You are on page 1of 2

Team #5 Version 1.

0
Rodrigo de Jesús Aguilar,
Melisa Sanchez, José
Esteban Rangel &
Members Francisco Javier Balderas
System Description This software program to be developed is integrated into the project focused on seismic prevention and assurance of social safety.

Interview #1 || SRS Feacture


Date number UC V&S (2.2) SRS FR SRS NFR S.G Module Figma Screen Comments
F7_FR001 It must include fields to enter
information about the sensor number,
its identification code and its location.
F7_NFR001.- The system shall
deploy a list of country and state
The sensor registration to be selected by the user.
interface allows users to enter F7_NFR002.- The system shall
Interview 2 || Feature 4.10: Sensor BD Sensor Data
T05SR010 detailed data about all the encrypt the data entered for
16/10/2023 registration Questionnaire
sensors that will be feeding information security.
information to the platform. F7_NFR003.- The system shall
show the "back" button in the
bottom left corner.
F7_NFR004.- The system shall
show the submit button next to Screen007
the information entered.
F8_FR001 It must include fields to enter
information about the user, such as
their first name, last name, the type of
user they are, email, and a password.
F8_NFR001.- The system shall
hide the registered country with
asterisks.
The sensor registration
F8_NFR002.- The system shall
interface allows users to
encrypt the data entered for
Interview 2 || Feature 4.11: User register on the platform, either BD User Data
T05SR011 information security.
16/10/2023 registration as administrators of a building Questionnaire
F8_NFR003.- The system shall
or as administrators of the
show the "back" button in the
platform.
bottom left corner.
F8_NFR004.- The system shall
show the submit button next to
the information entered.
F8_NFR005.- The system shall
deploy a list of user type to be Screen008
selected.
F9_FR001 The system must be practical
so that the user knows how to use it.
F9_FR002 To use the 3D section you
must be connected to the internet.
F9_FR003: The system should load the
sections in less than 3 seconds and is
convenient to use
F9_FR004: The system will be friendly
for people who know nothing about
computers.
F9_NFR001.- The system shall
deploy a list of registered
buildings to be selected.
F9_NFR002.- The system shall
The main interface of the
show a text of recomendations
software allows users to
about health building of the
interact with the platform to
building selected by the user.
analyze buildings and obtain
F9_NFR003.- The system should Earthquake
Feature 4.1 Building information about their seismic
Interview 2 || display a 3D model of the simulation in the
Health Status T05SR001 safety, with a simulation of a 3D
16/10/2023 selected building with rotation building and
Interface model of the building and a
without animation to start the recommendations
hypothesis of how a building
simulation.
would move during an
earthquake based on the data. F9_NFR004.- The system shall
of the DB. display the motion animation
with rotation made by the mouse
movements.
F9_NFR005.- The system shall
show the "start simulation"
button above the 3D model.
F9_NFR006.- The system shall
display the rotation of the
modeling smoothly, as well as
the simulated motion of an
earthquake.
F9_NFR007.- The system shall
allow the user to scroll vertically Screen009
to review the full text of the
recommendations.
F10_FR001: The system must provide a
clear and understandable assessment
of the structural quality of the building.
F10_FR002: The platform should
present the building's risk level in a
graphical format, such as a color graph
or scale.
F10_FR003: The system will use a visual
representation of colors to indicate the
level of risk, with colors such as green
representing low risk and red
representing high risk.
F10_FR004: The system must provide
clear and specific recommendations for
prevention or repair of the building
A Structural Safety Prevention based on its level of damage and risk.
screen that provides an F10_FR005: The platform will offer
Feature 4.2
Interview 2 || assessment of the building's support for multiple languages if the Building quality
Structural safety T05SR002
16/10/2023 quality, level of structural platform is used internationally. assessment
prevention
damage, level of risk, and F10_NFR001.- The system shall
prevention suggestions. deploy a list of registered
buildings to be selected.
F10_NFR002.- The system shall
display a color-coded rubric on
structural health, with fields on
indications, meaning and color.
F10_NFR003.- The system shall
indicate with an arrow on a
color-coded thermometer the
structural health score of the
selected building.
F10_NFR004.- The system shall
update the position of the arrow
according to the result of the Screen010
structural health of the building
selected.
F11_FR001: It should display real-time
data on ground vibrations, allowing
users to follow current seismic activity.
F11_FR002: Use an advanced
algorithm to anticipate earthquakes or
earthquakes well in advance (in this
case, 30 minutes).
F11_FR003: Issue a safety alert when
an earthquake or earthquake is
anticipated.
F11_FR004: The alert should be clear
and easy to understand, and may
include details such as estimated
intensity.
F10_NFR001.- The system must
display building, node and sensor
lists for user selection.
An effective and reliable seismic
F10_NFR002.- The system should
monitoring display that can
show the spectrum section
provide accurate and early
empty when the analysis has not
Interview 2 || Feature 4.5 Seismic information on seismic events Real-time seismic
T05SR005 started.
16/10/2023 monitoring in real time, contributing to monitoring
F10_NFR003.- The system should
public safety with an alert it
display the "watch now" button
issues in the event of an
in the upper right corner of the
earthquake.
canvas.
F10_NFR004.- The system must
show the date and period of
hours of the analysis performed.
F10_NFR005.- The system must
display the spectrum generated
from the analysis carried out on
the building, node and selected
sensor.
F10_NFR006.- System
performance should show real-
time spectrum fluctuations.
F10_NFR007.- The system must
protect the sending of
information from the building Screen011
monitoring system to avoid
losses.

You might also like