You are on page 1of 5

ANTI BLANK FIRING KIT INSTALLATION

XM500HD

Release the hydraulic pressure from the


boom system and raise the main valve
mounting frame. See instructions in the
boom manual.

Fit the hydraulic run-tee connector to


the hydraulic line going from the main
valve to the lift cylinder front end.

Fit the pressure switch.


ANTI BLANK FIRING KIT INSTALLATION
XM500HD

(*) Wrap the unused cable in plastic


Fix the BFE relay box in a safe and fix inside of the pedestal.
position inside pedestal using 4 mm
screws (4 pcs.)

Unplug the control cables from


valve actuators for the hammer and
connect one cable (*) to the input
connector of the BFE box

Connect the BFE output cables to


the valve actuators
ANTI BLANK FIRING KIT INSTALLATION
XM500HD

Circuit diagram & part list


BFE 154756 Anti Blank Firing Switch Proportional hammer actuator
950218 1 Housing complete 160x80x56 Ensto DPCP081606G
S72 951492 1 Pressure Switch (programmable) Hydac EDS 345-1-250-000
K71 951290 2 Signal relay 24V Omron G2R-1-SND + P2RF-05-E
X71 940010 10 Terminals Entrelec M4/6-serie
X73/X74 951286 2 Appliance connector (plug) + seal Hirschmann GDM 3009 + GDM 3-17
X75 951287 1 Appliance connector (base) + seal Hirschmann GSA 3000 + GSA 200-5

Note!
All components are factory-wired.
(No electrical installations are required when the
switch is installed on the boom.)
ANTI BLANK FIRING KIT INSTALLATION
XM500HD

Pressure switch adjustment


The pressure switch only allows the
hammer to be “fired” when there is
enough hydraulic pressure in the lift
cylinders pressing the hammer against
a rock.

The switching point “S.P.1” is factory


set to 75 bar, but it can be adjusted
according to the attached instructions.

Disconnect the hammer actuator cables


from the main valve before adjustments
and activate the “Hammer fire” button to
energize on the pressure switch.
ANTI BLANK FIRING KIT INSTALLATION
XM500HD

HYDAC EDS 300


adjustment

You might also like