DAILY PLANT INSPECTION TOUR NAME: محمد ابن سليم DATE/TIME: 11/1/2023 10:33 COMPRESSOR ROOM ITEM STATUS(LOAD%/UNLOAD/OFF) COVERS NOTES COMPRESSOR 1 RUN FALSE 0% COMPRESSOR 2 RUN TRUE 17% COMPRESSOR 3 RUN FALSE 0% COMPRESSOR 4 RUN TRUE 44% COMPRESSOR 5 RUN TRUE 24% MCC ROOM ITEM AMBIENT TEMPERATURE PANELS NOTES MCC-PH1 20 SWITCH GEAR 20 MCC-PH2 18 LINE 1 ITEM STATUS (RUN/STOP) NOTES EXTERNAL BELT RUN FALSE CRUSHERING RUN FALSE BALL MILL RUN FALSE ALPHA1 RUN FALSE ALPHA2 RUN FALSE TFS1 RUN FALSE TFS2 RUN FALSE ALPHA COATING RUN FALSE TFS COATING RUN FALSE GRANULATE RUN FALSE LINE 2 ITEM STATUS (RUN/STOP) NOTES EXTERNAL SCREW RUN FALSE BALL MILL RUN FALSE ALPHA1 RUN FALSE ALPHA2 RUN FALSE TFS1 RUN FALSE TFS2 RUN FALSE ALPHA COATING RUN FALSE TFS COATING RUN FALSE PACKING AREA ITEM (RUN/STOP) PRODUCT TYPE ITEM (RUN/STOP) PRODUCT TYPE PACKER N-PH1 RUN FALSE CEMENT PACKER N-PH2 RUN FALSE PACKER T-PH1 RUN FALSE PACKER T-PH2 RUN FALSE BIGBAG G-PH1 RUN FALSE BIGBAG N-PH2 RUN FALSE BIGBAG N-PH1 RUN FALSE BIGBAG T-PH2 RUN FALSE BIGBAG T-PH1 RUN FALSE TWO SPOUT RUN FALSE LIGHTING (SHIFT A ONLY) ITEM ON/OFF NOTES CRUSHER LIGHTING ONFALSE