You are on page 1of 1
Ne Directorate of Agricultu Engineering Multan Re; Multan, Dated___ 2023 To |. Agricultural Engineer (Field) Multan 2. Agricultural Engineer (Field) Bahawalpur 3. Agricultural Engineer (Field) DG. Khan 4. Agricultural Engineer (Field) Layyah 5. Agricultural Engineer (Field) Sahiwal Subject: - ‘S_APPROVED IN THE OF THE PROJECT TITLED: “REHABILITATION OF OLD__BULLDOZERS — FOR SUSTAINABLE LAND DEVELOPMENT WORK TO ENSURE FOOD SECURITY” FOR THE 202. As per the PC-1 of the subject project, there were 107 bulldozers of Multan Region, whom tracks were to be replaced, out of which 36 bulldozers were fitted with new tracks during the year 2022-23. The list of remaining bulldozers, of your division, according to PC-I whom tracks have to be fitted during this year is attached herewith. You are directed to update the life covered by the tracks of these bulldozers. Life covered will be calculated up to 31-07-2023 and the total life covered by the bulldozer may also be updated (Proforma attached). Furthermore, bulldozers whom tracks have not covered 10,000 hours yet and are included in PC-I, should not be fitted new tracks until the completion of their life, Update the proforma and submit to this office by 25-07-2023 positively. ¢ rect Agricultural Enginering Multan Region,

You might also like