Ne
Directorate of Agricultu
Engineering Multan Re;
Multan,
Dated___ 2023
To
|. Agricultural Engineer (Field) Multan
2. Agricultural Engineer (Field) Bahawalpur
3. Agricultural Engineer (Field) DG. Khan
4. Agricultural Engineer (Field) Layyah
5. Agricultural Engineer (Field) Sahiwal
Subject: -
‘S_APPROVED IN THE
OF THE PROJECT TITLED: “REHABILITATION OF
OLD__BULLDOZERS — FOR SUSTAINABLE LAND
DEVELOPMENT WORK TO ENSURE FOOD SECURITY”
FOR THE 202.
As per the PC-1 of the subject project, there were 107 bulldozers of
Multan Region, whom tracks were to be replaced, out of which 36 bulldozers
were fitted with new tracks during the year 2022-23. The list of remaining
bulldozers, of your division, according to PC-I whom tracks have to be fitted
during this year is attached herewith.
You are directed to update the life covered by the tracks of these
bulldozers. Life covered will be calculated up to 31-07-2023 and the total life
covered by the bulldozer may also be updated (Proforma attached).
Furthermore, bulldozers whom tracks have not covered 10,000 hours yet
and are included in PC-I, should not be fitted new tracks until the completion of
their life, Update the proforma and submit to this office by 25-07-2023 positively.
¢ rect
Agricultural Enginering
Multan Region,