo Contractor/Schedule Info
Contractor Information
Is the demolition contractor the same as the Greenport user?* No
Company Name Neuber Environmental Services, Inc.
City Gilbertsville
State PA
Operation Schedule
Start Date* 01/11/2021
to 06:00 PM
Facility Inspection
Building Dominick DeFazio
Inspector
Certification
040641
#
Building
Inspector Cocciardi and Associates, Inc.
Company
Date of 08/27/2018
Inspection*
Is any
material
assumed to No
be
asbestos?
Procedure,
including
analytical
method, if
appropriate,
appropriate,
PLM / TEM
used to
detect the
presence of
asbestos
material
Is any type
of asbestos Yes
present?
Location of
Type of Material Material Amount Type of Final
Material Units
ACM Type Description of ACM Abatement Clearance
(room/floor/area)
PCM
FRI LF
(Friable Pipe Throughout 3110 (Linear REM (Phase
Insulation building (Removal) contrast
ACM) ft)
microscopy)
PCM
FRI SF
(Friable Other fire proofing Throughout 78580 (Square REM (Phase
ACM Type* building (Removal) contrast
ACM) ft)
microscopy)
Is this
project
Yes
regulated by
NESHAP?